ML20149L258
| ML20149L258 | |
| Person / Time | |
|---|---|
| Site: | 05200003 |
| Issue date: | 02/21/1996 |
| From: | Huffman W NRC (Affiliation Not Assigned) |
| To: | Quay T NRC (Affiliation Not Assigned) |
| References | |
| NUDOCS 9602260018 | |
| Download: ML20149L258 (4) | |
Text
.- -.
February 21, 1996 MEMORANDUM TO: Theodore R. Quay, Director Standardization Project Directorate Division of Reactor Program Management, NRR FROM:
William C. Huffman, Project Manager original. signed by:
Standardization Project Directorate Division of Reactor Program Management, NRR
SUBJECT:
NOTICE OF MEETING WITH WESTINGHOUSE TO DISCUSS THERMAL-HYDRAULIC UNCERTAINTY ISSUES RELATED TO THE AP600 DESIGN DATE AND TIME:
February 27, 1996 - 1 p.m. - 5 p.m.
LOCATION:
U.S. Nuclear Regulatory Commission One White Flint North i
11555 Rockville Pike e
'Rockville, Maryland 20852 Room 0-8 Bil PURPOSE:
DiscussrecentNRCcommentsonthelWestinghouseMAAP4
^
Benchmarking plan along with' review of Thermal-Hydraulic Uncertainty programmatic objectives.
Seeja{tachedagenda.
PARTICIPANTS *:
EC WESTINGHOUSE r
~
c A. Levin a..
- D. OhkaWat.W T. Collins B. Monte 'i, y R.-Caruso C. Haag-B. Huffman, et al.
B..McIntyre, et al.
Constantine Tzanos (ANL)-
Docket No.52-003 1
Attachment:
As stated cc w/ attachment:
See next page
- Meetings between the NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meeting Open to the Public," 59 Federal Reaister 48344, 9/20/94.
However, portions of this sweting may be closed to protect Westinghouse proprietary information. Members of the public who wish to attend should contact me at (301) 415-1141.
DISTRIBUTION:
See next page DOCUMENT NAME: A:FEB27T-H.NOT 3
I fa seeelve e sepy of this desument,Inesses in the hon: 'C' = Copy without ettechment/ enclosure
- E' s Copy with ettechmentlenolosure
- N* = No copy 0FFICE PM:PDST:DRPM SC:PDST:DRPMl l
l l
NAME WHuffman W W 1tKiThitzelf/V DATE 02/1/96
' 02/2/ /96 '
0FflCIAL RECORD COPY PDR ADOCK 05200003 r '. '. u 'L a n l,9 [ [
9602260018 960221 J
~
ti e
'd L W A
t Westinghouse Electric Corporation Docket No.52-003 cc: Mr. Nicholas J. Liparulo, Manager Mr. Frank A. Ross Nuclear Safety and Regulatory Analysis U.S. Department of Energy, NE-42 Nuclear aid Advanced Technology Division Office of LWR Safety and Technology Westinghouse Electric Corporation 19901 Germantown Road P.O. Box 355 Germantown, MD 20874 Pittsburgh, PA 15230 Mr. Ronald Simard, Director Mr. B. A. McIntyre Advanced Reactor Program Advanced Plant Safety & Licensing Nuclear Energy Institute Westinghouse Electric Corporation 1776 Eye Street, N.W.
Energy Systems Business Unit Suite 300 Box 355 Washington, DC 20006-3706 Pittsburgh, PA 15230 DSA, Inc.
Mr. John C. Butler Ms. Lynn Connor Advanced Plant Safety & Licensing Suite 610 Westinghouse Electric Corporation 3 Metro Center Energy Systems Business Unit Bethesda, MD 20814 Box 355 Pittsburgh, PA 15230 Mr. James E. Quinn, Projects Manager LMR and SBWR Programs Mr. M. D. Beaumont GE Nuclear Energy Nuclear and Advanced Technology Division 175 Curtner Avenue, M/C 165 Westinghouse Electric Corporation San Jose, CA 95125 One Montrose Metro 11921 Rockville Pike Mr. John E. Leatherman, Manager Suite 350 SBWR Design Certification Rockville, MD 20852 GE Nuclear Energy, M/C 781 San Jose, CA 95125 Mr. Sterling Franks U.S. Department of Energy Barton Z. Cowan, Esq.
NE-42 Eckert Seamans Cherin & Mellott Washington, DC 20585 600 Grant Street 42nd Floor Pittsburgh, PA 15219 Mr. S. M. Modro Nuclear Systems Analysis Technologies Mr. Ed Rodwell, Manager Lockheed Idaho Technologies Company PWR Design Certification Post Office Box 1625 Electric Power Research Institute Idaho Falls, ID 83415 3412 Hillview Avenue Palo Alto, CA 94303 Mr. Charles Thompson, Nuclear Engineer AP600 Certification U.S. Department of Energy NE-451 Washington, DC 20585 6
AGENDA W/NRC MEETING ON AP600 T-H UNCERTAINTY ISSUES l
FEBRUARY 27, 1996 i
I.
Overview of simplified MAAP4 cases l
II.
Discussion of MAAP4 benchmarking plan III. T/H Uncertainty Plan IV.
W to address the five points in an NI:C letter dated August 14, 1995, concerning the T-H Uncertainty plan V.
Conclusions 4
i i
a 4
l
)
Attachment
o V
1 DISTRIBUTION:
Docket File PUBLIC PDST R/F WRussell/FMiraglia, 0-12 G18 RZimmerman, 0-12 GIS AThadani, 0-12 G18 DCrutclifield BGrimes RArchitzel TKenyon DJackstn BHuffman JSebrosky WDean, 0-17 G21 JMoore, 0-15 B18 EJorden, T-4 D18 (e-mail)
PMNS (e-mail)
OPA (e-mail)
ACRS (11)
Alevin, 0-8 E23 TCollins, 0-8 E23 RJones, 0-8 E21 GHsii, 0-8 E23 i
RCaruso, 0-8 E2 Receptionist (0WFN)
. f. -
i