ML20149M055

From kanterella
Jump to navigation Jump to search
Summarizes Steam Generator Tube Plugging as Required by Tech Specs Plant to Be Reported to Commission within 15 Days Following Inservice Insp of Steam Generator Tubes
ML20149M055
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 08/01/1986
From: Graves R
CONNECTICUT YANKEE ATOMIC POWER CO.
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 8802250280
Download: ML20149M055 (2)


Text

r

]

f CONNECTICUT YANKEE ATO MIC POWER COMPANY

~

HADDAM NECK PLANT RR 31. BOX 127E. EAST H AMPTON. CONN. 06424 August 1, 1986 Docket No. 50-213 Dr. T. E. Murley U.S. Nuclear Regulatory Commission Region 1 631 Park Avenue King of Prussia, PA 19406

Dear Dr. Murley:

Haddam Neck Plant Steam Generator Tube Plugging Report Plant Technical Specifications require that the number of tubes plugged in each steam generator be reported to the commission within fifteen days following inservice inspection of steam generator tubes.

A total of 126 tubes were plugged.

119 tubes were plugged due to flaws within the top one inch of hard roll.

Two tubes were plugged due to leakage. Two tubes were accidently plugged due to plugging vendor mistakes. One tube was plugged which was missed during our previous winter 1986 refueling outage. One tube was plugged due to suspicion of leakage (boric acid buildup around tube end). Finally, one tube was plugged due to an indication in its roll transition zone, a flav which was identified as the cause for leakage of one of the leakers mentioned abo.e.

The number of tubes plugged in each steam generator is shown below:

Steam Generator Number of Tubes Plugged Total Tubes Plugged To Date 1

0 140 2

33 237 3

38 76 4

55 93 Total 126 546 Very truly yours,

[Mdn-Richard H. Graves Station Superintendent lac 0002250280 860801 KO )