0 WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968
- 3000 George \\Vashington \\\\'ay
- Richland, \\Yashington 99352 Docket No. 50-460 June 27, 1988 G01-88-0050
!'ocument Control Desk U. S. Nuclear Regulatory Coninission P-1 137 Washington, D. C. 20555
Subject:
NUCLEAR PROJECT N0. 1 RESPONSE TO NRC BULLETINS AND GENLaIC LETTERS
References:
- 1) Letter, DW Mazur (Supply System) to RH Engelken (NRC, Region Y), "Construction Delay Managemeret Plan for WNP-1" (G01-82-0421), dated July 8, 1982
- 2) Letter, RW Root, Jr. (Supply System) to RH Engelken (NRC, Region V), "Construction Delay Management Plan for WNP-1" (G01-82-0826), dated December 29, 1982
- 3) Letter, Elinor G.
Adensam (NRC) to RL Ferguson (Supply System), "Extension of Construction Completion Date for WPPSS Nuclear Project No.1" (GIl-83-0113), dated June 16, 1983 In reference 1 the Supply System provided the NRC with the management plan for the construction delay of WNP-1.
Reference 2 submitted Revision 1 to the plan.
By Reference 3, the NRC issued an order extending the WNP-1 construction completion date to June 1,1991.
The Supply System continues to receive NRC Bulletins and Generic Letters that in many cases require an investigation of hardware and/or software and l
a response to the NRC.
Since the Project has been placed in this extended construction delay and resources have been limited to only those necessary L
for preserving the assets, the Supply System, in most cases, has been sending letters to the NRC ir.dicating that our response must be deferred
- t. e resumption of construction activities.
We believe that until h
continuing to respond in this fashion is unnecessarily repetitious.
ilh0f
, o 8807080148 G80627 PDR ADOCK 05000460 A.
_j
g.
~F Document Control Desk WNP-1 Response to NRC' Bulletins & Generic Letters Page 2-
' Her.ceforth, by this letter, ~ the Supply System is deferring responses to NRC Bulletins and Generic Letters unless the NRC specifically requests that we respond for WNP-1, or the Supply System, in reviewing an NRC Bulletin 'or Generic Letter determines that it -is applicable to the ongoing preservation activities at WNP-1.
The Supply System will reply to the outstanding NRC i
Bulletins and Generic Letters that require a response following resumption E-of construction activities.
If you have any questions, please contact Mr. D. W. Coleman, WNP-1 Project Licensing Manager, at (509) 372-5304.
Very truly yours,
/ D
.c.~<.~
G. C.
orensen, Manager Regulatory Programs cc: