|
---|
Category:MEETING MINUTES & NOTES--CORRESPONDENCE
MONTHYEARML20210E0201999-07-16016 July 1999 Summary of 990629 Meeting with Util in Rockville,Md Re Ongoing Efforts in Planning Sf Storage Strategy,Including Licensing of Isfsi,At Plant.With Attendance List & TVA Handout ML20210D7601999-07-16016 July 1999 Summary of 990616 Meeting with TVA in Rockville MD to Brief Staff on Planned SG Replacement.List of Attendees & Handout Provided by TVA Encl ML20210D7801999-07-16016 July 1999 Summary of 990715 Meeting with TVA Re TVA Evaluation of Fee Structure Compared with Recent Actual Fees & NRC Guidance in Estimating Review Effort for Licensing Actions.List of Attendees & Matl Used in Presentation Enclosed ML20237E9811998-08-25025 August 1998 Summary of 980708 Meeting W/Tva & Framatome Cogema Fuel in Rockville,Md Re Ongoing Efforts W/Doe to Fabricate & Install Four Lead Test Assemblies in Plant,Unit 2 Core During Cycle 10 Refueling Outage in Spring of 1999.Attendance List Encl ML16343A5411997-11-12012 November 1997 Summary of 971002 Meeting W/Tva in Rockville,Md Re Planned Use of Electrosleeving Process at Sequoyah Nuclear Plant, Units 1 & 2 & Diablo Canyon Power Plant to Repair & Strengthen SG Tubing.List of Attendees & Handouts Encl ML20216H5261997-08-26026 August 1997 Summary of 970822 Meeting W/Util in Rockville,Md Re Followup to Series of Conference Calls on 970418,discussing Results of Recent Steam Generator Insps at Sequoyah Unit 1.List of Attendees,Handouts & Staff Questions Encl ML20140B4701997-06-0404 June 1997 Summary of 970530 Meeting W/Tva in Rockville,Md to Discuss Status of Thermo-Lag Fire Barrier Corrective Action Program at Plant & Schedule for Completion of Program.W/Attendance List & TVA Handout ML20140G5621997-05-0808 May 1997 Summary of 970227 Meeting W/Tva in Rockville,Md to Discuss Sequoyah Conversion to Framatome Cogema Fuel.List of Attendees Encl ML20134J7451996-11-0808 November 1996 Summary of 961104 Meeting W/Tva in Rockville,Md Re Status of Thermo-Lag Fire Barrier Upgrades at Plant.List of Attendees & Copies of Handouts Encl ML20129H5211996-10-29029 October 1996 Summary of Operating Reactors Events Meeting 96-13 on 961023,informing Senior Managers from Ofcs of Commission,Oe, NRR & Regional Ofcs of Selected Events That Occurred Since Last Briefing ML20217D1931994-03-0707 March 1994 Summary of Sequoyah Restart Panel 940303 Meeting in Region II Ofc Re Status of NRC & Licensee Activities for Restart of Unit 1.Meeting Minutes & Unit 1 Restart Action Plan Encl ML20059K3131993-11-0505 November 1993 Summary of Operating Reactors Events Meeting 93-42 on 931103 ML20056H5721993-08-0505 August 1993 Summary of Operating Reactors Events Meeting 93-28 on 930728 ML20217D2111993-06-16016 June 1993 Summary of Sequoyah Restart Panel 930614 Meeting in Region II Ofc Re Plant Restart & Listed Items.List of Attendees & Checklists Encl.Next Meeting Will Be Held on 930622 ML20035F4831993-04-15015 April 1993 Summary of 930412 Meeting W/Util in Rockville,Md Re Assessment & Corrective Actions Re Restart of Plant ML20035B4531993-03-18018 March 1993 Summary of Operator Reactors Events Briefing 93-10 on 930317.List of Attendees Encl ML20035E3771993-03-17017 March 1993 Summary of Operating Reactors Events Meeting 93-09 on 930310 ML20035A7241993-03-0909 March 1993 Summary of Operating Reactors Events Briefing 93-08 on 930303 ML20127D1321993-01-12012 January 1993 Summary of Operating Reactors Events Meeting 93-01 on 930106 ML20058J8621990-11-27027 November 1990 Summary of 901005 Meeting W/Util in Rockville,Md Re Cable Conduit Testing Program.Viewgraphs & Attendee List Encl ML20058K0311990-11-23023 November 1990 Summary of Operating Reactors Events Meeting 90-28 on 