ML20149J927

From kanterella
Jump to navigation Jump to search
Forwards semi-annual Fitness for Duty Program Performance Data for Period of 970101-970630
ML20149J927
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 07/23/1997
From: Guarnieri S
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9707290151
Download: ML20149J927 (4)


Text

. _ _ _ _ _ _ _ _ _ _ - - _

susan R. GUAusnEns, M.D.

Baltimore Gas and Electric Company Afanager 39 W. Irxington Street Safety & AfedicalServices ISth Floor Baltimore. Afaryland2120s 410 234-7494 July 23,1997 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:

Document Control Desk

SUBJECT:

Calvert Cliffs Nuclear Power Plant; Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 Calvert Cliffs Independent Spent Fuel Storage Installation; Docket No. 72-8 Fitn_ss for Dutv: Program Performance Data (January 1 - June 30.1997)

The attached Semi-Annual Fitness for Duty Program Performance Data is submitted for the period of January 1 through June 30,1997, in accordance with 10 CFR 26.71(d).

Should you have questions regarding this matter, we will be pleased to discuss them with you.

Very truly yours, b

SRG/CDS/bjd Attachment cc:

(Without Attachment)

R. S. Fleishman, Esquire

11. J. Miller, NRC J. E. Silberg, Esquire Resident inspector, NRC A. W. Dromerick, NRC R. I. McLean, DNR Director, Project Directorate I-1, NRC J.11. Walter, PSC 9707290151 970723 hh h hh.l,$l1fl p

l Fitness for Duty Program Performance Data Personnel Subject to 10 CFR 26 BALTIMORE GAS & ELECTRIC COMPANY-06/30/1997 Company 6 Months Ending CALVERT CLIFFS NUCLEAR POWER PLANT F. BRUCE MARTENIS. PROGRAM MANAGER

_(410)234-6162' Contact Name Phone (area code)

CUTOFFS: Screen / Confirmation (ng/ml)

[X] Appendix A to 10 CFR 26 Marijuana 50/ng/ml Amphetamines

/

Cocaine

/

Phencyclidine

/

/

Opiates

/

Alcohol (% BAC)

_f 1

RANDOM TESTING RATE FOR EMPLOYEES & CONTRACTORS = 50%

4 Long-Term Short Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number with Unescoded Access 1830 61 554

)

Categories Tested Positive Tested Positive Tested Positive j

4 i

Pre Access 57 0

82 0

752 11 For Cause Post-accident 0

0 0

0 0

0 Observed Behavior 3

1 0

0 J

2 Random 456 1

23 0

207 0

Follow-up 4

0 0

0 0

0 j

Other 6

0 0

0 0

0 TOTAL 526 2

105 0

963 13 i

1 6

FITNESS FOR DUTY PROGRAM PERFORMANCE DATA PERSONNEL SUBJECTTO 10 CFR 26 Baltimore Gas & Electric Company Calvert Cliffs Nuclear Power Plant Reporting Period:

01/01/97-06/30/97 The following list is a breakdown of Manaaement Actions taken as a result of confirmed oositive drug / alcohol scree 5ings performed under the Calvert Cliffs Fitness For Duty Program:

TYPE OF TEST CONTRACTOR / EMPLOYEE ACTION TAKEN PRE-ACCESS Contractor 10 Drucs Access Denied Contractor 1 Alc61ol Access Denied RANDOM Employee (1) Drugs Access Terminated CAUSE Employee 1) Alcohol Contractor ((2) Alcohol Access Suspended Access Terminated

BREAKDOWN OF CONFIRM POSITIVE TESTS FOR SPECIFIC SUBSTANCES l

l

Amphe. ' Phency-1 Refusal l Marijuana Cocaine i Opiates ! tamines i lidine i_ Alcohol to Test 1

2 l

3 4

l l

l Licensee Employees 1

L1 l

l' l

}

Long-Term i

Contractors I

l l

l Snort-Term i

Contractors I

7 4

1 1

3 TOTAL 8

4 l

l 1

]

'I 4-15*

Note:

All THC positives were also tested at the 100/ng ml level and determined positive.

One contractor tested positive for three substances.

--