Forwards Insp Rept 50-382/95-23 on 951220-960112.No Violations Noted
ML20149L296
Person / Time
Site: Waterford 
Issue date: 02/20/1996
From: Dyer J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Barkhurst R
ENTERGY OPERATIONS, INC.
Shared Package
ML20149L298 List:
References
EA-96-025, EA-96-25, NUDOCS 9602260155
Download: ML20149L296 (5)


See also: IR 05000382/1995023

Text

l

.

4 "%s,I

t

UNITED STATES

[p.

g

NUCLEAR REGULATORY COMMISSION

M

$

REGION IV

l

%[

611 RYAN PLAZA DRIVE, SulTE 400

.

k

/,

AR LINGTON, TEXAS 76011 8064

FEB 2 01996

EA 96-25

Entergy Operations, Inc,

ATTN:

Ross P. Barkhurst, Vice President

'

Operations, Waterford

P.O. Box B

Killona, Louisiana 70066

SUBJECT: NRC INSPECTION REPORT 50-382/95-23

This refers to the inspection conducted by Mr. T. W. Pruett of this office on

December 20, 1995 through January 12, 1996, at the Waterford Steam Electric

Station, Unit 3 facility.

The purpose of the inspection was to determine

whether activities authorized by the license were conducted safely and in

accordance with NRC requirements. At the conclusion of the inspection, the

findings were discussed with you and those members of your staff identified in

,

'

the enclosed report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted o,f selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

Based on the results of this inspection, four apparent violations were

identified and are being considered for escalated enforcement action in

accordance with the " General Statement of Policy and Procedure for NRC

Enforcement Actions" (Enforcement Policy), (60 FR 34381; June 30, 1995).

The apparent violations discussed in the enclosed report include the failure

to:

(1) maintain the auxiliary component cooling (ACCW) system in an operable

status; (2) correct a design deficiency in the ACCW system that had been

identified on a number of occasions, (3) test the ACCW pump discharge check

valve in accordance with the ASME code; and (4) obtain authorization prior to

the deletion of requirements from a work instruction. Accordingly, no Notice

of Violation is presently being issued for these inspection findings.

In

addition, please be advised that the number and characterization of apparent

violations described in the enclosed inspection report may change as a result

of further NRC review.

A predecisional enforcement conference to discuss these apparent violations

has been scheduled for March 5, 1996.

The decision to hold a predecisional

enforcement conference does not mean that the NRC has determined that a

violation has occurred or that enforcement action will be taken.

This

conference is being held to obtain information to enable the NRC to make an

enforcement decision, such as a common understanding of the facts, root

causes, missed opportunities to identify the apparent violation sooner,

corrective actions, significance of the issues and the need for lasting and

9602260155 960220

PDR

ADOCK 05000392

G

PDR

.

,

l

.

l

t .

Entergy Operations, Inc.

-2-

effective corrective action.

In addition, this is an opportunity for you to

point out any errors in our inspection report and for you to provide any

information concerning your perspectives on (1) the severity of the

violations, (2) the application of the factors that the NRC considers when it

determines the amount of a civil penalty that may be assessed in accordance

with Section VI.B.2 of the Enforcement Policy, and (3) any other application

of the Enforcement Policy to this case, including the exercise of discretion

!

in accordance with Section VII.

l

You will be advised by separate correspondence of the results of our

deliberations on this matter.

No response regarding these apparent violations

l

is required at this time.

l

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of

'

this letter and its enclosure will be placed in the NRC Public Document Room

.

(PDR).

1

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sinc ely, (

l

.

vc

j

l

J. E. Dye , Director

-

Division of Reactor Projec

l

Docket:

50-382

License:

NPF-38

Enclosure.

NRC Inspection Report

j

t

l'

50-382/95-23

l

cc w/ enclosure:

l

Entergy Operations, Inc.

l

ATTN:

J. Yelverton

Executive Vice President

and Chief Operating Officer

P.O. Box 31995

,

l

Jackson, Mississippi

39286-1995

Entergy Operations, Inc.

ATTN: Jerrold G. Dewease, Vice President

!

Operations Support

P.O. Box 31995

Jackson, Mississippi

39286-1995

!

__

i

.

O

Entergy Operations, Inc.

-3-

.

Wise, Carter, Child & Caraway

ATTN: Robert B. McGehee, Esq.

P.O.-Box 651

Jackson, Mississippi

39205

Entergy Operations, Inc.

ATTN:

D. R. Keuter, General

Manager Plant Operations

P.O. Box B

Killona, Louisiana 70066

Entergy Operations, Inc.

ATTN:

Donald W. Vinci

Licensing Manager

P.O. Box B

Killona, Louisiana 70066

Chairman

Louisiana Public Service Commission

One American Place, Suite 1630

Baton Rouge, Louisiana 70825-1697

Entergy Operations, Inc.

ATTN:

R. F. Burski, Director

Nuclear Safety

P.O. Box B

Killona, Louisiana 70066

William H. Spell, Administrator

Louisiana Radiation Protection Division

P.O. Box 82135

Baton Rouge, Louisiana 70884-2135

Parish President

St. Charles Parish

P.O. Box 302

Hahnville, Louisiana 70057

Mr. William A. Cross

Bethesda Licensing Office

3 Metro Center

Suite 610'

Bethesda, Maryland 20814

Winston & Strawn

ATTN: Nicholas S. Reynolds, Esq.

1400 L Street, N.W.

Washington, D.C.

20005-3502

l

.

\\

.

l

Entergy Operations, Inc.

-4-

E 20 E

E-Mail report to D. Nelson (DJN)

E-Mail report to NRR Event Tracking System (IPAS)

bcc to DMS (IE 14)

bec distrib. by RIV:

L. J. Callan

Resident Inspector

Branch Chief (DRP/D)

Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

MIS System

DRS-PSB

RIV File

Project Engineer (DRP/D)

Branch Chief (DRP/TSS)

)

1

DOCUMENT NAME:

R:\\_WAT\\WT523RP.TWP

To receive sepy of doc,ument, indicate in box:"C" = Copy w)thout enclosures T = Copy with enclosures T = No copy

RI

_,J

OE )%/ /4L

C:DRP/Em #

D:DRP J l

E

TWPrudW' W

GFSanborni

PHHar.9 %17

JEDyeF / s

'

02/%7/36

02/A/96

02/W/9$

02/M99

0FFICIAL RECORD COPY

L-

1

,.

e

Entergy Operations, Inc.

-4-

FEB 201996

)

l

t

'

i

E-Mail report to D. Nelson (DJN)

l

E-Mail report to NRR Event Tracking System (IPAS)

.,

-,

j

[4sidsfsi~DNY(IE14)'~~d

i

bec distrib, by RIV:

]

L. J. Callan

Resident Inspector

Branch Chief (DRP/D)

Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

MIS System

DRS-PSB

RIV File

Project Engineer (DRP/D)

Branch Chief (DRP/TSS)

l

l

l

DOCUMENT NAME:

R:\\_WAT\\WT523RP.TWP

To receive copy of doownent, indicate in bor "C" = Copy w,ithout enclosures *E" = Copy with, enclosures "N" = No copy

R1

_,J

OE W /dL

C:DRP/[m #

D:DRP # l

E

l

TWPru W W

GFSanborni

PHHarp41U

JEDyeF w

I

02f4/96

'

02/Jo/96

02/W/9(

02/$97

0FFICIAL RECORD COPY

l

P60003

,

i

,