901114 Re Reactor Scrams for Wk Ending 901111.Attendees Listed ML20062C8111990-10-16016 October 1990 Summary of Operating Reactors Events Meeting 90-25 on 901010.List of Attendees,Reactor Scram Statistics & Tabulation of Events Encl ML20059N2091990-09-21021 September 1990 Summary of 900919 Operating Reactors Events Meeting 90-023 to Discuss Significant Elements ML20059D8121990-09-0505 September 1990 Summary of 900817 Meeting W/Util in Rockville,Md Re Schedules of Certain Mods Committed for Completion in Unit 2 Cycle 4 Refueling Outage.Engineeering for Unit 2 Will Be Completed Before Restart from Outage ML20056B4101990-08-20020 August 1990 Summary of 900723 Meeting W/Util in Rockville,Md Re Plant Cable/Conduit Testing Program for safety-related Cable.List of Attendees,Tva & NRR Handouts & Transcript of Meeting Encl ML20055E2081990-07-0505 July 1990 Summary of 900531 Meeting W/Tva in Rockville,Md Re Plant safety-related Cable Inside Containment.List of Attendees, & Handouts Presented at Meeting Encl ML20012E2951990-03-22022 March 1990 Summary of 900226 Meeting W/Util in Rockville,Md Re Eagle 21 Process Protection Sys,Including Eagle 21 Test Cart to Be Installed During Upcoming Cycle 4 Refueling Outage.Agenda & Meeting Handouts Encl ML20246J8031989-07-12012 July 1989 Summary of 890609 Meeting W/Util in Rockville,Md Re Dissolution of Engineering Assurance Organization.List of Meeting Attendees,Util Handout,Agenda & Transcript Encl ML20245F9761989-06-22022 June 1989 Summary of 890614 Meeting W/Util & Westinghouse in Rockville,Md Re Future Work for Facility Cycle 4 Refueling Outage ML20247M1001989-05-26026 May 1989 Summary of 890511 Meeting W/Util in Rockville,Md Re Performance of Best Estimate Calculations for App K Analyses.Proposed Plan for LOCA Analyses,Meeting Handouts & List of Attendees Encl ML20247K0901989-05-23023 May 1989 Summary of 890517 Meeting W/Inpo Re Similarities & Differences Between Performance Indicator Programs.Detailed Discussion Encl ML20247K1011989-05-16016 May 1989 Summary of 890517 Meeting W/Inpo in Bethesda,Md Re Similarities & Differences Between INPO & NRC Performance Indicators ML20155A8081988-09-29029 September 1988 Summary of 880915 Meeting W/Util in Rockville,Md Re Microbiological Influenced Corrosion Program at Plant.List of Attendees & Viewgraphs Encl IR 05000327/19880351988-09-21021 September 1988 Summary of 880913 Meeting W/Util at Site Re Unit 2 Shutdown Margin & Unit 1 Restart Readiness,Per Insp Repts 50-327/88-35 & 50-328/88-35.List of Attendees & Related Info Encl ML20154H4341988-09-16016 September 1988 Summary of 880908 Meeting W/Util in Rockville,Md Re Changes to Conditions Adverse to Quality Program.List of Attendees Encl ML20206B1961988-07-29029 July 1988 Summary of ACRS Subcommittee for TVA Organizational Issues 880722 Meeting in Washington,Dc Re Generic Lessons Learned from NRC Review of Util Concerning Restart of Facility ML20153A8371988-07-0101 July 1988 Summary of 880622 Meeting W/Util in Rockville,Md Re TVA Commitments on Facility.List of Attendees & Util Handout Encl ML20150E2321988-06-21021 June 1988 Summary of 880613 Meeting W/Util to Discuss Restart of Facility in Light of Recent Scrams from Power.Transcript of Meeting Encl ML20196A9201988-06-17017 June 1988 Summary of Operating Reactors Events Meeting 88-24 on 880614.Two Significant Events Identified for Input to NRC Performance Indicator Program.No Events Suggested for long-term Followup.List of Attendees Encl ML20154A4061988-05-0404 May 1988 Summary of 880414 Meeting W/Util in Rockville,Md Re Differences Between Units 1 & 2 Nuclear Performance Plan. List of Attendees & Licensee Handout Encl ML20151D2701988-03-12012 March 1988 Summary of ACRS Subcommittee