ML20149M506
| ML20149M506 | |
| Person / Time | |
|---|---|
| Site: | Westinghouse |
| Issue date: | 11/27/1996 |
| From: | Mcalpine E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Fici J WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP. |
| Shared Package | |
| ML20149M507 | List: |
| References | |
| NUDOCS 9612170248 | |
| Download: ML20149M506 (2) | |
Text
,
f November 27, 1996 i
Westinghouse Electric Corporation ATTN: Mr. J. A. Fici Manager 1
Columbia Plant Commercial Nuclear Fuel Division 4
Drawer R Columbia, SC 29250
SUBJECT:
NRC INSPECTION REPORT NO. 70-1151/96 05 AND NOTICE OF VIOLATION
Dear Mr. Fici:
This refers to the inspection conducted on October 29 - November 1, 1996, at the Columbia Nuclear Fuel Plant. The purpose of the inspection was to determine whether activities authorized by the license were conducted safely and in accordance with NRC requirements. At the conclusion of the inspection, the findings were discussed with those members of your staff identified in the 1
enclosed report.
Areas examined during the inspection are identified in the report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observation of activities in progress.
Based on the results of this inspection, certain of your activities appeared to be in violation of NRC requirements, as specified in the enclosed Notice of Violation (Notice).
You are required to respond to this letter and should follow the instructions specified in the enclosed Notice when preparing your response.
In your response, you should document the specific actions taken and any additional actions you plan to prevent recurrence. After reviewing your response to this Notice, including your proposed corrective actions and the results of future inspections, the NRC will determine whether further NRC enforcement action is necessary to ensure compliance with NRC regulatory requirements.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its enclosures will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely.
Original signed by E. J. McAlpine Edward J. McAlpine Chief Fuel Facilities Branch Division of Nuclear Materials Safety Docket No. 70-1151 i*, cense No. SNM 1107
Enclosures:
(See page 2)
~961E170248 961127 PDR ADOCK 07001151 C
PDR 9 01
l WEC 2
Enclosures:
1.
NRC Inspection Report cc w/encls:
Wilbur Goodwin, Manager Regulatory Affairs Westinghouse Electric Corporation Commercial Nuclear Fuel Division Drawer R Columbia, SC 29250 Max Batavia, Chief Bureau of Radiological Health S. C. Department of Health and Environmental Control 2600 Bull Street Columbia, SC 29201 Distribution w/encls:
E. McAlpine, RII C. Bassett. RII G. Shear, RIII C. Cain RIV F. Wenslawski, RIV PUBLIC Distribution w/o encls:
License Fee Management Branch Orrfrr pf f nNm
%(
SIGNATURE NAME CBassett DATE 11 / A L / 96 11 /
/ 96 11 /
/ 96 11 /
/ 96 11 /
/ 96 11 /
/ 96 COPY?
NO YES NO YES NO YES NO YES NO YES NO OrrILIAL ktLOKO LOM OOLUMthi NAMt: 1: \\F r bil\\ktr>Okib\\WtL96ub.kP i