ML20149J259

From kanterella
Jump to navigation Jump to search
Ack Receipt of ,Which Transmitted Changes Identified as Rev 13 to Plant Suitability,Training & Qualification Plan Submitted Under Provisions of 10CFR50.54(p).Changes Acceptable
ML20149J259
Person / Time
Site: Palisades Entergy icon.png
Issue date: 12/23/1994
From: Caniano R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Rogers D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
References
NUDOCS 9501050097
Download: ML20149J259 (4)


Text

CCS

\\

December 23, 1994 Docket No. 50-255 Consumers Power Company ATTN: Mr. David W. Rogers Plant Safety and Licensing Director Palisades Nuclear Plant Consumers Power Company 27780 Blue Star Memorial Highway Covert, MI 49043

]

SUBJECT:

REVIEW 0F PALISADES SUITABILITY, TRAINING AND QUALIFICATION PLAN, REVISION 13.

Dear Mr. Rogers:

This letter acknowledges receipt of your letter dated May 25, 1994, which transmitted changes identified as Revision 13 to the Palisades Suitability, Training and Qualification Plan (STQP) submitted under the provisions of 10 CFR 50.54(p).

We have reviewed the submitted changes and have determined that they are consistent with the provisions of 10 CFR 50.54(p) and are therefore acceptable, except as noted in the enclosure of this letter.

For the item identified as being unacceptable under the criteria of 10 CFR 50.54 (p),

the previously approved plan must be followed.

The item determined to be unacceptable was discussed with your Senior Plant Property Protection Operating Supervisor and he agreed to further clarify the specific requirement.

You are requested to provide corrections to your suitability, training and qualification plan to address the issues identified in the enclosure within two months after receipt of this letter.

You may submit the changes either in accordance with 10 CFR 50.54(p) or 10 CFR 50.90.

In accordance with 10 CFR 2.790 of the Commiss. ion's regulations, a copy of this letter will be placed in the NRC Public Document Room.

$ h Ok g

9501050097 941223 PDR ADOCK 05000255 P

PDR

Consumers Power Company The response requested by letter is not subject to the clearance procedures of the Office of Management and Budget as reviewed by the Paperwork Reduction Act of 1980, PL 96-511.

Sincerely,

@ Signed by Roy J. Canlane Roy J. Caniano, Chief Reactor Support Programs Branch

Enclosure:

Review Comments cc:

See Attached List l

bec: NRR/DRIS/RSGB SG Case File: W70184 50WG SG Inspector File: Madeda SG Correspondence File:

G. M. Christoffer NRR Docket File

. DOCUMENT NAME:._.....

_,_L B:PA OFFICE RIII

$. RIII G RIII

(

RIII RIII NAME mr per WKroppg g

T RC g

~

DATE 12/92/94 12/2 1/94 12/W/94 12/ M/94 12fd) /94 OFFICIAL RECORD COPY

.(

i l

PALISADES i

Docket No. 50-255 i

cc:

Mr. Thomas J. Palaisano Nuclear Facilities and Plant General Manager Environmental Monitoring Palisades Plant Section Office 27780 Blue Star Memorial Highway Division of Radiological Health Covert, Michigan 49043-9530 Department of Public Health 3423 N. Logan Street Mr. Robert A. Fenech P.O. Box 30195 Vice President, Nuclear Operations Lansing, Michigan 48909 j

Palisades Plant i

27780 Blue Star Memorial Highway Gerald Charnoff, Esquire Covert, Michigan 49043-9530 Shaw, Pittman, Potts and Trowbridge 2300 N Street, N.W.

M. I. Miller, Esquire Washington, DC 20037 Sidley & Austin 54th Floor Alora Davis.

l One First National Plaza Commitment Tracking System Chicago, Illinois 60603 Coordinator l

Palisades Plant Mr. Thomas A. McNish, Secretary Consumers Power Company Consumers Power Company 27780 Blue Star Memorial Hwy.

212 West Michigan Avenue Covert, Michigan 49043-9530 l

Jackson, Michigan 49201 l

Michigan Department of Attorney j

Judd L. Bacon, Esquire General Consumers Power Company Special Litigation Division i

212 West Michigan Avenue 630 Law Building Jackson, Michigan 49201 P.O. Box 30212 Lansing, Michigan 48909 Township Supervisor Covert Township 36197 M-140 Highway Covert, Michigan 49043 l

Office of the Governor Room 1 - Capitol Building Lansing, Michigan 48913 U.S. Nuclear Regulatory Commission Resident Inspector Office Palisades Plant 27782 Blue Star Memorial Highway Covert, Michigan 49043-9530

. ~.

f' 9

i r

l l

[

PALISADES SUITABILITY, TRAINING AND QUALIFICATION PLAN l

(REVISION 13)

REVIEW COMMENTS l

f.agg Comment Section a

5.5 6 of 19 The description and justification document states that: "a requirement to i

ascend and descend a stairway has been added."

However, such a requirement is not clearly stated in the revision.

Clarify when such a requirement is to be executed.

I l

_