Informs of Authorization to Resume Limited Fabrication of New Type B Packaging at Rate Not to Exceed Five Packagings Per Week & Requests,In Writing,Date Independent Audit Is Completed & Results of Audit Re CAL 97-7-06
ML20149H682
Person / Time
Site: 07109056, 07100102, 07109036, 07109263
Issue date: 07/23/1997
From: Paperiello C
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Dicharry R
SOURCE PRODUCTION & EQUIPMENT CO., INC.
References
CAL-97-7-06, CAL-97-7-6, NUDOCS 9707250124
Download: ML20149H682 (5)


Text

. _ .. .-

.- cero Fde (% w 4, $1 UNITED STATES g g NUCLEAR REGULATORY COMMISSION 7/- /4 K 2 WASHINGTON, D.C. 20666-0001

% July 23, 1997 1

Mr. R. D. Dicharry, President Source Production and Equipment Company, Inc. ,

113 Teal Street '

St. Rose, Louisiana 70087-9691

Dear _Mr. Dicharry:

l On June 24, 1997, the U. S. Nuclear Regulatory Commission issued Confirmatory

-Action Letter (CAL) No. 97-7-006, following an inspection at your facility in St. Rose Louisiana. Action Item No. 1 of the CAL suspended fabrication of all NRC-certified transportation packaging until authorization to resume is i received from the NRC.

The NRC performed an inspection of your Quality Assurance (0A) program implementation for fabrication related aspects on July 9-10, 1997. The inspection team identified weaknesses-regarding adequacy of procedures, 1 implementation of procedures, and documentation of quality related activities.

You submitted on July 14, 1997, a " Corrective Action Implementation Plan."

You stated that you plan to resume limited fabrication (maximum of five l packages per week) upon implementation of Phase I corrective actions and I authorization by NRC. Ycu attached to your letter 0A Procedure No. 97-01, '

" Phase.1 of Corrective Action Implementation Plan for SPEC QA Program" (Plan),

Revision (0), dated July 13, 1997. The NRC informed you in its letter dated July 15, 1997, that the Plan was acceptable. The NRC requested that you inform us in writing when you have completed the corrective actions described in GA Procedure No. 97-01.

You submitted on July 18, 1997, a letter stating that the activities and corrective actions specified in 0A Procedure No. 97-01 have been completed, with two exceptions. One exception was in regard to the composition of the Implementation Plan Oversight Team. The second exception was in regard to clarifying the corrective action taken to control " preliminary" drawings. The NRC reviewed these two exceptions and cetermined that they do not affect your corrective action activities. You also submitted on July 21, 1997, additional information regarding your corrective action activities, as requested by the NRC. In your July 18. 1997, letter you requested authorization to resume fabrication.

The NRC completed its review of the documentation describing your corrective action activities and finds the implementation of Phase I corrective action to be acceptable. You are authorized to resume limited fabrication of new Type B Jackaging at a rate not to exceed five packagings per week, as specified in OA Procedure No. 97-01.

(

Action Item No. 5 in the CAL remains open. This Action Item requires Source Production and Equipment Company Inc. (SPEC) to obtain the services of an i inde endent GA expert to audit the effectiveness of SPEC's OA 3rogram in comp $ying with the requirements of 10 CFR Part 71, advise the 4RC regarding h /gD the name and qualifications of the expert by July 21, 1997, and conduct the 1

9707250124 970723 PDR ADOCK 07100102 b uju NRC fM CENTER COPY

+

R. D. Dicharry- independent audit within 60 days of advising the NRC. You' advised the NRC of the name and qualifications of the independent GA ex)ert you will use to audit your QA program in your July 18, 1997, letter. The 4RC requests that you inform us in writing when the independent audit is completed, and include the.

results of the audit and any follow up actions you plan to take regarding findings identified in the audit.

If you have any questions, please contact Mr. Thomas Matula of my staff at 301-415-8563.

Sincerely,

/M $ b Carl J. Paperiello, Director Office of Nuclear Material Safety and Safeguards Dockets: 71-0102. 71-9036, 71-9056, 71-9263 I

i l

l

R. D. Dicharry independent audit within 60 days of advising the NRC. You advised the NRC of the name and qualifications of the independent GA e>oert you will use to audit your QA program in your July 18. 1997. letter. The 1RC requests that you inform us in writing when the independent audit is completed, and include the results of the audit and any follow up actions you plan to take regarding findings identified in the audit.

If you have any questions, please contact Mr. Thomas Matula of my staff at 301-415-8563.

Sincerely.

