ML20149M973

From kanterella
Jump to navigation Jump to search
Final Deficiency Rept CP-87-45 Re Reactor Coolant Pump Motor Backup Circuitry.Initially Reported on 880111. Corrective Actions Will Be Completed Prior to Unit 1 Plant Heatup Scheduled for Dec 1988 & Unit 2 Fuel Loading
ML20149M973
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 02/25/1988
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CP-87-45, TXX-88260, NUDOCS 8802290333
Download: ML20149M973 (1)


Text

F tM lllllllll =

rm Log # Txx-88260

.-- File # 10110 r C 908.3

~ # ' "" *'5 ('E TUELECTRIC w auu. c. cooma February 25, 1988 i w w,, n, naa.,

U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET N05, 50-445 AND 50-446 REACTOR COOLANT PUMP (RCP) MOTOR BACKUP CIRCUITRY SDAR: CP-87-45 (FINAL REPORT)

Gentlemen:

On January 11, 1988, we notified you by our letter, logged TXX-88061, of a deficiency involving RCP motor backup circuitry which we deemed reportable under the provisions of 10CFR50.55(e). This report is submitted to provide the corrective action completion schedule.

Our previously specified corrective action includes the addition of a second set of electrically independent current transformers with relays and interconnecting wiring with the 125 V DC power to the primary and backup protection circuits being supplied from independent sources.

Unit I corrective actions will be completed prior to plant heatup (currently scheduled for December 1988). Unit 2 corrective actions will be completed prior to Unit 2 fuel loading.

Very truly yours,

/1 W. G. Counsil VIP /grr c-llr. R. D. fiartin, Region IV Resident inspectors CPSE5 (H r=n=u S DCD