on TVA Organizational Issues Meeting on 880202-03 in Chattanooga,Tn Re Review of TVA Mgt Reorganization & Issues Re Restart of Unit 2 ML20149M6071988-02-22022 February 1988 Summary of 880211 Meeting W/Util Re Load Sequencing of Plant Diesel Generators.Attendance List & Handout Matl Used During Meeting Encl ML20148Q0801988-01-21021 January 1988 Summary of Operating Reactors Events Meeting 88-03 on 880119.List of Events & Summaries of Presented Events & 1988 Scrams Encl ML20195J5251988-01-21021 January 1988 Summary of 880120 Meeting Between Commissioner Bernthal & Admiral White of TVA Re Util Request to Retain Ofc of Special Projects as Overseer of Plants After Sequoyah 1 Restart & Invitation to Bernthal to Tour Sequoyah Plant ML20195J6011987-12-0303 December 1987 Summary of ACRS Subcommittee TVA Organizational Issues 871004 Meeting W/Nrc & Util in Washington,Dc Re Actions Being Taken on Plant Restart Issues ML20236X4741987-12-0202 December 1987 Summary of 871124 Meeting W/Util in Bethesda,Md Re Results of Testing of Silicone Rubber Insulated Cables for Unit 2. Transcript of Meeting Encl ML20236K8951987-11-30030 November 1987 Trip Rept of 871028-30 Site Visit to Gather Info from Files to Facilitate Updating Sims Database ML18032A6091987-10-0606 October 1987 Summary of 870915 Meeting W/Tva Re Differences (Deltas) Between Sequoyah & Browns Ferry Nuclear Performance Plans. Attendance List & Browns Ferry Program Description Encl ML20235B2261987-09-15015 September 1987 Summary of 870910 Meeting W/Util in Knoxville,Tn Re Status of Cable Test Program.List of Attendees & Transcript Encl ML20235B1271987-09-15015 September 1987 Summary of 870911 Meeting W/Tva Re NRC Staff Presentation to TVA Findings from Integrated Design Insp.List of Attendees & Meeting Transcription Encl 1999-07-16
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20210D7601999-07-16016 July 1999 Summary of 990616 Meeting with TVA in Rockville MD to Brief Staff on Planned SG Replacement.List of Attendees & Handout Provided by TVA Encl ML20210E0201999-07-16016 July 1999 Summary of 990629 Meeting with Util in Rockville,Md Re Ongoing Efforts in Planning Sf Storage Strategy,Including Licensing of Isfsi,At Plant.With Attendance List & TVA Handout ML20210D7801999-07-16016 July 1999 Summary of 990715 Meeting with TVA Re TVA Evaluation of Fee Structure Compared with Recent Actual Fees & NRC Guidance in Estimating Review Effort for Licensing Actions.List of Attendees & Matl Used in Presentation Enclosed ML20237E9811998-08-25025 August 1998 Summary of 980708 Meeting W/Tva & Framatome Cogema Fuel in Rockville,Md Re Ongoing Efforts W/Doe to Fabricate & Install Four Lead Test Assemblies in Plant,Unit 2 Core During Cycle 10 Refueling Outage in Spring of 1999.Attendance List Encl ML16343A5411997-11-12012 November 1997 Summary of 971002 Meeting W/Tva in Rockville,Md Re Planned Use of Electrosleeving Process at Sequoyah Nuclear Plant, Units 1 & 2 & Diablo Canyon Power Plant to Repair & Strengthen SG Tubing.List of Attendees & Handouts Encl ML20216H5261997-08-26026 August 1997 Summary of 970822 Meeting W/Util in Rockville,Md Re Followup to Series of Conference Calls on 970418,discussing Results of Recent Steam Generator Insps at Sequoyah Unit 1.List of Attendees,Handouts & Staff Questions Encl ML20140B4701997-06-0404 June 1997 Summary of 970530 Meeting W/Tva in Rockville,Md to Discuss Status of Thermo-Lag Fire Barrier Corrective Action Program at Plant & Schedule for Completion of Program.W/Attendance List & TVA Handout ML20140G5621997-05-0808 May 1997 Summary of 970227 Meeting W/Tva in Rockville,Md to Discuss Sequoyah Conversion to Framatome Cogema Fuel.List of Attendees Encl ML20134J7451996-11-0808 