Forwards Insp Repts 50-317/94-33 & 50-318/94-32 on 941114-18.No Violations Noted
ML20149J160
Person / Time
Site: Calvert Cliffs  
Issue date: 12/16/1994
From: Meyer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Denton R
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML20149J163 List:
References
NUDOCS 9501050064
Download: ML20149J160 (2)


See also: IR 05000317/1994033

Text

__

._

_

_

_

_

. _ _ _ _ _

_

_

.

,

,.

,

December 16, 1994

Mr. Robert E. Denton

Vice President - Nuclear Energy

Baltimore Gas and Electric Company

Calvert Cliffs Nuclear Power Plant

1650 Calvert Cliffs Parkway

Lusby, MD 20657 - 4702

SUBJECT: COMBINED INSPECTION REPORT NOS. 50-317/94-33 AND 50-318/94-32

Dear Mr. Denton:

This letter transmits the findings of an inspection of licensed operator

requalification training conducted by J. Prell and N. Maquire-Moffitt from

~

November 14-18, 1994, at Calvert Cliffs Nuclear Power. Plant, Units 1 and 2.

The inspection was conducted to verify that the Calvert Cliffs'

j

requalification program for licensed operators ensured safe power operation by

l

effectively evaluating how well individual operators and crews have mastered

training and performance objectives. The inspection findings were discussed.

'

with Mr. K. Nietmann and other members of your staff at the conclusion of the

inspection.

Overall, the requalification training and evaluation program was determined to

',

be excellent. The training department did a very good job of identifying

operator weaknesses and recommending appropriate remediation. Operations

department involvement with the requalification training program was found to

be a major strength. The inspectors concluded that Calvert Cliffs' response

to past events involving operator errors was prompt and effective. The

,

training feedback system was also determined to be effective.

In accordance with 10 CFR 2.790 of NRC's " Rules of Practice," a copy of this

letter and the enclosure will be placed in the NRC Public Document Room.

If

you have any questions, please call me at (610) 337-5211.

l

Sincerely,

1

?

Glenn W. Meyer, Chief

BWR and PWR Sections

'

Division of Reactor. Safety

,

Enclosure: Combined Inspection Report Nos.

50-317/94-33 and 50-318/94-32 w/ Attachment 1

Docket Nos. 50-317

50-318

9501050064 941216

PDR

ADOCK 05000317

f,

PDR

7 g(){,

G

,

J

'

C400 LoQ

. - .

.

.

.

. . - - - - - - . . .

f

'

December 16, 1994

l

1

l

(

Mr. Robert E. Denton

2

cc w/ enc 1:

G. Detter, Director, Nuclear Regulatory Matters (CCNPP)

R. McLean, Administrator, Nuclear Evaluations

I

N. Millis, General Supervisor, Nuclear Training

J. Walter, Engineering Division, Public Service Commission of Maryland

K. Burger, Esquire, Maryland People's Counsel

R. Ochs, Maryland Safe Energy Coalition

State of Maryland (2)

Distribution w/ encl:

l

K. Abraham, (2)

l

PUBLIC

l

Nuclear Safety Information Center (NSIC)

i

NRC Resident Inspector

l

Region I Docket Room (with concurrences)

Distribution w/ enc 1:

(VIA E-MAIL)

W. Dean, OEDO (WMD)

P. Wilson - Calvert Cliffs

T. Marsh, NRR

D. Mcdonald, NRR

Nancy Maquire-Moffitt, PNL

M. Campion, RI

'

,

'

l

l

L

DOCUMENT NAME: A:CC943332. INS

T3 roosive a copy of #de document, incEcate in #m bom "C" = Copy without attachment / enclosure T = Copy with attachment / enclosure

"N" = No

copy

p

,

0FFICE

RI/D$

lj

RI/DRS /\\A

/

l

'

NAME

Prel ll@

Meyer 9 ( u

DATE

12/$)K/

12/tg /941

12/

/94

12/

/94

12/

/94

0FFICIAL RECORD COPY

]

r

-

- -