Text
..
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-313 UNIT 1
D ATE 10-11-78 COMPLETED f;y C. N. Shively TELEPfl0NE 501/968-2519 MONTil SeP_t emb er DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net)
(MWe Net) 3 811 17 661 2
All 18 769 3
813 39 777 4
R12 20 816 21 810 5
R10 6
809 22 816 7
810 23 R?n 8
ROR 24 821 9
807 25 820 10 An7 26 822 11
_ &O8 27 821 12 811 28 821 13 812 29 821 14 R19 30 R96 15 Al?
31 NA 16
_451 INSTRUCTIONS On thh format, hst the average daily unit power inel in MWe-Net for each day lii the ieporting inonth. Coiripute to the nearest whole nwgawatt.
(9 /77 )
7&o 2.oo,7o
4 s
OPERATING DATA RLPORT DOCKET NO.
50-313 DATE in_11_7g COMPLETED BY c'. M. shively TELEPHONE 501/968-2519 OPERATING STATUS
- UI'*
- 1. Unit Name:
Arknn m Nuc1onv Ono
- 2. Reporting Period: Sentember 1 - September 30, 1978
- 3. Licensed Thermal Pow er (M% t p
?s6R
- 4. Nameplate Rating (Gross Mbe):
902.74
- 5. Design Electrical Rating (Net MWe): 850
- 6. Maximum Dependable Capacity (Gross MWe): 883
- 7. Maximum Dependable Capacity (Net MWe):
836
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
Nnno
- 9. Power Lesel To Which Restricted. lf Any (Net MWe):
None
- 10. Reasons For Restrictions. lf Any:
NA This Month Yr..to.Date Cumulative
- 11. Hours in Reporting Period 720.0 6551.0 33162.0'
- 12. Number Of Hours Reactor was Critical 711.6 4603.0 23532.0
- 13. Reactor Reserve Shutdown Hours 0.0 647.6 1966.3
- 14. Hours Generator On.Line 709.0 4509.3 23044.7
- 15. Unit Resene Shutdown Hours 0.0 113.7 205.2
- 16. Gross Thermal Energy Generated (MWH) 1796653.
10931362.
55373888.
17 Grow Electrical Energy Generated (MWH) 547670 _,,,
3653430.
18399341.
- 18. Net Electrical Energy Generated (MWH) s71sR6-1484814.
17550564.
- 19. Unit Service Factor 98.5 68.8 69.5
- 20. Unit Availability Factor 98.5 70.6 70.1
- 21. Unit Capacity Factor (Using MDC Net) 95.0 63.7 63.3
- 22. Unit Capacity Factor (Using DER Net) 93.4 62.7 62.3
- 23. Unit Forced Outage Rate 1.5 13.0 11.7
- 24. Shutdowns Scheduled Oser Next 6 Months (Type. Date, and Duration of Eacht:
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior io Commercial Operation):
Forecast Achieved INITI A L CRITICALITY INITIAL ELECTRICITY COMMERCI AL OPER ATION (9/77 )
j
UNIT SEIUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-313 UNIT NAME ANO-Unit I DATE 10/2/78 REPORT MONTil Sept.,1978 COMPLETED BY
_C.N.
Shively TELEPfl0NE 501-968-2519
~.
=
-a $
E
,s?
Licensec f
.=E e_
t has been submitted i
for Cveles 2 and 3
[I I
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
11-1-78 c
6.
Important licensing considerations associated with refueling, e.g.,
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
t Will reload 64 f resh fuel assemblies and operate for appro xima tel y 16 months
}
]
4 m.
7.
The number of fuel assemblics (a) in the core and (b) in the spent fuel storage pool, a) 177 b) 112 4
8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblics.
r present 590 increase size by 0
9.
The projected date of the last refueling that can be Oischarged to the spent fuel pool assuming the present licensed capacity.
1 DATE: March 1988 e
l-f
[
E CORRECTION N
~
OPER ATING DATA' REPORT DOCKET NO.
__50-313-DATE
_7-11-78 COMPLETED BY c _ C. N. Shively-TELEPHONE. 50) /968-2519 OPERATING STATUS -
- 1. Unit Name: - Arkansas Nuclear One-Unit 1 N l'5
- 2. Reporting Period: - June 1, 1978 - June 30, 1978
- 3. Licensed Thennal Power (MWt U 2568
- 4. Nameplate Rating (Gross MWe):
902.74 5,' Design Electrical Rating (Net MWe):
850
- 6. Maximum Dependable Capacity (Gross MWe):
803
- 7. Maximum Dependable Capacity (Net MWe)!
