Text
r_
e VERMONT YANKEE NUCLEAR POWER CORPORATION FVY 88-12 RD 5. Box 169 Ferry Road. Orattleboro, VT 05301
,,,o ENGINEERING OFFICE 1671 WORCESTER ROAD N
FRAMINGH AM. M ASS ACHUSETTS 01701 Tc6cmosi ewnie g e,.- 2 7 '
February 19, 1988 U.S. Nuclear Regulatory Commission Washington, D.C.
Attn:
Document Control Desk Reference a)
Generic Letter 88-02, dated 1/20/88
Dear Sir:
In accordance with the referenced Generic Letter, our response to your survey is attached.
If you have further questions, please do not hesitate to contact us.
Very truly yours, VERMONT YANKEE NUCLEAR POWER CORPORATION h
Warren P. Murphy r-Vice President an h Manager of Operations cc F.J. Miraglia USNRC, Region I USNRC Resident Inspector, VYNPC
/dm
'I 8802260235 88G219 DR ADOCK O5000271 PDR
O INTEGRATED SAFETY ASSESSMENT PROGRAM (ISAP) II Response Format to Generic Letter 88-02 i
Facility Name:
Vermont Yankee Nuclear Power Station Utility:
Vermont Yankee Nuclear Power Corporation Individual Contact Name W.P. Murphy Phone Number:
(802) 257-5271 An expression of interest will not be considered a commitment to participate on the part of the utility.
I.
WOULD YOU BE INTERESTED IN PARTICIPATING IN ISAP II? IF SO, IN WHAT TIME FRAME?
Vermont Yankee is not interested in participating in ISAP II at this time; however, we are willing to review the results of utility participation in ISAP II and re-evaluate our position in the future.
2.
DO YOU BELIEVE THAT AN INDUSTRY /NRC SEMINAR CONSISTING OF A BRIEF DISCUSSION BY NRC FOLLOWED BY A QUESTION AND ANSWER PERIOD WOULD BE BENEFI-CIAL PRIOR TO MAKING A DECISION?
Yes.
3.
WOULD YOU BE INTERESTED IN 4 ONE-ON-ONE MEETING WITH NRC TO DISCUSS YOUR PARTICULAR FACILITY OP. FACILITIES?
Vermont Yankee is not interested in such a meeting at this time; however, we would request such a meeting prior to any future decision to participate.
4.
IF YOU REMAIN UNDECIDED REGARDING PARTICIPATION, WHAT ADDITIONAL INFOR-MATION DO YOU NEED IN ORDER TO MAKE A DECISION 7 l
A clearer understanding of program scope and schedular flexibilities asso-l ciated with the process, including consideration of safety assessment issue l
identification and resolution sequence, based on options to a detailed PRA j
approach.
i 5.
DO YOU HAVE ANY POTENTIAL CONCERNS ABOUT PARTICIPATING IN ISAP II?
Potential concerns include the requirement for, and process associated with, licensing the integrated schedule, as well as the associated regula-tory implications and resources required to implement and maintain the program. The schedule delineated in Table I also appears to be very opti-eistic.
1 J
6.
DO YOU HAVE ANY SUGGESTIONS FOR PROGRAM IMPROVEMENTS OR CHANGES?
j 4
i j
One suggestion for program improvement would be to develop a more descrip-tive model of the program which would clearly identify alternatives and j
options associated with the scope and process.
.