ML20149K072
| ML20149K072 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 02/12/1988 |
| From: | Perkins K Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20149K075 | List: |
| References | |
| NUDOCS 8802230347 | |
| Download: ML20149K072 (3) | |
Text
h o
UNITED STATES
- ",i NUCLEAR REGULATORY COMMISSION 5
- < j WASHINGTON, D. C. 20555
\\...../
UNION ELECTRIC C0f!PANY CALLAWAY PLANT VNIT 1 u
DOCKET N0. STN 50-483 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.33 License No. NPF-30 1.
The Nuclear Regulatory Coninission (the Comission) has found that:
j A.
The application for amendment filed by Union Electric Company (the licensee) dated September 11, 1987 complies with the standards and requirer,ents of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; i
C.
There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifica-tions as indicated in the attachment to this license amendment, and para-i graph 2.C.(2) of Facility Operating License No. NPF-30 is hereby amended to l
read as follows:
1 8802230347 880212 l
PDR ADOCK 050 3
l P
i
. (2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 33, and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated into the license.
UE stall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, j
i 3.
This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION 9% +. N A Kenneth E. Perkins, Direct *'
Project Directorate III-3 Division of Reactor Projects
Attachment:
Changes to the Technical Specifications Date of Issuance: February 12, 1988 i
ATTACHMENT TO LICENSE AMENDMENT NO.qq OPERATING LICENSE NO. NPF-30 DOCKETN0.50-fg Revise Appendix A Technical Specifications by removing the page identified below and inserting the enclosed page.
The revised page is identified by the captioned amendment number and contain marginal lines indicating the area of change. The corresponding overleaf page is provided to maintain document completeness.
REMOVE INSERT 3/4 6-23 3/4 6-23
.