836
- 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report.Give Reasons:
Nnne i
4
- 9. Power Level To Which Restricted. If Any (Net MWe):
None
- 10. Reasons For Restrictions,if Any; NA This Month Yr..to Date Cumulative :
- 11. Ilours In Reporting Period 72 0, 0___
4343.0 30954.0
- 12. Number Of llours Reactor Was Critical 717.8 2419.4 21 M.4
- 13. Reactor Reserve Shutdown flours 0.0 647.6 1966.3
- 14. Hours Generator On Line 712.2 2333.2 20868.6
- 15. Unit Reserve Shutdown flours 0.0 113.7 205.2-
- 16. Gross Thermal Energy Generated (MWil) 1812874.0 5399444.0 49841970.0
- 17. Gross Electrical Energy Generated (MWH) 611452.0 1816562.0 16562473.0
- 18. Net Electrical Energy Generated (MWil) 585542.0 1733105.0 15793855.0 l
- 19. Unit Service Factor 98.9 53.7 6 7. 4. -
- 20. Unit Availability Factor 98.9 56.3 68.1-
- 21. Unit Capacity Factor (Using MDC Net) 97.3~
47.7 61.0
- 22. Unit Capacity Factor (Using ()ER Net!
95.7 46.9 60.0
- 23. Unit Forced Outage Rate 1.1 21.6 12.6
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each p NA
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
NA
- 26. Units In Test Status (Prior to Commercial Operationp Forecast Achieved INITIA L CRITICA LITY INITIAL ELECTRICITY COMMERCIAL OPERATION i
(9/77)
x.<
>. CORRECTION 4 l
OPERATING DATA REPOR T '
DOCKET NO 50-313 DATE Y3W COMPLETED BY C. N. Shively TELEPHONE. 501/968-2519 OPERATING STATUS
- 1. Unit Name:
Arkansas Nuclear One Notes
- 2. Reporting Period: July 1 - July 31. 1978
- 3. Licensed Thennal Power (MWI):
2568 902.74
- 4. Nameplate Rating (Gross MWe):
850-
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
883 836
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
None
- 9. Power Lesel To Which Restricted. lf Any (Net MWe):
None-
- 10. Reasons For Restrictions.lf Any:
NA This Month Yr..t o-Date Cumulative i1. Hours in Reporting Periad 744.0 5087.0 31698.0
- 12. Number Of Hours Reactor Was Critical 744.0 3163.4 22092.4
- 13. Reactor Reserve Shutdown Hours 0.0 647.6 1966.3 14, Hours Generator On Line 744.0 3077.2 21612.6
- 15. Unit Reserve Shutdown Hours 0.0 113.7 205.2
- 16. Gross Thermal Energy Generated (MWH) 1904845.
7304289.
51746815.
17 Gross Electrical Energy Generved (MWH) 033403*
245005C 17195966, i6. Net Electrical Energy Generated (MWH) 6060 W._.
2339185.
16399935.
- 19. Unit Service factor 100.0 60.5 68.2 5
- 20. Unit Asailability Factor 100.0 62.7-68.B ~
l
- 21. Unit Capacity Factor IUsing MDC Net) 97.4' 55.0 61.9
- 22. Unit Capacity Factor (Using DER Net) 95.8 54.1 60.9
- 23. Unit Forced Outage Rate 0.0 17.3 12.2
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Eacht:
NA
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: -- N A
- 26. Unitt in Test Sietus (Prior Io Commercial Operation):
Forecast Achieved
(
INITIAL CRITICA LITY f'
INITI A L ELECTRICITY COMMERCI AL OPER ATION (4/77)
+
s e.s
-m-m.
,2
7
> CORRECTION ' <
s OPERATING DATA REPORT DOCKET NO.
50-313~
pc-9/17tTI8 tb b'
g OPERATING ST ATUS Arkarisas Nuclear One Notes J. Unit Name:
- 2. Reporting Period:- August 1, 1978-August 31, 1978.
2NO 3.1.ieensed Thermal Power (Mh t):
902.74
- 4. Nameplate Rating (Grou MWe):
850
- 5. Design Electrical Rating (Net MWe):
883
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
- h. If(.hanges Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report.Ghe Reasons:
NONE
- 9. Power LesciTo Which Restricted,1f Any(Net MWe):
NONE
- 10. Reasons For Restrictions,if Any:
NA This Month Yr. to Date Cumulative 744.0 5831.0 32442.0 i1. ifours in Reporting Period
- 12. Number Of flours Reactor Was Critical 728.0 3891.4 22820.4
- 13. Reactor Reserve Shutdown flours 0.0 W.6 1966.3
- 14. Ilours Generator On Line 723.1 3800.3 22335.7
- 15. Unit Reserve Shutdown flours 0.0 113.7 205.2
- 16. Gross Thermal Energy Generated (MWil) 1830420.
9134709.
53577235.
17 Gross Electrical Energy Generated (MWil) 605743 3055810.
17801721.
- 18. Net Electrical Energy Generated (MWH) 579031.
2918228.
16978978.
- 19. Unit Service f actor 97.2 65.2 68.8
- 20. Unit Availability Factor 97.2 67.I 69.5 21'. Unit Capacity factor (Using MDC Net) 93.1 59.9 62.6
- 22. Unit Capacity Factor (Using DER Net) 91.6 58.9 61.6 23, Unit Forced Outage Rate 2.8 14.9 12.0
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each):
NA
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup: EA 26, Units In Test Staius (Prior to Commercial Operation)!
Forecast Achieved INITIA L CRITICA LITY INITIAL ELECTRICITY COMNil:RCI A L OPER ATION (9/77)