Summary of 880211 Meeting W/Util Re Load Sequencing of Plant Diesel Generators.Attendance List & Handout Matl Used During Meeting Encl
ML20149M607
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 02/22/1988
From: Mckenna E
NRC OFFICE OF SPECIAL PROJECTS
To:
NRC OFFICE OF SPECIAL PROJECTS
References
NUDOCS 8802260166
Download: ML20149M607 (8)


Text

.

f h

UNITED STATES n

NUCLEAR REGULATORY COMMISSION y

1; W ASMiko YON, D. C. 20666

%,.... * /

February 22, 1988 l

Occket Nos. 50-327/328 LICENSEE: TENNESTEE VALLEY AUTHORITY (TVA)

FACILITY: SEQUOYAH NUCLEAR PLANT, UNIT 2

SUBJECT:

SUMMARY

OF MEETING - FEBRUARY 11, 1988 RECARDING DIESEL GENERATOR LOAD SEQUENCING On February 11, 1988 members of the NRC staff met with representatives of TVA to discuss load sequencing of the Sequoyah diesel generators. A itst of attendees is provideo in Enclosure it the handout material used during f.he meeting is provided in Enclosure 2.

t This meeting was a follewup to discussions held at the Sequoyah site regarding conforr.ance with Regulatory Guide 1.9 guidance for voltage and frequency limits i

during load sequencing.

TVA has performed tests on til four of the diesel generators to monitor voltage 4

and fr w ency response as loads are sequenced.

Some of the loads, such as safety injection pumps, cannot be run in a full-flow condition during such testing. Thus, the test running load is somewhat les* than the actual

)

worst-case accident leadirg. TVA perforeed calculations for both the test condition and the actual loading conditions to develop a "compensation factor" to account for the additional loading. The difference from the calculations was then added to tne voltage drop from the test case to represent the actual voltage drop.

The staff raised concerns because the analysis results did not bound the test results; that is, the caleviated voltage drop was not as large as the measured value. TVA has argued that the running load at the time of pump start does not have a significant effect en the voltage dip at that point. However, since in some cases, there is not a large margin between the calculated voltages and the

~

equipment requirements the staff needs further assurance that the true response of the diesels to a full load has been censidered.

One alternative discussed at the meeting was to examine the ratio of currents for the test and actual loads ard to adjust the test value of voltage drop 2

accordingly. An adequate demonstration of equipment functionality with a safety 1

i l

2-i factor applied to provide margin, would then resolve this concern. TVA agreed to evaluate this approach and will meet with the staff shortly to continue discussions on this issue.

Original Signed by-Eileen McKenna, Project Manager L

TVA Projects Division Office of Special Projects

Enclosures:

As stated c

w/ enclosures:

See next page DISTRIBUTION Docket File NRC PDR Local PDR See Those on Attached List (TSP:DTVA/LA 0' PMIY 'PM 05 -

A/BC

,P CJTy rson EMcKenna os

, y88 2/p/88 2////88 2/J2/88

Tennessee Valley Authority Sequoyah Nuclear Plant Cc:

General Counsel U.S. Nuclear Regulatory Comission Regional Administrator, Region !!

Tennessee Ya" Sy Authority 400 West Surs ; Hill Drive 101 Marietta Street, N.W.

Eli R33 Atlanta, Georgia 30323 Knoxville, Tennessee 37902 Resident Inspector /Sequoyah NP Mr. R. L. Gridley c/o U.S. Nuclear Regulatory Comission r

Tennessee Valley Authority 2600 Igou Ferry Road SN 1576 Lookout Place Soddy Daisy, Tennessee 373)9 Chattanooga, Tennessee 37402-2801 Pr. Richard King Mr. H. L. Abercrombie e/o U.S. GAO Tennessee Valley Authority 1111 North Shore Drive Sequoyah Nuclear Plant Suite 225, Box 194 P.O. Box 2000 Knoxville, Tennessee 37919 Soddy Daisy, Tennessee 37379 Tennessee Department of Mr. M. R. Harding Public Health Tennessee Valley Authority ATTN:

Director, Bureau of Sequoyah Nuclear Plant Environmental Health Services P.O. Box 2000 Cordell Hull Building Soddy Daisy, Tenressee 37379 Nashville, Tennessee 37219 Mr. D. L. Williams Mr. Michael H. Mobley, Director Tennessee Valley Authority Divisine of Radiological Health 400 West Sumit Hill Drive T.E.R.R.A. Building W10 B85 150 9th Avenue North Knoxville, Tennessee 37902 Nashvilie, Tennessee 37203 County Judge Dr. Henry Myers, Science Advisor Hamilton County Courthouse Comittee on Interior Chattanooga, Tennessee 3740?.

and Insular Affairs U.S. House of Representatives Washington, D.C.

20515 Pr. S. A. White Manager of Nuclear Power Tennessee Valley Authority 6N 38A Lookout Place 1101 Market Street Chattanooga, Tennessee 37402-2801

b ENCLOSURE 1 TVA/NRC MEETING FEBRUARY 11, 1988 Name Affiliation Eileer McKenna NRC/OSP Ed Goodwin NRC/OSP T. A. Ippolito TVA/ Licensing Mark Burzynski SQ Licensing John Kirkebo TVA Directnr of Engineering William Raughley TVA - Chief Electrical Engineer Jim Hutson TVA - DNE Steve Richardson NRC/0SP A. Kuske NRC Consultant A. Marinos NRC/OSP B. D. Liaw NRC/0SP Paul Gill NRC/NRR/SELB

?

Suheil Z. Haddad SAL /EAD M. Sedlacik TVA/DNE G. L. Nicely TVA/DNE Barry A. Kimsey TVA SQN Reg. Licensing R. E. Allen UESC G. M. Aggarwal UE&C F

i o

k

7-4 DIESEL GENERA'IOR INE0RMATION PROVIDED 1D NRC Diesel Load Analysis' Calculation (SQN-E3-002)

DG Rating - Tech Specs Letter - Regulatory Guide 1.9 Diesel Test Results/ Voltage Profile Qalculation (SQN-E3-011)

ENCLOSURE 2

.1' SEQUOYAH DIESEL GENERATORS o

. Reg Guide 1.9 Diesel Generator Testing o

o-Calculations Methodology Revie'ws o

Results Testing Calculations Equipment Performance Safety System Performance l

l I

I o

i

.3

~

'6 c

SEQUOYAH ENGINEERED SAFEGUARDS SYSTEM PERFORMANCE o

Testing Actual' Loads o

Calculations IEEE Methodology Utilized Field Data Locked Rotor i

4 DISTRIBUTION FOR MEETING SUM 4ARY DATED: February 22, 1988 Facility:

Sequoyah Nuclear P.lant, Unit 2*

Docket 111e NRC PDR Local PDR Projects Reading S. Ebneter/J. Axelrad S. Richardson B. D. Liaw G. Zech E. McKenna C. Jamerson 0GC J. <lutberg F. Miraglia E. Jordan J. Partlow E. Goedwin A. Kusko A. Marinos P. Gill ACRS(10)

Hon. M. Lloyd Hon. J. Cooper Hon. D. Sundquiest Hon. A. Gore Mr. R. King, GAO P. Gwynn J. Scarborough G. Marcus C. Miller T. Elsasser C. Ader TVA-Bethesda SQN File

  • Copies sent to persons on facility service list

)