ML20149J358
| ML20149J358 | |
| Person / Time | |
|---|---|
| Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
| Issue date: | 02/16/1988 |
| From: | Haverkamp D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| 88-015, 88-15, NUDOCS 8802230008 | |
| Download: ML20149J358 (2) | |
Text
,
FEB 161988 i
No.88-015 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE REQUESTED MANAGEMENT MEETING Licensee:
Vermont Yankee Nuclear Power Corporation Facility:
Vermont Yankee Nuclear Power Station Docket No.:
50-271' Time and Date:
10:00 a.m., February 24, 1988 Location:
Division of Reactor Projects Conference Room Region I Office, King of Prussia, Pennsylvania
Purpose:
To Discuss, at Licensee Request: Utility Initiatives and Corrective Actions Related to the Systematic Assessment of Licensee Performance in the Areas of Radiological Controls Maintenance, Quality Assurance and Inservice Testing NRC Attendees:
S. Collins, Deputy Director, Division of Reactor Projects (DRP)
W. Johnston, Director, Division of Reactor Safety (DRS)
T. Martin, Director, Division of Radiation Safety and Safeguards (DRSS)
J. Wiggins, Chief, Reactor Projects Branch No. 3, DRP D. Haverkamp, Chief, Reactor Projects Section No. 3C, DRP G. Grant, Senior Resident Inspector, Vermont Yankee J, Kaucher, Project Engineer, RPS 3C, DRP V. Rooney, Project Manager, Project Directorate I-3, Office of Nuclear Reactor Regulation (NRR)
Licensee Attendees:
J. Weigand, President W. Murphy, Vice President and Manager of Operations J. Pelletier, Plant Manager D. Reid, Operations Support Manager R. Wanczyk, Operations Superintendent Note: Attendance by NRC personnel at this meeting should be made known by 4:00 p.m., February 22, 1988, via telephone call to D. Haverkamp, Region I, at FTS 8-346-5120 or (215) 337-5120.
Prepared By:
N8N EICced E7 V
D. R. Haverkamp, Chief d Reactor Projects Section No. 3C
}
OFFICIAL RECORD COPY MEETING NOTICE NO.88-015 - 0001.0.0 02/11/88 8802230008 880216 gDR ADOCK0500g1
[
N
1 FEB 161988 Meeting Notice Nc.88-015 2
Distribution:
V. Stello, Jr., Executive Director for Operations J. Taylor, Deputy Executive Director for Regional Operations J. Lieberman, Director, Office of Enforcement T. Murley, Director, Office of Nuclear Reactor Regulation J. Sniezek, Acting Associate Director for Inspection & Technical Assessment, NRR J. Partlow, Director, Division of Reactor Inspection & Safeguards, NRR F. Miraglia, Jr., Associate Director for Projects, NRR S. Varga, Director, Division of Reactor Projects I-II, NRR B. Boger, Assistant Director for Region I Reactors, NRR R. Wessman, Project Director, Project Directorate I-3, NRR V. Rooney, Project Manager, NRR B. Clayton, Regional Coordinator, ED0 Public Document Room (PDR) local Public Document Room (LPOR)
NRC Resident Inspector State of New Hampshire State of Vermont Commonwealth of Massachusetts (2)
J. DeVincentis, Vice President, Yankee Atomic Electric Company (YAEC)
R. Capstick, Licensing Engineer, YAEC C. Richcrdson, Vermont Public Interest Research Group, Inc.
G. Tarrant, Commissioner, Department of Public Service, State of Vermont P. Agnes, Assistant Secretary of Public Safety, Commonwealth of Massachusetts Licensee Attendees bec:
Regional Administrator Deputy Regional Administrator Division Directors Branch Chiefs Section Chiefs Region I Receptionist PA0 ORMA Files ORP Files Bulletin Board M. J. 010cnato, DRP RI:DRP RI:0RP I:0RP pr,jd Ha p kp Wiggins j
2/It/8 2//2/68 2/lh/88 0FFICIAL RECORD COPY MEETING NOTICE NO.88-015 - 0002.0.0 02/11/88 l
-,e-n.,,.
,., - - - -,., - - - - - - -, -