ML20149L226

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-285/97-07.Revised NOV Reflecting Appropriate Violation Encl.No Response Required
ML20149L226
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 07/25/1997
From: Dyer J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Gambhir S
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20149L228 List:
References
50-285-97-07, 50-285-97-7, NUDOCS 9707310201
Download: ML20149L226 (2)


See also: IR 05000285/1997007

Text

. . . _ . . . . . . . . . . . . . . . . . . . . . .. .

. . . . . . . _ .

. . .

3

. .

gS88%, UNITED STATES ' {

gi  % NUCLEAR REGULATORY COMMISSION I

g REGION iv

s 611 RYAN PLAZA drive, SUITE 400

+9*****+0[ ARLINGTON. TEXAS 76011-8064

JUL 2 51997

S. K. Gambhir, Division Manager

Production Engineering

Omaha Public Power District.

Fort Calhoun Station FC-2-4 Adm.

P.O. Box 399

Hwy. 75 - North of Fort Calhoun

Fort Calhoun, Nebraska 68023-0399

SUBJECT: NRC INSPECTION REPORT 50-285/97-07 AND NOTICE OF VIOLATION

Dear Mr. Gambhir:

Thank you for your letter of June 19,1997, in response to our letter and Notice of

Violation dated May 19,1997. We have reviewed your reply and find it responsive to the

concerns raised in our Notice of Violation. We note that you disagreed with Violation A

being cited as failure to initiate a condition report to document a valve body to bonnet

steam leak and stated that the citation should have been for failure to initiate a work

request or deficiency tag as required by Standing Order M-101, " Maintenance Work-

Control," After reviewing your explanation, we agree. The steam leak in question- did not

affect the operability of the steam-driven auxiliary feedwater pump and did not represent a

condition adverse to quality.

Enclosed is a revision to the Notice of Violation issued with NRC Inspection

Report 50-285/97 07, revised to reflect the appropriate violation. Because your reply of

June .19,1997, was satisfactory, no additional response is required. We will review the

implementation of your corrective actions during a future inspection to determine that full

compliance has been achieved and will be maintained.

.

Sincerely,

James E. Dyer

Deputy Regional Administrator

Docket No.: 50-285

License No.: DPR-40

Enclosure: )

Notice of Violation

\

9707310201 970725

PDR

G

ADOCK O g5

.

gg g gl

1

,

... . . . . . . . . . .

. . . .. .

.

.>

F

. .

Omaha Public Power District 2-

cc w/ enclosure:

James W. Tills, Manager

Nuclear Licensing

Omaha Public Power District

Fort Calhoun Station FC-2-4 Adm.

- P.O. Box 399

Hwy. 75 - North of Fort Calhoun

Fort Calhoun, Nebraska 68023-0399

James W. Chase, Manager

Fort Calhoun Station

P.O. Box 399

Fort Calhoun, Nebraska 68023

Perry D. Robinson, Esq.

Winston & Strawn

1400 L. Street, N.W.

Washington, D.C. 20005 3502

Chairman

Washington County Board of Supervisors 1

Blair, Nebraska 68008

Cheryl Rogers, LLRW Program Manager

Environmental Protection Section

Nebraska Department of Health

301 Centennial Mall, South

P.O. Box 95007

Lincoln, Nebraska 68509 5007

[

r

I cI.

Omaha Public Power District -3-

JUL 2 51997

MMNNY$$

bec distrib. by RIV:

Regional Administrator DRS-PSB

DRP Director MIS System

Branch Chief (DRP/B) RIV File

Project Engineer (DRP/B) Branch Chief (DRP/TSS)

Resident inspector

DOCUMENT NAME: R:\_FCS\FC707AK.WCW

To receive copy of document, Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy

RIV:PE:DHP/B C:DRP/B D:DRP DRA

DNGraves;df * WDJohnson * TPGwynn* JEDyer M

7/18/97 7/18/97 7/20/97 7/2S97

  • previously concurred

OFFICIAL RECORD COPY

l

l

>