ML20149M191

From kanterella
Jump to navigation Jump to search
Forwards Steam Generator Tube Plugging Inservice Insp Rept
ML20149M191
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 12/02/1987
From: Miller D
YANKEE ATOMIC ELECTRIC CO.
To: Russell W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20149M193 List:
References
NUDOCS 8802250400
Download: ML20149M191 (2)


Text

1 CONNECTICUT YANKEE ATOMIC POWER COMPANY 2

HADDAM NECK PLANT RRe1

  • BOX 127E
  • EAST HAMPTON, CONN.06424 j

Mr. W. T. Russell December 2, 1987 U.S. Nuclear Regulatory Cor: mission Region I Docket No. 50-213 631 Park Avenue King of Prussia, PA 19406

Reference:

Haddam Neck Plant Steam Generator Tube Plugging Inspection Report Dated September 14, 1987

Dear Mr. Russell:

Plant Technical Specifications require that the complete results of the Steam Generator Tube Inservice Inspection be reported to the Ccemission within 90 days days after coepletion of the inspection.

The results of the inspection are attached.

Very truly yours, t

[

{

Donald B, Miller, Jr.

Station Superintendent DBM:DJR/eac

Attachment:

Steam Generator Tube Inspection Report cc: Director, Nuclear Reactor Regulations, Washington D.C. (I)

Ao11 i

l hlG *

  • ggo 8802250400 071202

-fC M PDR ADOCK 05000213 G

PDR