ML20149M708

From kanterella
Jump to navigation Jump to search
Forwards Rev 23 to Emergency Response Plan & Rev 2 to ERPIP-005, Emergency Response Plan Implementation Procedure
ML20149M708
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 01/16/1997
From: Forgette T
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20149M709 List:
References
NUDOCS 9701240307
Download: ML20149M708 (1)


Text

_

CALVERT CI.frrs NUCLEAR POWER PLwr Baltimore Gas and Elec6ric Company Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 January 16,1997 s

U. S. Nuclear Regulatory Commission Wash'ngton, DC 20555 ATTENTION:

Document Control Desk 2

SUBJECT:

Calvert Cliffs Nuclear Power Plant

=

Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 Independent Spent Fuel Storage Installation Docket No. 72-8 Changes to the Emergency Response Plan Implementation Procedures and Emergency Resnonse Plan As required by 10 CFR Part 50, Appendix E, V., " Implementing Procedures," and 10 CFR 50.4(b)(5),

changes to the Emergency Response Plan Implementing Procedures (ERPIPs) and Emergency Response

=

Plan (ERP) are provided in the enclosures to Attachments (1) and (2).

Please sign, date and return the Transmittal / Receipt Acknowledgment form provided in the Attachments to the address listed on the form.

1 Should you have questions regarding this matter, please contact me (410-495-4996) or Mr. Tim Grover (410-495-2064).

ery truly yours, 2

=

T. E. orlgette

/

9701240307 961211 PDR ADOCK C a) 7/

Director-Emergency Planning

/ /

j TEF/TWG/ dim 940071

[t Y

Attachments: (1)

ERPIP Transmit:al #96-1230 (2)

ERP Transmittal #96-1230 cc:

(Without Attachments /Enclos 'res)

D. A. Brune, Esquire T. T. Martin, NRC J. E. Silberg, Esquire Resident Inspector, NRC Director, Project Directorate I-1, NRC R.1. McLean, DNR A. W. Dromerick, NRC J. H. Walter, PSC