_. ,

s

}Qfj(/C

'

.

  1. W

f

%

UNITED STATES

  • .

k

NUCLEAR REGULATORY COMMISSION

REGroN lli

V

-

e

801 WARRENVILLE ROAD

k,

' lisle. ILLINOls 60532-4351

',

.....

July 15, 1997

.

.

Mr. John G. Cook

Senior Vice President

Clinton Power Station

Illinois Power Company

Mail Code V-275

P. O. Box 678

-

Clinton, IL 61727

SUBJECT:

CLINTON STARTUP READINESS ACTION PLAN CLOSE-OUT,

NRC INSPECTION REPORT NO. 50-461/9',012(DRP)

Dear Mr. Cook:

.

.

This letter and the attached inspection report, document the completion of our review of

specific corrective afons Illinois Power (IP) committed to complete prior to restarting

Clinton Power Station (CPS).

On September 5,1996, a reactor recirculation pump seal failed at CPS. Event follow up

by IP and NRC identified the need for extensive corrective actions. In a December 9,

1996, letter to the NRC, IP described 53 individual corrective actions that would be

completed prior to CPS restart. That letter was a follow-up to IP letters dated September

17 and 24,1996, and a September 11,1996, NRC Confirmatory Action Letter (CAL).

The 53 commitments in the December 9 letter were confirmed in NRC CAL No. Rill-97-01

'

issued to IP on January 9,1997. A request to amend one commitment was made in IP

letters dated February 7 and April 8,1997. The requested amendment was acceptable.

l

IP added two more commitments to those items discussed in the December 9 letter,

bringing the total to 55 corrective actions. These 55 commitments were contained in IP's

Startup Read; ness Action Plan (SRAP).

'

in a March 13,1997, letter to Mr. Larry Haab, Chief Executive Officer, IP, NRC informed

IP that an NRC unit restart and site performance improvement overdght panel (the panet)

{

had been formed. One p. pose of the panel was to assess the completeness and

effectiveness of your corrective actions. The panel held meetings, open to the public, with

IP on April 19, May 1,15, and 28, June 13 and July 3,1997, to discuss individual

commitment status and other matters affecting unit restart.

On July 3,1997, the NRC completed an inspection of your completed SRAP

commitments. The results of the inspection are documented in the attached Inspection

hlj

Report. The inspectors concluded that all SRAP commitments capable of being

accomplished with the unit shut down had been satisfied. Items Ill.3, IV.1, and IV.13

h

involving monitoriag operator perfom)ance during unit start up, "B" reactor

9707280247 970715

"

PDR

ADOCK 05000461

a

eda

Ill.lllll.lllll.lllll.illl.lllil.ltlll.lllill.li

i

i

i

"

1

J. Cook

-2 .

.

recirculation pump seal replacement, and feedwater check valves, have additional actions,

e.g., testing and observations, to be evaluated during plant startup and power ascension.

The panel has reviewed the attached report, and has concluded that you have satisfied the

commitment documented in the January 9,1997, CAL to perform 55 specific corrective

actions prior to restarting CPS and that those corrective actions have been effective.

While the specific items have been completed, long term system, program, and

organizational improvements will require continued effort and vigilance by IP management

and staff. NRC will continue to closely monitor CPS's performance for evidence that your

corrective actions continue to be effective.

In accordance with 10 CFR 2.790 of the NPC's " Rules of Practice," a copy of this letter

and its enclosure will be placed in the NRC Public Document Room (PDR).

Sincerely,

/s/ J. L. Cal. dwell

James L. Caldwell

Deputy Regional Administrator

Docket No.: 50-461

License Nos: NPF-62

Enclosure:

Inspection Report

No. 50/461-97012(DRP)

Distribution:

cc w/ encl:

W. D. Romberg, Assistant

Docket File w/ enc!

Vice President

OC/LFDCB w/enci

P. Yocum, Plant Manager

SRI Clinton, Dresden,

Clinton Power Station

LaSalle, Quad Cities

R. Phares, Manager-Nuclear Assessment Project Manager, NRR w/enci

J. Sipek, Director - Licensing

Rlli Enf. Coordinator, w/enci

Nathan Schloss, Economist

TSS w/ encl

Office of the Attorney General

DOCDESK (E-mail)

G. Stramback, Regulatory Licensing

DRP w/ encl

Services Project Manager

PUBLICJFud+ w/ encl

General Electric Company

Rlli PRR'w/enci

Chairman, DeWitt County Board

CAA1 w/enct (E-mail)

State Liaison Officer

A. B. Beach, w/enct

Chairman, Illinois Commerce Commission Deputy RA, w/ encl

DRS (2) w/ encl

1

DOCUMENT NAME: RAINSPRFCPOWERS\\ CLIN \\CU97012.DRP

To receive a copy of this document, indicate in the box "C" = Copy without

attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy

,

OFFICE

Rlli

gj y j

Rlli

(/,

y Rill

g

N,ljR

l/ J

Rll! ,, ,

l

NAME

BrowpfillnQV/, Wright /4t4/ Miller 1/4

PAlpH6j(4' arcus

Cajp% ell

]

DATE

07//t//97 y 07////97

07////97

07//f/97va e.407/(S/97

~

i

f

OFFICIAL. RECORD COPY