Submits Withdrawal of Proposed Change to TS Rhrs Cross Tie Valve Position Testing for Plant.List of Commitments,Encl
ML20149H678
Person / Time
Site: Cooper 
Issue date: 07/21/1997
From: Graham P
NEBRASKA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NLS970141, NUDOCS 9707250122
Download: ML20149H678 (3)


Text

-

nikRW;: "a50%.a

.~

Nebraska Public Power District TM"

--=g==

--c.-,.n-.-.-a-.-

--.--.s w_=___-

NLS970141 July 21,1997 l

U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001

Subject:

Withdrawal of Proposed Change to Technical Specifications ResidvY 'leat Removal System Cross Tie Valve Position Testing Cooper Nuclear Station, NRC Docket 50-298, DPR-45

References:

1. Letter (NLS970115) to the USNRC from G. R. Horn (NPPD) dated May 30, 1997, " Proposed Change to Technical Specifications, Residual Heat Removal System Cross Tie Valve Position Testing, Cooper Nuclear Station, NRC Docket 50-298, DPR-46"
2. Letter (TAC No. M99068) to G. R. Horn (NPPD) from the US'NRC dated July 1,1997, " Cooper Nuclear Station - Correction of Typographical Error in Amendment No. 43, Issued April 11,1978" Gentlemen:

By lener dated May 30,1997, the Nebraska Public Power District (District) submitted a request to amend Facility Operating License No DPR-46 (Reference 1). The primary focus of the I'

proposed amendment was to revise Table 4.2.B of the Cooper Nuclear Station Technical

,[

Specifications (TS) to change the functional test frequency for item 14, Residual Heat Removal (RHR) Cross Tie Valve Position, from once per month to once per operating cyck As further justified below, the District is withdrawing this proposed TS change.

l Following a request by the NRC Project Manager for additional information regarding the proposed amendment, it was discovered that the requested change to Table 4.2 B had been previously approved as part of Amendment No. 32; however, as a result of an administrative oversight on the part of the District, the functional test frequency for Table 4.2.B item 14 was inadvertently changed back to monthly under Amendment No. 43, issued April 11,1978. This oversight, when brought to the Staft's attention, resulted in the issuance of a corrected TS page (Reference 2) showing the functional test frequency for Table 4.2.B item 14 as once per operating cycle, as originally approved in Amendment No. 32. Issuance of the corrected TS page abrogated the need for the proposed amendment submitted under Reference 1.

'9707250122 970721 quimismitini mliinritm rin llll@ll@llJl;lli glf,jlJllll PDR ADOCK 03000290 P

PDR bb b$$Ebbks

$Y N bW 5

E.

'N' (p. -

40...

NL,S970141

. July 21,1997 L-l Page 2 of 2 ?

In addition to the functional test fregnency change discussed above, the requested amendment

' included editorial changes to TS pages 55 and 71. Specifically, it was requested that identification

. number "RHR-LMS 8". be changed to "RHR-MO-20LMS (NFC contact)." Mnce the District is currently reassessing the need and alternate methods for accomplishing these editorial changes,

- the propos4d amendment is being withdrawn as opposed to being supplemented or revised.

Should you have any questions concerning this matter, please contact me.

Sincerely, phrw P, Di Graham

[

! Vice President of Nuclear Energy Iccm '

cc Regional Adininistrator USNRC - Region IV I

Senior Project Manager USNRC.- NRR Project Directorate IV-1 Senior Res? dent inspector USNRC - Cooper Nuc1 car Station Radioactive Materials Program Manager

. Nebraska Department of Health and Human Services Regulation and Licensure NPG Distribution a

~

e,

l ATTACHMENT 3 LIST OF NRC COFMITMENTS j

4 NLS970141 Correspondence No:__

i The following table identifies those actions comnitted to b'f the District in this document. Any other actiorts discussed in the subm12tal represent intended or planned actions by he District. They are described to the NRC for the NRC's informattor and are not regulatory commitments.

Please notify the Licensing Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory comreitments.