Text
I PARSONS Parsons Power Group loc. 267S Morgantown Road Reading, Pennsylvania 19607 -(610) 855-2000 Fax. (610) 855-2001 July 25,1997 Docket No. 50-336 -
Parsons NUM2-PPNR-0341-L U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 i
Millstone Nuclear Power Station Unit No. 2 Indeoendent Corrective Action Verification Program (ICAVP)
Gentlemen:
Attached you will find the changes noted on Attachment I to the Millstone Unit 2 ICAVP document titled
" Critical Design Characteristics - Overcooling Events" which as submitted under cover NUM2-PPNR-0316-L on the 18th of July 1997. These changes replace those issued previously and incorporate comments received during the public meeting on July 22,1997.
Sincerely,
/'
Daniel L. Curry Parsons ICAVP Project Director DLC:djv Attachments cc:
E. Imbro (2) - USNRC H. Eichenholz - USNRC R. Laudenat - NNECo J. Fougere - NNECo Rep. Terry Concannon - NEAC f
t mo\\
h7290061970725 p
ADOCK 05000336 PDR lil.EI.ElEI.E.lE.IK.ill.i g
ATTACHMENTI j
MILLSTONE UNIT 2 ICAVP Revisions / Changes to Critical Design Characteristics - Overcooling Events Jj Page changes to Critical Design Characteristics document e
Cover Sheet (replacement)
List of Effective Pages (initial issue)
Page 3 (replacement)
CSF Diagram Symbols - M2-T2CSFD-SYMB (addition - initial issue)
Critical Safety Function Diagram - M2-T2CSFD-RCSPI (replacement)
System Boundary Diagram - M2 T2SBD HPSil (replacement)
=
i l
4 i
.