JOSEPH M. FARLEY NUCLEAR PIMf UNIT 1 NARRATIVE SLtttARY OF OPERATIONS January, 1988 During the month of January, there were no unit shutdowns or significant power reductions.
'1he following major safety-related maintenance was perforined in the month of January:
- 1. Miscellaneous corrective and preventive maintenanoa was perforined on the diesel genetutors.
1 1
{
,I
..Ww f
f i
8802230132 880131
~
PDR ADOCK 05000348 3
N,,N.R
.DCD
OPERATING DATA REPCRT DOCKET NO.
50-348 DMT ~f/7/88--~ ~
CCMPIEITD BY J. D. Woodard
'ITLEPHCNE, ( 205)899-5156 OPERATING STMUS Notes
- 1. Unit Name:
Joseph M. Farley - Unit 1
- 2. Reporting Period:
January, 1988
- 1) Cumulative data since
- 3. Licensed Wermal Power (Et):
2,652 12-1-77, date of
- 4. Nameplate Rating (Gross twe):
860 comercial operation
- 5. Design Electrical Rating (Net We): 829
- 6. Maximum Dependable Capacity (Gross We):
852.6
- 7. Maximum Dependable Capacity (Net We):
812.6
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Brough 7) Since Last Report, Give Reasons: Items #6 and 47 have been changed due to evaluation of operating experience.
- 9. Power Level To Which Restricted, If Any (Net We):
N/A
- 10. Reasons For Restrictions, If Any:
N/A his Month Yr-to-Date Cumlative
- 11. Hours In Reporting Period 744 744 89,136
- 12. Number Of Hours Reactor Was Critical 744.0 744.0 65,960.7
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 3,650.0
- 14. Pours Generator On-Line 744.0 744.0 64.569.5
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross h ermal Energy Generated (?MH) 1,973,0sa 1,973,088 164,396,407
- 17. Gross Electrical Energy Generated ( WH) 645,200
__ 645,200
~T2,812,738
- 18. Net Electrical Energy Generated (WH) 613,570 613,S'/0 49,782,766
- 19. Unit Service Factor 100.0 100.0 72.4
- 20. Unit Availability Factor 100.0 100.0 72.4
- 21. Unit Capacity Factor (Using MDC Net) 101.5 101.5 69.4
- 22. Unit Capacity Factor (Using DER Net) 9 9. b~
99.5 67.4
- 23. Unit Forced Outage Rate 0.0 0.0 E6~
- 24. Shutdowns Scheduled over Pext 6 Months (Type, Date, and Duration of Each):
Refueling Aaintenance Outay, March 1988, approximately seven weeks
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
N/A
- 26. Units In Test Status (Prior to Comercial Operation):
Forecast Achieved INITIAL CRITICALITY 08/0647 08/09M 7 INITIAL ELECIRICITY 08/204 7 08/18/77 CCNtERCIAL OPERATICH 12/0147 12/01M 7 Form 2/34
DOCKET NO.
50-348 UNIT 1
MTE rebruary 2, 1988 COMPLETED BY J. D. Woodard TELEPHONE (205)899-5156 MCNIH January DAY AVERAGE MILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (PWe-Net)
(PWe-Ne()
1 818 17 820 2
821 18 817 3
827 19 816 4
827 20 819 5
831 21 822 6
831 22 823 7
829 23 826 8
827 24 824 9
828 25 822 10 828 26 826 11 826 27 829 12 826 28 828 13 825 29 827 14 827 30 825 15 826 31 821 16 825 INSEUCTIONS on this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
Form 13/21 m
_ _ _ - _ _. =
m.
UNIr SNUrDouWS AND POWER REDUCrzoGS DOCKER No.
50-348 UNIr NAME J.
M. FARIXr - Unte 1,
DArE rESSUARr 2, 1988 CoMFIErED BY J.
D. WooDARD J?JB' ARr TEIEPNoNE (2051899-5154 REPoar MONTE J
I I
I I
I I MErmoD or I t.xcEasEE I I
I cAusE 6 commEctrvE I
l l
l l Du= Arrow I I suurtzmo l EvEnr i srsrEn 1 coMec=Enr i
Acrzo so i
Isa.
I Dart i rreE' I (movasi i mEAson2,,,,,,,,c,,,3 g,,,,,,, g co,,4 y c,,,5 y
,,,,,,,,,co,,,,c, I
I I
I I
I I
I I
I I
imo untri suurDownsi on IsromirscAnr1 ro=Em I mEDuctions I ocevanED l Dvarna i rmE Monts 1 or JanUAmr.
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I i
i l
i i
i i
l I
I i
l i
l i
I i
1 1
I I
I i
1 I
I i
i i
i l
I i
i I
1 i
i I
I I
I i
i i
I i
I I
I I
I I
I I
I i
i I
I I
I I
I I
I I
I I
I I
i 1
1 I
I I
l l
1 1
I I
I I
I l
l 1
1 I
I I
i I
I I
I I
I I
I I
I I
I I
i I
I I
I I
I I
I I
I I
I I
i i
1 I
I I
I I
I I
I I
I I
I I
i l
1 I
I I
i 1
1 I
I I
I I
I I
I i
1 1
I i
i I
I i
l I
i i
I i
l I
i l
i i
I i
i i
i I
I I
I I
I i
1
' Method:
Exhibit G-Instructions rs rerced measons 5: Scheduled A-Equapsent railure (Explain) 1-Manual for Preparation of Data S-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee c-Refueling 3-Automatic Scram.
Event Report (IERI File (NURgre D-Regulatory Restriction 4-other (Esplain) 0161)
E-operator training & License Examination F-Admanistrative Exhibit I -Same Source G-operational Error (Explain)
(9/77)
H-other (Esplein)
I "HDI Eban 1/2
6 Alabama Powtr Company 600 North 16th Strost Post othee Box 2641 Birmingham. Alabama 35291 0400 Telephone 205 250-1835 L
Sen'ioNee"Pr sident Alabama Power the SO(.thern edectic system February 19, 1988 Docket No. 50-348 U. S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, D. C.
20555 Joseph M. Farley Nuclear Plant Unit 1 Monthly operating Data Report Attached are two (2) copies of the January 1988 Monthly Operating Report for Joseph M. Farley Nuclear Plant Unit 1, required by Section 6.9.1.10 of the Technical Specifications.
If you have any questions, please advise.
Yours very truly, ut.A../LY y
R. P. Mcdonald RP!VJGSamab/1.6 Attachments xc: