Discusses Insp Repts 50-010/97-09,50-237/97-09 & 50-249/97-09 on 970419-0530 & Forwards Nov.Violation of Concern Because Effective & Timely Corrective Actions Were Not Taken to Address Improperly Stored Boric Acid
ML20149K171
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 07/01/1997
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jamila Perry
COMMONWEALTH EDISON CO.
Shared Package
ML20149K174 List:
References
50-010-97-09, 50-10-97-9, 50-237-97-09, 50-237-97-9, 50-249-97-09, 50-249-97-9, NUDOCS 9707300028
Download: ML20149K171 (3)


See also: IR 05000010/1997009

Text

, b,

k

?ll f>llC

.

f

14 - O I

h

1

1

l

c9

d,

l

July 1, 1997p,

8

>\\

S

-

Mr. J. S. Perry

3

m-

Site Vice President

3

g

Dresden Station

o

_,

Commonwealth Edison Company

g

6500 North Dresden Road

Morris, IL 60450

SUBJECT:

NRC INSPECTION REPORT 50-010/97009, 50-237/97009, 50-249/97009,

AND NOTICE OF VIOLATION

Dear Mr Perry:

This refers to the inspection conducted from April 19 to May 30,1997, at the Dresden

facility. The purpose of the inspection was to determine whether activities authorized by

the license were conducted safely and in accordance with Nuclear Regulatory Commission

(NRC) requirements. During this period, routine resident inspections, augmented by

visiting resident and regional personnel inspections, were performed. During the 6-week

period covered by this inspection period, your conduct of activities was generally

characterized by safety-conscious operations. The enclosed report presents the results of

these inspections.

,

During this period, your staff performed three shutdowns and four startups of Unit 2.

Your staff demonstrated the ability to perform these major evolutions in a controlled

manner with good communications. However, the inspectors identified that some of your

staff's performance of more routine activities was not in accordance with procedures.

Based on the results of this inspection, the NRC has determined that a violation of NRC

l

requirements occurred. This violation is cited in the enclosed Notice of Violation (Notice)

'

and the circumstances surrounding the violation are described in detailin the subject

inspection report. The violation is of concern because effective and timely corrective

actions were not taken to address improperly stored boric acid and borax staged for use

during alternate boron injection.

.

You are required to respond to this letter and should follow the instructions specified in the

enclosed Notice when preparing your response. The NRC will use your response, in part,

to determine whether further enforcement action is necessary to ensure compliance with

regulatory requirements.

\\

lll{i gi I,im]l.il;ylylrllltil-lsplllli\\

I

l ll Ill

9707300028 970701

ll;lll !ll l l

PDR

ADOCK OS00001O

.,

  • *' *-

G

PDR

<

L -_

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - . _ _ _ _ _

. _-

._

..

.

-

- - -

_ _ . . _ - - _ . - -

.-

.

1

'

J. S. Perry

-2-

l

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,

its enclosure (s), and your response will be placed in the NRC Public Document Room

(PDR).

l

Sincerely,

i

/s/ R. N. Gardner for

3,

1

Geoffrey E. Grant, Director

l

Division of Reactor Projects

i

i

Docket No. 50-10; 50-237; 50-249

License No. DPR-02, DPR-19, DPR 25

Enclosures:

Notice of Violation

inspection Report

{

cc w/ encl:

T. J. Maiman, Senior Vice President

Nuclear Operations Division

D. A. Sager, Vice President,

Generation Support

H. W. Keiser, Chief Nuclear

Operating Officer

T. Nauman, Station Manager Unit 1

M. Heffley, Station Manager Units 2 and 3

F. Spangenberg, Regulatory Assurance

Manager

l. Johnson, Acting Nuclear

.

Regulatory Services Manager

i

Richard Hubbard

l

Nathan Schloss, Economist

Office of the Attorney General

State Liaison Officer

Chairman, Illinois Commerce Commission

Document Control Desk-Licensing

DOCUMENT NAME: R:\\lNSPRPTS\\ POWERS \\DRES\\DRE97009 DRP

To receive a copy of this document, indicate in the box "C" = Copy without attach /enci

"E" = Copy with attach /enci "N" = No copy

OFFICE

Rlli 4/C

Rlli

Rlli

N

kh/co

Kropp_

Grant kY

NAME

DATE

7_

1/l/97

-

,

OFFICIAL RECORD COPY

l

-

,

..

.-.

. - - . . . . -

_ . -

_ . .

-

. . . . - . .

. _ - . - - . - - _ . . - _

.

'

.

..

'

,

i

J. S. Perry

-3-

Distribution:

4

Docket File w/enct

Project Manager, NRR w/enci

PUBLIC IE-01 w/ encl

Project Manager Unit 1, NRR w/enci

DRP w/enci

OC/LFDCB w/enci

Rlli PRR w/ encl

SRI LaSalle, Dresden,

CAA1 w/enci (E-Mail)

Quad Cities w/enci

A. B. Beach, w/ encl

RAC1 (E-Mail)

,

Rlli Enf. Coordinator, w/enci

Deputy RA, w/enci

'

DRS (2) w/enci

TSS w/enci

,

DOCDESK (E-mail)

i

4

L

i

k

i

,

4

4

1

1

$

1

<

1

, .-