Original /s/ by:

Carl J. Paperiello. Director Office of Nuclear Material Safety and Safeguards Dockets: 71-0102. 71-9036. 71-9056. 71-9263 Distribution:

Dockets NRC File Center LCallan. EDO

'PUBLIC HThompson, EDO JThoma. EDO NMSS R/F SFP0 R/F NMSS Dir Off R/F SGagner. OPA LPortner. OCA RBlough. RI i BMallett. RII HMiller RI NMamish. NMSS l LReyes. RII EEasten. NMSS SBaggett. NMSS I RBangart. Si CPedersen. RIII JJankovich. NMSS  !

EMerscholt, RIV BWhite. NMSS JLieberman. OE i RChappell. NMSS DCool. MMSS PEng. NMSS l RScarano U.V DCollins. RII ABlough, RI CHaughney M.M LCamper. NMSS S0*Connor CPoland. !d'd N0sgood. NMSS DTiktinsky. NMSS Creamer. OGC W0lmstead. OGC JGoldberg. OGC l WWard. NMSS l

  • See previous concurrence. LMG/ PROOFED / JULY 23. 1997 0FC *SFP0 C *SFP0 C *SFP0 C *SFP0 C NMSS ,,

NAME TMatula/ TOM JJankovich cac ror, ssnankman can ter, wrxan.

CJP[h'ebllo DATE 07/22/97 07/22/97 07/22/97 07/22/97 07/ 2 3/97 l

Document Name: g:\0102ilb.ltr Last update: July 23, 1997 l

I i

l l

1 ,,

'. D. Dicharry  ?

! inde 'ndent audit within 60 days of advising the NRC. You advised the NRC of

the n and qualifications of the independent GA ex)ert you will use to audit your 0A ogram in your July 18, 1997, letter. The 4RC requests ~that you inform us 'n writing when the independent audit is completed, and include the resul ..; of e audit and any follow up actions you plan to take regarding findings ide 'fied in the audit.

If you have any estions. please contact Mr. Thomas Matula of my staff at 301-415-8563.

Sincerely.

Carl J. Paperiello. Director Office of Nuclear Material Safety and Safeguards Dockets: 71-0102. 71-9036,71-905 71-9263 Distribution: 1 Dockets NRC File Center LCa n, EDO ,

PUBLIC HThompson. EDO JThoma EDO l NMSS R/F SFP0 R/F NMSS Di Jff R/F i SGagner. OPA LPortner. OCA RBlough, J BMallett. RII HMiller, RI NMamish No "

LReyes, RII EEaston, NMSS SBaggett. NM J RBangart. SP CPedersen RIII JJankovich. NM EMerschoff. RIV BWhite, NMSS JLieberman. OE i RChappell, NMSS DCool, MMSS PEng, NMSS RScarano. RIV DCollins. RII ABlough, RI CHaughney. NMSS LCamper. NMSS S0'Connor CPoland. NMSS N0sgood. NMSS DTiktinsky, NMSS Creamer. OGC W0lmstead. OGC JGoldberg. OGC WWard, NMSS

  • See previous concurrence. LMG/ PROOFED / JULY 23,1997 0FC *SFP0 C *SFP0 C *SFP0 C SFPO, C_ NMSS NAME TMatula/ TOM JJankovich SShankman WFKd CJPaperiello DATE 07/22/97 07/22/97 07/22/97 07/ D /97 07/ /97 Document Name: g:\0102ilb.ltr Last update: July 23. 1997

6 4

Mr. D. Dicharry i your July 1 1997, letter. The NRC requests that you inform us in writing when the

} independent dit is completed, and include the results of the audit and any follow up actions l you plan to tak garding findings identified in the audit.

If you have any que 'ons, please contact Mr. Thomas Matula of my staff at 301-415-8563.

Sincerely, Carl J. Paperiello, Director Office of Nuclear Material Safety and Safeguards Dockets: 71-0102, 71-9036, 71-9056, 71 9 3 Distribution:

Dockets NRC File Center LCall EDO

PUBLIC HThompson, EDO JThoma, DO NMSS R/F SFPO R/F NMSS Dir' R/F SGagner, OPA LPortner, OCA RBlough, RI BMallett, Ril HMiller, RI NMamish, NM LReyes, Ril EEaston, NMSS SBaggett, NMSS RBangart, SP CPedersen, Rlli JJankovich, NMSS EMerschoff, RIV BWhite, NMSS JLieberman, OE RChappell, NMSS DCool, MMSS PEng, NMSS RScarano, RIV DCollins, Ril ABlough, RI CHaughney, NMSS LCamper, NMSS SO'Connor

! CPoland, NMSS NOsgood, NMSS DTiktinsky, NMSS Creamer, OGC WOlmstead, OGC JGoldberg, OGC WWard, NMSS OFC SFPO C SFPOg nV C SEPO, f, C SFPO C NMSS NAME T bOM JJank ch h n WFKane CJPaperiello DATE 07/$97 07/ 7 07t/497 07/ 19 7 07/ /97 Document Name: g:\0102i1b.Itr

Last update: July 23,1997 j

.