ML20149L346

From kanterella
Jump to navigation Jump to search
Informs That Ja FitzPatrick Nuclear Power Plant Chosen for Operational Safeguards Response Evaluation During Week of 970915-18
ML20149L346
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 07/25/1997
From: Modes M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Michael Colomb
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
References
NUDOCS 9708010015
Download: ML20149L346 (4)


Text

_._

t f

y I

j~

July 25,1997 5

Mr. Michael J. Colomb Site Executive Officer New York Power Authority i

James A. FitzPatrick Nuclear Power Plant

)

Post Office Box 41

}

Lycoming, NY 13093

['

SUBJECT:

OPERATIONAL SAFEGUARDS RESPONSE EVALUATION (OSRE)

Dear Mr. Colomb:

j The NRC is in the process of conducting operational safeguards response evaluations (OSREs) at nuclear power reactors. I wish to formally inform you that the James A.

g FitzPatrick Nuclear Power Plant has been chosen for such a review scheduled for the week of September 15-18,1997.

l This confirms the previously conducted telephonic scheduling.

l

.The primary objective of the OSRE program is to evaluate the readiness of licensees' onsite security forces to respond to an external threat. A focus of these reviews is the priorities established between plant operations and security departments for protection of equipment

.and the defensive strategies used. These reviews complement NRC's licensing and regionalinspection functions.

An OSRE team includes a nuclear systems engineer, reactor safeguards specialists, and at least two NRC contractors. Additional assistance is provided by an inspector from the NRC regional office and an NRC resident inspector.

The first day on site begins with an entrance briefing, which will provide an overview of the team's objectives and anticipated activities for the duration of the visit. Any licensee questions on methodology or other matters are then' addressed so that a common understanding can be reached. Also, the suggested schedule for the onsite activities is discussed, and key licensee contact persons are identified. It is through these contact persons that arrangements are made for knowledgeable licensee personnel to escort the team members during the review.

After the entrance briefing,- the OSRE team takes a general orientation tour of the protected area perimeter. Following the orientation tour, the team will meet with appropriate site security, operations, and/or engineering staff to select and walk down potential sets of targets to be used in response drills and table-top exercises. 'The team will observe response' drills, which should be conducted using normal drill procedures and participants.

Team participation will be limited to scenario selection and drill observation.

I

\\

h Q'

j 9708010015 970725 h

P.DR ADOCK 05000333 p

PDR 2

4

T

  • i.

',\\

Mr. Mi.:nael J. Colomb 2

The team will also conduct several table-top response exercises with response team leaders. Additionally, the team willinterview training staff and observe weapons familiarity and proficiency. The team nuclear systems engineer will also want to meet with additional plant operators to assure that security systems are not interfering with safe operation of the plant.

Please provide appropriate plant personnel support for the OSRE team during the scheduled evaluation. Specifically, security members will require escorts from the security training department, and the team systems engineer will need an individual familiar with safety equipment location and functional capabilities. The team will make every effort to schedule its activities so as to avoid disruption of normal plant operations. The time that various team members spend on site may vary, but generally will range from six to eight hours per day. Some of this time is expected to be during evening hours.

If you have any questions regarding the conduct of the operational safeguards response evaluation program which you wish to have answered prior to the team's visit, please contact David Orrik, Safeguards Branch at (301) 415-3213, or Greg Smith at (610) 337-5263.

Sincerely, e--

Michael C. Modes, Chief Emergency Preparedness, Safeguards Branch and incident Response Center Division of Reactor Safety Docket No. 50-333

4

.S Mr. Michael J.- Colomb 3

cc w/ encl:

C. D. Rapplayea, Chairman and Chief Executive Officer R. Schoenberger, President and Chief Operating Officer J. Knubel, Chief Nuclear Officer and Senior Vice President H. P. Salmon, Jr., Vice President of Nuclear Operations W. Josiger, Vice President - Engineering and Project Management J. Kelly, Director - Regulatory Affairs and Special Projects T. Dougherty, Vice President - Nuclear Engineering R. Deasy, Vice President - Appraisal and Compliance Services T. Telfke, Site Security Manager R. Patch, Director - Quality Assurance G. C. Goldstein, Assistant, General Counsel C. D. Faison, Director, Nuclear Licensing, NYPA K. Peters, Licensing Manager T. Morra, Executive Chair, Four County Nuclear Safety Committee Supervisor, Town of Scriba C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law 1

P. Eddy, Director, Electric Division, Department of Public Service, State of New York G. T. Goering, Consultant, New York Power Authority J. E. Gagliardo, Consultant, New York Power Authority E. S. Beckjord, Consultant, New York Power Authority F. William Valentino, President, New York State Energy Research and Development Authority J. Spath, Program Director, New York State Energy Research and Development Authority

~-

Mr. Michael J. Colomb 4

Distribution w/ encl:

Nuclear Safety Information Center (NSIC)

PUBLIC NRC Resident inspector Regic,n i Docket Room (with concurrences)

J. Wiggins, DRS G. Smith, DRS E. King, DRS P. Frechette, DRS J.Rogge,DRP R. Barkley, DRP R. Junod, DRP W. Dean, OEDO (WMD)

A. Dromerick, NRR K. Cotton, NRR l

D. Hood, NRR M. Campion, RI Inspection Program Branch, NRR (IPAS)

R. Correia, NRR lt. Talbot, NRR.

L. Cunningham, NRR DOCDESK i

i i

d DOCUMENT NAME: G:\\EP&SB\\ MODES \\

Ta receive a copy of this document. Indicate in the hos:

"C" = Copy withe.it attachment / enclosure

E" = Copy with attachment / enclosure "N" = No copy l OFFICE Rl/DRS l

Rl/DRP

// /)

Rl/DRS Rl/

l Rl/

lNAME GSmith rg JRogge ////,

MModes lDATE 07/24/97 7

07/d/97 i'

07/ /97 07/ /97 07/ /97 OFFICIAL RECORD COPY t}