November 1996 Summary of 961104 Meeting W/Tva in Rockville,Md Re Status of Thermo-Lag Fire Barrier Upgrades at Plant.List of Attendees & Copies of Handouts Encl ML20129H5211996-10-29029 October 1996 Summary of Operating Reactors Events Meeting 96-13 on 961023,informing Senior Managers from Ofcs of Commission,Oe, NRR & Regional Ofcs of Selected Events That Occurred Since Last Briefing ML20217D1931994-03-0707 March 1994 Summary of Sequoyah Restart Panel 940303 Meeting in Region II Ofc Re Status of NRC & Licensee Activities for Restart of Unit 1.Meeting Minutes & Unit 1 Restart Action Plan Encl ML20059K3131993-11-0505 November 1993 Summary of Operating Reactors Events Meeting 93-42 on 931103 ML20056H5721993-08-0505 August 1993 Summary of Operating Reactors Events Meeting 93-28 on 930728 ML20217D2111993-06-16016 June 1993 Summary of Sequoyah Restart Panel 930614 Meeting in Region II Ofc Re Plant Restart & Listed Items.List of Attendees & Checklists Encl.Next Meeting Will Be Held on 930622 ML20035F4831993-04-15015 April 1993 Summary of 930412 Meeting W/Util in Rockville,Md Re Assessment & Corrective Actions Re Restart of Plant ML20035B4531993-03-18018 March 1993 Summary of Operator Reactors Events Briefing 93-10 on 930317.List of Attendees Encl ML20035E3771993-03-17017 March 1993 Summary of Operating Reactors Events Meeting 93-09 on 930310 ML20035A7241993-03-0909 March 1993 Summary of Operating Reactors Events Briefing 93-08 on 930303 ML20127D1321993-01-12012 January 1993 Summary of Operating Reactors Events Meeting 93-01 on 930106 ML20058J8621990-11-27027 November 1990 Summary of 901005 Meeting W/Util in Rockville,Md Re Cable Conduit Testing Program.Viewgraphs & Attendee List Encl ML20058K0311990-11-23023 November 1990 Summary of Operating Reactors Events Meeting 90-28 on 901114 Re Reactor Scrams for Wk Ending 901111.Attendees Listed ML20062C8111990-10-16016 October 1990 Summary of Operating Reactors Events Meeting 90-25 on 901010.List of Attendees,Reactor Scram Statistics & Tabulation of Events Encl ML20059N2091990-09-21021 September 1990 Summary of 900919 Operating Reactors Events Meeting 90-023 to Discuss Significant Elements ML20059D8121990-09-0505 September 1990 Summary of 900817 Meeting W/Util in Rockville,Md Re Schedules of Certain Mods Committed for Completion in Unit 2 Cycle 4 Refueling Outage.Engineeering for Unit 2 Will Be Completed Before Restart from Outage ML20056B4101990-08-20020 August 1990 Summary of 900723 Meeting W/Util in Rockville,Md Re Plant Cable/Conduit Testing Program for safety-related Cable.List of Attendees,Tva & NRR Handouts & Transcript of Meeting Encl ML20055E2081990-07-0505 July 1990 Summary of 900531 Meeting W/Tva in Rockville,Md Re Plant safety-related Cable Inside Containment.List of Attendees, & Handouts Presented at Meeting Encl ML20012E2951990-03-22022 March 1990 Summary of 900226 Meeting W/Util in Rockville,Md Re Eagle 21 Process Protection Sys,Including Eagle 21 Test Cart to Be Installed During Upcoming Cycle 4 Refueling Outage.Agenda & Meeting Handouts Encl ML20246J8031989-07-12012 July 1989 Summary of 890609 Meeting W/Util in Rockville,Md Re Dissolution of Engineering Assurance Organization.List of Meeting Attendees,Util Handout,Agenda & Transcript Encl ML20245F9761989-06-22022 June 1989 Summary of 890614 Meeting W/Util & Westinghouse in Rockville,Md Re Future Work for Facility Cycle 4 Refueling Outage ML20247M1001989-05-26026 May 1989 Summary of 890511 Meeting W/Util in Rockville,Md Re Performance of Best Estimate Calculations for App K Analyses.Proposed Plan for LOCA Analyses,Meeting Handouts & List of Attendees Encl ML20247K0901989-05-23023 May 1989 Summary of 890517 Meeting W/Inpo Re Similarities & Differences