ML20149L226
| ML20149L226 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 07/25/1997 |
| From: | Dyer J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Gambhir S OMAHA PUBLIC POWER DISTRICT |
| Shared Package | |
| ML20149L228 | List: |
| References | |
| 50-285-97-07, 50-285-97-7, NUDOCS 9707310201 | |
| Download: ML20149L226 (2) | |
See also: IR 05000285/1997007
Text
. . . _ . . . . . . . . . . . . . . . . . . . . .
.. .
. . . . . . . _ .
. . .
3
.
.
gS88%,
UNITED STATES '
{
gi
%
NUCLEAR REGULATORY COMMISSION
I
g
REGION iv
+9*****+0[
611 RYAN PLAZA drive, SUITE 400
s
ARLINGTON. TEXAS 76011-8064
JUL 2 51997
S. K. Gambhir, Division Manager
Production Engineering
Omaha Public Power District.
Fort Calhoun Station FC-2-4 Adm.
P.O. Box 399
Hwy. 75 - North of Fort Calhoun
Fort Calhoun, Nebraska 68023-0399
SUBJECT: NRC INSPECTION REPORT 50-285/97-07 AND NOTICE OF VIOLATION
Dear Mr. Gambhir:
Thank you for your letter of June 19,1997, in response to our letter and Notice of
Violation dated May 19,1997. We have reviewed your reply and find it responsive to the
concerns raised in our Notice of Violation. We note that you disagreed with Violation A
being cited as failure to initiate a condition report to document a valve body to bonnet
steam leak and stated that the citation should have been for failure to initiate a work
request or deficiency tag as required by Standing Order M-101, " Maintenance Work-
Control," After reviewing your explanation, we agree. The steam leak in question- did not
affect the operability of the steam-driven auxiliary feedwater pump and did not represent a
Enclosed is a revision to the Notice of Violation issued with NRC Inspection
Report 50-285/97 07, revised to reflect the appropriate violation. Because your reply of
June .19,1997, was satisfactory, no additional response is required. We will review the
implementation of your corrective actions during a future inspection to determine that full
compliance has been achieved and will be maintained.
Sincerely,
.
James E. Dyer
Deputy Regional Administrator
Docket No.: 50-285
License No.: DPR-40
Enclosure:
)
\\
9707310201 970725
ADOCK O
g5
gg
g
gl
G
.
1
,
...
. .
. . . . . . .
.
. . . .. .
.
.>
F
.
.
Omaha Public Power District
2-
cc w/ enclosure:
James W. Tills, Manager
Nuclear Licensing
Omaha Public Power District
Fort Calhoun Station FC-2-4 Adm.
- P.O. Box 399
Hwy. 75 - North of Fort Calhoun
Fort Calhoun, Nebraska 68023-0399
James W. Chase, Manager
Fort Calhoun Station
P.O. Box 399
Fort Calhoun, Nebraska 68023
Perry D. Robinson, Esq.
Winston & Strawn
1400 L. Street, N.W.
Washington, D.C. 20005 3502
Chairman
Washington County Board of Supervisors
1
Blair, Nebraska 68008
Cheryl Rogers, LLRW Program Manager
Environmental Protection Section
Nebraska Department of Health
301 Centennial Mall, South
P.O. Box 95007
Lincoln, Nebraska 68509 5007
[
r
I
cI.
Omaha Public Power District
-3-
JUL 2 51997
MMNNY$$
bec distrib. by RIV:
Regional Administrator
DRS-PSB
DRP Director
MIS System
Branch Chief (DRP/B)
RIV File
Project Engineer (DRP/B)
Branch Chief (DRP/TSS)
Resident inspector
DOCUMENT NAME: R:\\_FCS\\FC707AK.WCW
To receive copy of document, Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy
RIV:PE:DHP/B
C:DRP/B
D:DRP
DNGraves;df *
WDJohnson *
TPGwynn*
JEDyer M
7/18/97
7/18/97
7/20/97
7/2S97
- previously concurred
OFFICIAL RECORD COPY
l
l
>