February 11, 1988 Ricardo Artigas, Manager AISTRIBUTON:
Licensing & Consulting Services wentrahnye A AThadani EImbro General Electric Company NRC PDR
'JRichardson JJoyce Nuclear Energy Business Operations PDSNP Rdg LShao JStewart Mail Code 682 LRubenstein JPartlow GThomas 175 Curtner Avenue DScaletti SWeiss CTan San Jose, California 95125 DCrutchfield FHarkins CTinkler FMiraglia KHooks
Dear Mr. Artigas:
JSniezek JSpraul The purpose of this letter is to inform you of the intended staff audit of the ABWR design quality assurance. Although GE is the sole applicant for the design certification, the ABWR design was a joint ttchnical effort between Hitachi, Toshiba and GE. Because of this joint design effort, special
^
attention to the Appendix B design QA requirements is warranted; especially for those pcrtions of the ABWR designed by Toshiba and Hitachi.
The purpose of the audit will be to review a representative portion of the total ABWR design process; however, special emphasis will be placed on those portions of the design attributable to Toshiba and Hitachi.
It is intended that this audit will provide the basis for the staff's review of the ABWR as it relates to design QA. Also, it is anticipated that the system design information accuired through the audit will facilitate the other SRP reviews carried out in support of the NRC's design certification process.
The audit will be conducted by an interdisciplinary team of approximately 10
~
experienced staff people over a 5 day period. The special audit team will be compromised of hRR staff experienced in t'ne following review areas: Reactor Systems, Plant Systems Instrumentation and Control Systems, Structural Engineering and Quality Assurance. Where appropriate, those assigned to the QA audit team are the regular assigned ABWR systems reviewers.
The audit will be preceded by a short initial visit by 3 staff members February 23-25, 1988, to identify areas of importance on which the audit team members should focus their attention.
It is expected that the full team audit will take place in late April 1988. Members of your staff were previously informed of the details of this audit.
If you have questions regarding this audit please contact me at (301) 492-1104.
Sincerely, i
original si ned b DinoC.Scafetti,ProjectManager Standardization and Non-Power Reactor Project Directorate i
Division of Reactor Projects - III, IV, V and Special Projects J
Office of Nuclear Reactor Regulation o.k q, M PD PDSNP w
DSc i:cw LRubenstein 02
/88 02/It/88 8802250461 880211 TOPRPENVGKiy PDR
s
- >=ato4
/
o UNITED STATES
~,,
NUCLEAR REGULATORY COMMISSION n
f
.,1 w ssMGTON, D. C. 20665 g.....,/
February ll, 1988 Ricardo Artigas, Manager Licensing & Consulting Services General Electric Company Nuclear Energy Business Operations Mail Code 682 175 Curtner Avenue San Jose, California 95125
Dear Mr. Artigas:
The purpose of this letter is to inform you of the intended staff audit of the ABWR design quality assurance. Although GE is the sole applicant for the design certification, the ABWR design was a joint technical effort between Hitachi, Toshiba and GE. Because of this joint design effort, special attention to the Appendix B design QA requirements is warranted; especially for those portions of the ABUR designed by Toshiba and Hitachi.
The purpose of the audit will be to review a representative portion of the total ABWR design process; however, special emphasis will be placed on those portions of the design attributable to Toshiba and Hitachi.
It is intended that this audit will provide the basis for the staff's review of the ABWR as it relates to design OA. Also, it is anticipated that the system design information acquired through the audit will facilitate the other SRP reviews carried out in support of the NRC's design certification process.
The audit will be conducted by an interdisciplinary team of approximately 10 experienced staff people over a 5 day period. The special audit team will be compronised of hRR staff experienced in the following review areas: Reactor Systems, Plant Systems, Instrumentation and Control Systems, Structural Engineering and Quality Assurance. Where appropriate, those assigned to the QA audit team are the regular assigned ABWR systems reviewers.
The audit will be preceded by a short initial visit by 3 staff members February 23-25, 1988, to identify areas of importance on which the audit team members should focus their attention.
It is expected that the full team audit will take place in late April 1988. Members of your staff were previously informed of the details of this audit.
If you have questions regarding this audit please contact me at (301) 492-1104.
Sincerely, Dino C. Scaletti, Projec lianager Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects - III, IV, Y and Special Projects Office of Nuclear Reactor Regulatien l