Between Performance Indicator Programs.Detailed Discussion Encl ML20247K1011989-05-16016 May 1989 Summary of 890517 Meeting W/Inpo in Bethesda,Md Re Similarities & Differences Between INPO & NRC Performance Indicators ML20155A8081988-09-29029 September 1988 Summary of 880915 Meeting W/Util in Rockville,Md Re Microbiological Influenced Corrosion Program at Plant.List of Attendees & Viewgraphs Encl IR 05000327/19880351988-09-21021 September 1988 Summary of 880913 Meeting W/Util at Site Re Unit 2 Shutdown Margin & Unit 1 Restart Readiness,Per Insp Repts 50-327/88-35 & 50-328/88-35.List of Attendees & Related Info Encl ML20154H4341988-09-16016 September 1988 Summary of 880908 Meeting W/Util in Rockville,Md Re Changes to Conditions Adverse to Quality Program.List of Attendees Encl ML20206B1961988-07-29029 July 1988 Summary of ACRS Subcommittee for TVA Organizational Issues 880722 Meeting in Washington,Dc Re Generic Lessons Learned from NRC Review of Util Concerning Restart of Facility ML20153A8371988-07-0101 July 1988 Summary of 880622 Meeting W/Util in Rockville,Md Re TVA Commitments on Facility.List of Attendees & Util Handout Encl ML20150E2321988-06-21021 June 1988 Summary of 880613 Meeting W/Util to Discuss Restart of Facility in Light of Recent Scrams from Power.Transcript of Meeting Encl ML20196A9201988-06-17017 June 1988 Summary of Operating Reactors Events Meeting 88-24 on 880614.Two Significant Events Identified for Input to NRC Performance Indicator Program.No Events Suggested for long-term Followup.List of Attendees Encl ML20154A4061988-05-0404 May 1988 Summary of 880414 Meeting W/Util in Rockville,Md Re Differences Between Units 1 & 2 Nuclear Performance Plan. List of Attendees & Licensee Handout Encl ML20151D2701988-03-12012 March 1988 Summary of ACRS Subcommittee on TVA Organizational Issues Meeting on 880202-03 in Chattanooga,Tn Re Review of TVA Mgt Reorganization & Issues Re Restart of Unit 2 ML20149M6071988-02-22022 February 1988 Summary of 880211 Meeting W/Util Re Load Sequencing of Plant Diesel Generators.Attendance List & Handout Matl Used During Meeting Encl ML20148Q0801988-01-21021 January 1988 Summary of Operating Reactors Events Meeting 88-03 on 880119.List of Events & Summaries of Presented Events & 1988 Scrams Encl ML20195J5251988-01-21021 January 1988 Summary of 880120 Meeting Between Commissioner Bernthal & Admiral White of TVA Re Util Request to Retain Ofc of Special Projects as Overseer of Plants After Sequoyah 1 Restart & Invitation to Bernthal to Tour Sequoyah Plant ML20195J6011987-12-0303 December 1987 Summary of ACRS Subcommittee TVA Organizational Issues 871004 Meeting W/Nrc & Util in Washington,Dc Re Actions Being Taken on Plant Restart Issues ML20236X4741987-12-0202 December 1987 Summary of 871124 Meeting W/Util in Bethesda,Md Re Results of Testing of Silicone Rubber Insulated Cables for Unit 2. Transcript of Meeting Encl ML18032A6091987-10-0606 October 1987 Summary of 870915 Meeting W/Tva Re Differences (Deltas) Between Sequoyah & Browns Ferry Nuclear Performance Plans. Attendance List & Browns Ferry Program Description Encl ML20235B2261987-09-15015 September 1987 Summary of 870910 Meeting W/Util in Knoxville,Tn Re Status of Cable Test Program.List of Attendees & Transcript Encl ML20235B1271987-09-15015 September 1987 Summary of 870911 Meeting W/Tva Re NRC Staff Presentation to TVA Findings from Integrated Design Insp.List of Attendees & Meeting Transcription Encl ML20239A6691987-09-0404 September 1987 Summary of 870901 Meeting W/Util,Bechtel & S&W in Bethesda, MD Re Criteria for Pipe Supports.List of Attendees,Handouts & SQN-DC-V-24.2 Supports for Rigorously Analyzed Category I Piping Encl 1999-07-16
[Table view] |
Text
.
