ML20150B579

From kanterella
Jump to navigation Jump to search
Responds to NRC Re Violation Noted in Insp Repts 50-280/77-30 & 50-281/77-30
ML20150B579
Person / Time
Site: Surry  Dominion icon.png
Issue date: 12/07/1977
From: Stallings C
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20150B578 List:
References
NUDOCS 7811010415
Download: ML20150B579 (1)


Text

__

VruozxrA EI.ECTRIC AND Powen COMPANY Rictswonx),Vzmonw sA 2026: ~l h -December 7, 1977 Mr. James P. O'Reilly, Director Serial No. 526/111477 Office Of Inspection and Enforcement PO&M/ TAP:wbh U. S. Nuclear Regulatory Commission- Docket Nos. 50-250 Region II - Suite 818 50-251 230 Peachtree Street, Northwest License Nos. DPR-32 Atlanta,. Georgia 30303 DPR-37

Dear Mr. 0'Reilly:

This is in response to your letter of November 14, 1977, in refer- >

ence to the inspection conducted at Surry Power Station on October 4-7, 1977, and reported 1n I.E. Inspection Reports 50-280/77-30 and 50-281/77-30.

We have reviewed your letter and the enclosed inspection report.

Our response to the specific non-compliance item is contained in the attach-ment to this letter.

We have determined that' no proprietary information is contained in the reports. Acco dingly, the Virginia Electric and Power Company inter-poses no objection to these inspection reports being made a matter of public disclosure.

Very truly yours, I

'. <  %:.,l [tsr e r.Y C. M. Stallings Vice President-Power Supply anc Production Operations

Attachment:

5 copies

-cc: Mr. Robert W. Reid I

i l

780.010 % l l