E A CMSEnergy Conguny og Rock PdntNuclear Plant Kenneek R 90aners 10269 US-31 North PlantGeneralManager Charlevoix MI49720 July 22,1997 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-155 - LICENSE DPR BIG ROCK POINT PLANT -
1997 BIG ROCK POINT EMERGENCY EXERCISE SCOPE AND OBJECTIVES Attached is a description of the scope and objectives for the October 21,1997, Big Rock Point Plant emergency exercise. Big Rock Point has requested an exemption from the 1997 annual emergency preparedness exen:ise in a letter dated July 17,1997, due to he permanant cessation of operation of the plant by August 30,1997. If the exemption is granted, the scope and objectives attached will no longer be applicable.
Should you have any questions contact:
Big Rock Point Plant Kar:n Wooster
,,7)[)
Emergency Planning Supervisor 10269 US-31 North Charlevoix, MI 49720 (616) 547-8288 (k
A\\t
- x. g it J Addy Plant Manager CC:
Administrator, Region III, USNRC NRC Resident Inspector - Big Rock Point NRC Chief, Emergency Preparedness Section, Region III 9707300071 970722 9 M5 1141414H@ll)$15
^"c "
C 0000'7
i l
t 1
i A'ITACHMENT Consumers Energy Company l
Big Rock Point Plant i
Docket 50-155 1997 BIG ROCK POINT EMERGENCY EXERCISE SCOPE AND OBJECTIVES l
i i
3 Pages
BREX-97 SCOPE AND OBJECTIVES 1
SCOPE BREX-97 is designed to meet exercise requirements specified i the Site Emergency Plan and response by State an on of major portions of Joint Public Information Center will be activated duri tate of Michigan. The e
rcise.
OBJECTIVES The following objectives will be demonstrated as dictated by the e xercise scenario.
1.
Assessment and Classification A.
minutes of the conditions being presented. Assess and cla
- within 15 2.
Communications A.
local authorities and the State, and as soon as p een minutes to NRC using EPIP-6F.
one hour to the B.
the State in approximate fifteen minute intervals or authorities and ually agreed.
C.
Provide updates between appropriate emergency response faciliti every 30 minutes.
es approximately D.
Provide accurate press release information on plant condition s.
3.
Radiological Assessment and Control A.
Collect, analyze, and document radiological data.
B.
Analyze plant and environmental radiological conditions to devel actions for plant personnel in accordance with EPIP-5B.
op protective C.
actions for the public to recommend to the State pe velop protective i
2 BREX-97 SCOPE AND OBJECTIVES D.
Pmpare and brief personnel for activities requimd in high radiation areas.
E.
Monitor, track and document radiation exposure to maintenance, operations, and monitoring team personnel.
~
l F.
Calculate dose projections based on sample msults or monitor readings.
l
- 4. Emergency Response Facilities A.
Staff and activate onsite emergency response facilities within approximately 30 minutes of an Alert classification.
l 1
B.
Staff and activate the Emergency Operations Facility within about an hour and a half of the Alert declaration.
C.
Update status boards approximately every 30 minutes.
l D.
Document field teaan activities in logs and on OSC ar.d TSC status boards.
E.
Prioritize and track status of key in plant jobs.
5.
Direction and Control i
A.
Demonstrate effective command and control and transfer of command and control by the Site Emergency Directors and the EOF Director.
B.
Dispatch, and direct field team activities.
C.
Complete accountability within 30 minutes of the ALERT classification.
D.
Brief emergency response staffs in approximate 30 minute intervals, i
E.
Coordinate emergency response with the local and State governments.
F.
Demonstrate m-entry and recovery in accordance with procedures.
6.
Exercise Control A.
Allow adequate free play for players to demonstrate their capabilities.
B.
Accurately assess performance of exercise players and controllers and provide written documentation.
3 BREX-97 SCOPE AND ORTECTIVES C.
Provide data and dimetion to ensum the exercise proceeds according to the Sequence of Events.
.