f h
UNITED STATES n
NUCLEAR REGULATORY COMMISSION y
1; W ASMiko YON, D. C. 20666
%,.... * /
February 22, 1988 l
Occket Nos. 50-327/328 LICENSEE: TENNESTEE VALLEY AUTHORITY (TVA)
FACILITY: SEQUOYAH NUCLEAR PLANT, UNIT 2
SUBJECT:
SUMMARY
OF MEETING - FEBRUARY 11, 1988 RECARDING DIESEL GENERATOR LOAD SEQUENCING On February 11, 1988 members of the NRC staff met with representatives of TVA to discuss load sequencing of the Sequoyah diesel generators. A itst of attendees is provideo in Enclosure it the handout material used during f.he meeting is provided in Enclosure 2.
t This meeting was a follewup to discussions held at the Sequoyah site regarding conforr.ance with Regulatory Guide 1.9 guidance for voltage and frequency limits i
during load sequencing.
TVA has performed tests on til four of the diesel generators to monitor voltage 4
and fr w ency response as loads are sequenced.
Some of the loads, such as safety injection pumps, cannot be run in a full-flow condition during such testing. Thus, the test running load is somewhat les* than the actual
)
worst-case accident leadirg. TVA perforeed calculations for both the test condition and the actual loading conditions to develop a "compensation factor" to account for the additional loading. The difference from the calculations was then added to tne voltage drop from the test case to represent the actual voltage drop.
The staff raised concerns because the analysis results did not bound the test results; that is, the caleviated voltage drop was not as large as the measured value. TVA has argued that the running load at the time of pump start does not have a significant effect en the voltage dip at that point. However, since in some cases, there is not a large margin between the calculated voltages and the
~
equipment requirements the staff needs further assurance that the true response of the diesels to a full load has been censidered.
One alternative discussed at the meeting was to examine the ratio of currents for the test and actual loads ard to adjust the test value of voltage drop 2
accordingly. An adequate demonstration of equipment functionality with a safety 1
i l
2-i factor applied to provide margin, would then resolve this concern. TVA agreed to evaluate this approach and will meet with the staff shortly to continue discussions on this issue.
Original Signed by-Eileen McKenna, Project Manager L
TVA Projects Division Office of Special Projects
Enclosures:
As stated c
w/ enclosures:
See next page DISTRIBUTION Docket File NRC PDR Local PDR See Those on Attached List (TSP:DTVA/LA 0' PMIY 'PM 05 -
A/BC
,P CJTy rson EMcKenna os
, y88 2/p/88 2////88 2/J2/88
Tennessee Valley Authority Sequoyah Nuclear Plant Cc:
General Counsel U.S. Nuclear Regulatory Comission Regional Administrator, Region !!
Tennessee Ya" Sy Authority 400 West Surs ; Hill Drive 101 Marietta Street, N.W.
