ML20149H974
| ML20149H974 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 12/28/1994 |
| From: | Mccoy C GEORGIA POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20149H978 | List: |
| References | |
| LCV-0535, LCV-535, NUDOCS 9501040169 | |
| Download: ML20149H974 (1) | |
Text
-.
9.
Georg.a Power Comcany 40 loverness Center Parkway Post off,w Box 1295 11rmingham Af ab3ma 35201 Teiephone 205 877 7122 L
Georgia Power C. K. McCoy v.
e, nr nudear December 28, 1994 7, <. s,y,,,,,,, s.,m,, n,s,y,,,
LCV-0535 Docket No. 50-425 U. S. Nuclear Regulatory Cornmission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:
VOGTLE ELECTRIC GENERATING PLANT CORE OPERATING LIMITS REPORT in accordance with Technical Specification 6.8.1.6, Georgia Power Company hereby submits the enclosed revision 3 to the Core Operating Limits Report (COLR) for Vogtle Electric Generating Plant - Unit 2 Cycle 4. The revision adds figures 15 through 19.
Please contact this ofrice if you have any questions.
Sincerely, 0. mt '
C. K. McCoy CKM/IlWM Enclosure cc:
Georgia Power Comp 1ny Mr. J. B. Beasley, Jr.
Mr. M. Sheibani NORMS U. S. Nuckar Regulatory Commission Mr. S. D. Ebneter, Regional Administrator Mr. D. S. Hood, Licensing Project Manager, NRR Mr. B. R. Bonser, Senior Resident Inspector, Vogtle 9501040169 941223 l
PDR ADOCK 05000425 P
PDR I
A
,