.,m-.....

Georg a Power Company

!c a 3 8

A la a Taiephoae 404 E26 6526 Ma bng A%eis:

Post off<e Bou 4545 Attar,ta, Georgra 30302 Georgia Power

""h L. T. Gucwa Mar.ager Nuclear Safety ard Licens;ng SL-4116 0768m X7GJ17-V600 February 16, 1988 t

U. S. Nuclear Regulatory Commission ATTN:

Docum ' Control Desk Hashington, D.C.

20$$5 PLANT V0GTLE - UNIT 1 NRC DOCKET 50-424 OPERATING LICENSE NPF-68 REACTOR TRIP BREAKER TECHNICAL SPECIFICATIONS Gentlemen:

In response to Enforcement Action 87-115 Georgia Power Company (GPC) indicated that a proposed change to the Vogtle Unit 1

Technical Specifications would be submitted to clarify the allowed outage time for reactor trip breakers.

Since that respons7 was submitted, GPC has been informed that the NRC staff intends to issue a safety evaluation report (SER) in the near future documenting their review of Hestinghouse Electric Corporation's HCAP

10271, Supplement 2,

"Evaluation of Surveillance Frequencies and Out of Service Times for the Engineered Safety Features Actuation System."

Among the Technical Specification changes proposed in this HCAP are revisions to the Allowed outage times and surveillance times for the reactor trip breakers and the automatic trip and interlock logic.

Since these changes are currently under review on a generic basis, GPC now proposes to await the issuance of the staff's SER and submit appropriate proposed changes to the Vogtle Technical Specifications following issuance of the NRC staff's SER.

In the interim, GPC will apply Action 13 of Technical Specification 3.3.1 in the following manner:

ACTION "Hith one of the diverse trip features (undervoltage or shunt trip attachment) inoperable restore it to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or declare the breaker inoperable and apply ACTION 10.

The breaker shall nX be bypassed while one of the diverse trip features is inoperable except for the time required for performing maintenance to restore the breaker to OPERABLE status."

8802220271 990216 Ol ADOCK 05000424 LDR b

PDR o

i i

C.... m GeorgiaPower A U. S. Nuclear Regulatory Commission February 16, 1988 Page Two INTERPRETATION Hith one diverse trip feature (undervoltage or shunt) inoperable, restore it to operable status within 43 hours4.976852e-4 days <br />0.0119 hours <br />7.109788e-5 weeks <br />1.63615e-5 months <br /> or declare the breaker inoperable and apply Action 10.

1he associated bypass breaker may be closed for performing maintenance to restore the diverse trip feature.

Action 10 must be appli6d during the time the bypass breaker is closed for this maintenar.ce.

Please contact this office if you have any questions.

Sincerely, cWY&"

L. T. Gucwa JH/im c: Georaia Power Comoany Mr. J. P. O'Reilly Mr. P. D. Rice Mr. G. Bockhold, Jr.

Mr. C. H. Hayes Mr. J. E. Swartzwelder GO-NORMS Southern Comoany Ssrvices Mr. R. A. Thomas Mr. J. A. Bailey Shaw. Pittman. Potts & Trowbridge Mr. B. M. Churchill, Attorney-at-Law Troutman. Sanders. Lockerman & Ashmore Mr. A. H. Domby, Attorney-at-Law U. S. Nuclear Regulatory Commission Dr. J. N. Grace, Regional Administrator Mr. J. B. Hopkins, Licensing Project Manager, NRR (2 copies)

Mr. J. F. Rogge, Senior Resident Inspector-Operations, Vogtle 0768m

~