Eli R33 Atlanta, Georgia 30323 Knoxville, Tennessee 37902 Resident Inspector /Sequoyah NP Mr. R. L. Gridley c/o U.S. Nuclear Regulatory Comission r
Tennessee Valley Authority 2600 Igou Ferry Road SN 1576 Lookout Place Soddy Daisy, Tennessee 373)9 Chattanooga, Tennessee 37402-2801 Pr. Richard King Mr. H. L. Abercrombie e/o U.S. GAO Tennessee Valley Authority 1111 North Shore Drive Sequoyah Nuclear Plant Suite 225, Box 194 P.O. Box 2000 Knoxville, Tennessee 37919 Soddy Daisy, Tennessee 37379 Tennessee Department of Mr. M. R. Harding Public Health Tennessee Valley Authority ATTN:
Director, Bureau of Sequoyah Nuclear Plant Environmental Health Services P.O. Box 2000 Cordell Hull Building Soddy Daisy, Tenressee 37379 Nashville, Tennessee 37219 Mr. D. L. Williams Mr. Michael H. Mobley, Director Tennessee Valley Authority Divisine of Radiological Health 400 West Sumit Hill Drive T.E.R.R.A. Building W10 B85 150 9th Avenue North Knoxville, Tennessee 37902 Nashvilie, Tennessee 37203 County Judge Dr. Henry Myers, Science Advisor Hamilton County Courthouse Comittee on Interior Chattanooga, Tennessee 3740?.
and Insular Affairs U.S. House of Representatives Washington, D.C.
20515 Pr. S. A. White Manager of Nuclear Power Tennessee Valley Authority 6N 38A Lookout Place 1101 Market Street Chattanooga, Tennessee 37402-2801
b ENCLOSURE 1 TVA/NRC MEETING FEBRUARY 11, 1988 Name Affiliation Eileer McKenna NRC/OSP Ed Goodwin NRC/OSP T. A. Ippolito TVA/ Licensing Mark Burzynski SQ Licensing John Kirkebo TVA Directnr of Engineering William Raughley TVA - Chief Electrical Engineer Jim Hutson TVA - DNE Steve Richardson NRC/0SP A. Kuske NRC Consultant A. Marinos NRC/OSP B. D. Liaw NRC/0SP Paul Gill NRC/NRR/SELB
?
Suheil Z. Haddad SAL /EAD M. Sedlacik TVA/DNE G. L. Nicely TVA/DNE Barry A. Kimsey TVA SQN Reg. Licensing R. E. Allen UESC G. M. Aggarwal UE&C F
i o
k
7-4 DIESEL GENERA'IOR INE0RMATION PROVIDED 1D NRC Diesel Load Analysis' Calculation (SQN-E3-002)
DG Rating - Tech Specs Letter - Regulatory Guide 1.9 Diesel Test Results/ Voltage Profile Qalculation (SQN-E3-011)
ENCLOSURE 2
.1' SEQUOYAH DIESEL GENERATORS o
. Reg Guide 1.9 Diesel Generator Testing o
o-Calculations Methodology Revie'ws o
Results Testing Calculations Equipment Performance Safety System Performance l
l I
I o
i
.3
~
'6 c
SEQUOYAH ENGINEERED SAFEGUARDS SYSTEM PERFORMANCE o
Testing Actual' Loads o
Calculations IEEE Methodology Utilized Field Data Locked Rotor i
4 DISTRIBUTION FOR MEETING SUM 4ARY DATED: February 22, 1988 Facility:
Sequoyah Nuclear P.lant, Unit 2*
Docket 111e NRC PDR Local PDR Projects Reading S. Ebneter/J. Axelrad S. Richardson B. D. Liaw G. Zech E. McKenna C. Jamerson 0GC J. <lutberg F. Miraglia E. Jordan J. Partlow E. Goedwin A. Kusko A. Marinos P. Gill ACRS(10)
Hon. M. Lloyd Hon. J. Cooper Hon. D. Sundquiest Hon. A. Gore Mr. R. King, GAO P. Gwynn J. Scarborough G. Marcus C. Miller T. Elsasser C. Ader TVA-Bethesda SQN File
- Copies sent to persons on facility service list
)
e-
~,. - -.., - -
r
- -, -