ML20149K253

From kanterella
Jump to navigation Jump to search
Forwards Semiannual FFD Rept for Period of Jul-Dec 1995
ML20149K253
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/13/1996
From: Stetz J
CENTERIOR ENERGY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
2356, NUDOCS 9602220086
Download: ML20149K253 (4)


Text

e O

o b _ causason W

ENERGY 300 Modison Awnue Jehe P. Stolt Toledo, OH 436524001 Vice President - Nuclear 419-240-2300 Davis-Besse Docket Number 50-346 License Number NPF-3 Serial Number 2356 February 13, 1996 United States Nuclear Regulatory Commission Document Control Desk Washington, D. C.

20555

Subject:

Semiannual Fitness-For-Duty Report July - December, 1995 Gentlemen:

Pursuant to 10 CFR 26.71(d) " Record Keeping Requirements", Toledo Edison submits its Semiannual Fitness-For-Duty (FFD) report for the period of July - December, 1995 for Davis-Besse Nuclear Power Station, Unit 1.

, provides Toledo Edison's FFD Program Performance Data. provides a summary of management actions taken by Toledo Edison based on positive FFD testing results, presumptive positives, and a list of FFD event reports submitted by Toledo Edison.

Should you have any questions or require additional information, please contact Mr. James L. Freels, Manager - Regulatory Affairs, at (419) 249-2366.

Very truly yours, eld Attachments cc:

L. L. Gundrum, NRC Project Manager H. J. Miller, Regional Administrator, NRC Region III S. Stasek, DB-1 NRC Senior Resident Inspector Utility Radiological Safety Board 9602220086 960213 PDR ADOCK 05000346 R

PDR operating Companies.

bg) l jcf i Cleveland Electne Illuminating Toledo Edison i

b a

Docket Number 50-346 License Number NPF-3 Serial Number 2356 Toledo Edison's Fitness-For-Duty Report 4

July - December 1995 l

D s

1 2

i l

2 o

4

e s

a Docket Number 50-346 License Nurhber NPF - 3 Serial Number 2356 Fitness for Duty Program Performance Data Page 1 of 1 Personnel Subject to 10CFR 26 Toledo Edison December 31.1995 Company 6 Months Ending Davis-Besse (419)249-2366 Location Phone J. L. Freels. Manager - Regulatory Affairs Contact Narne Cutoffs: Screen / Confirmation (ng/ml)

Appendix A to 10CFR 26 Mirijuana 50/15 Amphetamines 1000/500 Cocaine 300/150 Phencyclidine 25/25 Opiates 300/300 Alcohol (%BAC) 0.04 Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number with Unescorted Access 919 92 Cttegories Tested Positive Tested Positive Tested Positive Pre-Access 33 0

47 1

j Post Accident 1

0 0

0 Observed Behavior 2

0 0

0 Random 300 0

11 0

Follow-up 11 0

2 0

Other 1

0 0

0 Total 348 0/0 60 0/1 Breakdown of Confirmed Positive Tests for Spec!fic Substances Marijuana Cocaine Opiates Amphe-Phency-Alcohol Refusal tamines clidine to test Licensee Employees 0

0 0

0 0

0 0

Long-Term Contractors 0

0 0

0 0

0 0

Short-Term Contractors 1

0 0

0 0

0 0

A Total 1

0 0

0 0

0 0

1

9 Docket Number 50-346 License Number NPF-3 Serial Number 2356 TOLEDO EDISON'S MANAGEMENT ACTIONS RELATING TO FITNESS-FOR-DUTY Toledo Edison Contractor Personnel Personnel Referred to EAP 0

0 Management Sanctions 0

0 Toledo Edison does not perform onsite initial drug screening tests; therefore, there are no unconfirmed presumptive positive results on which to base management actions.

TOLEDO EDISON'S FITNESS-FOR-DUTY REPORTS There were no Fitness-For-Duty reports submitted during this reporting period (July - December 1995).

I