ML20149K171
| ML20149K171 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 07/01/1997 |
| From: | Grant G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Jamila Perry COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20149K174 | List: |
| References | |
| 50-010-97-09, 50-10-97-9, 50-237-97-09, 50-237-97-9, 50-249-97-09, 50-249-97-9, NUDOCS 9707300028 | |
| Download: ML20149K171 (3) | |
See also: IR 05000010/1997009
Text
, b,
k
?ll f>llC
.
f
14 - O I
h
1
1
l
c9
d,
l
July 1, 1997p,
8
>\\
S
-
Mr. J. S. Perry
3
m-
Site Vice President
3
g
Dresden Station
o
_,
Commonwealth Edison Company
g
6500 North Dresden Road
Morris, IL 60450
SUBJECT:
NRC INSPECTION REPORT 50-010/97009, 50-237/97009, 50-249/97009,
Dear Mr Perry:
This refers to the inspection conducted from April 19 to May 30,1997, at the Dresden
facility. The purpose of the inspection was to determine whether activities authorized by
the license were conducted safely and in accordance with Nuclear Regulatory Commission
(NRC) requirements. During this period, routine resident inspections, augmented by
visiting resident and regional personnel inspections, were performed. During the 6-week
period covered by this inspection period, your conduct of activities was generally
characterized by safety-conscious operations. The enclosed report presents the results of
these inspections.
,
During this period, your staff performed three shutdowns and four startups of Unit 2.
Your staff demonstrated the ability to perform these major evolutions in a controlled
manner with good communications. However, the inspectors identified that some of your
staff's performance of more routine activities was not in accordance with procedures.
Based on the results of this inspection, the NRC has determined that a violation of NRC
l
requirements occurred. This violation is cited in the enclosed Notice of Violation (Notice)
'
and the circumstances surrounding the violation are described in detailin the subject
inspection report. The violation is of concern because effective and timely corrective
actions were not taken to address improperly stored boric acid and borax staged for use
during alternate boron injection.
.
You are required to respond to this letter and should follow the instructions specified in the
enclosed Notice when preparing your response. The NRC will use your response, in part,
to determine whether further enforcement action is necessary to ensure compliance with
regulatory requirements.
\\
lll{i gi I,im]l.il;ylylrllltil-lsplllli\\
I
l ll Ill
9707300028 970701
ll;lll !ll l l
ADOCK OS00001O
.,
- *' *-
G
<
L -_
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - . _ _ _ _ _
. _-
._
..
.
-
- - -
_ _ . . _ - - _ . - -
.-
.
1
'
J. S. Perry
-2-
l
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,
its enclosure (s), and your response will be placed in the NRC Public Document Room
(PDR).
l
Sincerely,
i
/s/ R. N. Gardner for
3,
1
Geoffrey E. Grant, Director
l
Division of Reactor Projects
i
i
Docket No. 50-10; 50-237; 50-249
License No. DPR-02, DPR-19, DPR 25
Enclosures:
inspection Report
{
cc w/ encl:
T. J. Maiman, Senior Vice President
Nuclear Operations Division
D. A. Sager, Vice President,
Generation Support
H. W. Keiser, Chief Nuclear
Operating Officer
T. Nauman, Station Manager Unit 1
M. Heffley, Station Manager Units 2 and 3
F. Spangenberg, Regulatory Assurance
Manager
l. Johnson, Acting Nuclear
.
Regulatory Services Manager
i
Richard Hubbard
l
Nathan Schloss, Economist
Office of the Attorney General
State Liaison Officer
Chairman, Illinois Commerce Commission
Document Control Desk-Licensing
DOCUMENT NAME: R:\\lNSPRPTS\\ POWERS \\DRES\\DRE97009 DRP
To receive a copy of this document, indicate in the box "C" = Copy without attach /enci
"E" = Copy with attach /enci "N" = No copy
OFFICE
Rlli 4/C
Rlli
Rlli
N
kh/co
Kropp_
Grant kY
NAME
DATE
7_
1/l/97
-
,
OFFICIAL RECORD COPY
l
-
,
..
.-.
. - - . . . . -
_ . -
_ . .
-
. . . . - . .
. _ - . - - . - - _ . . - _
.
'
.
..
'
,
i
J. S. Perry
-3-
Distribution:
4
Docket File w/enct
Project Manager, NRR w/enci
PUBLIC IE-01 w/ encl
Project Manager Unit 1, NRR w/enci
DRP w/enci
OC/LFDCB w/enci
Rlli PRR w/ encl
SRI LaSalle, Dresden,
CAA1 w/enci (E-Mail)
Quad Cities w/enci
A. B. Beach, w/ encl
RAC1 (E-Mail)
,
Rlli Enf. Coordinator, w/enci
Deputy RA, w/enci
'
DRS (2) w/enci
TSS w/enci
,
DOCDESK (E-mail)
i
4
L
i
k
i
,
4
4
1
1
$
1
<
1
, .-