ML20149M652

From kanterella
Jump to navigation Jump to search
Ack Receipt of Which Notified of Commercial Operation of Plant ABWR & Info on Unit
ML20149M652
Person / Time
Issue date: 01/16/1997
From: Shirley Ann Jackson, The Chairman
NRC COMMISSION (OCM)
To: Shibasaki S
TOKYO ELECTRIC POWER CO., INC.
Shared Package
ML20149M654 List:
References
NUDOCS 9701240181
Download: ML20149M652 (1)


Text

3Ps o nig I

UNITED STATES 8

o NUCLEAR REGULATORY COMMISSION

[)

(

g j

WASHINGTON, D.C. 20565 4001 January 16, 1997 CHAlnMAN Mr. Shuya Shibasaki Director, General Manager The Tokyo Electric Power Company Washington Office i

1901 L Street, N.W., Suite 720 Washington, D.C.

20036

Dear Mr. Shibasaki:

Thank you for your letter of November 21, 1996 notifying me of the commercial operation of the Tokyo Electric Power Company's Kashiwazaki Kariwa Unit Number 6 Advanced Boiling Water Reactor (ABWR) and for the enclosed information on the unit.

I appreciate your gracious invitation to attend the official dedication, but because of a demasding schedule in Washington, I must decline.

I did make a technical tour of ts % iwazaki Kariwa Units Number 6 and 7 when I visited Japan in April last year, and was very impressed with what I saw. The project has been a true international collaboration.

In its design, construction, and inspection process, the Kashiwazaki Kariwa ABWRs set new standards for the light water reactor and I wish TEPC0 many years of safe operation.

Sincerely, Shirley Ann Jackson

} l/

I ffw 9701240181 970116 PDR COMMS NRCC CORRESPONDENCE PDR

's

)

p iyit p, ().v h d up 4