ML20149H639
| ML20149H639 | |
| Person / Time | |
|---|---|
| Issue date: | 02/16/1988 |
| From: | Jordan E Committee To Review Generic Requirements |
| To: | Bernero R, Martin T, Scinto J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I), NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS), NRC OFFICE OF THE GENERAL COUNSEL (OGC) |
| References | |
| REF-GTECI-A-40, REF-GTECI-SC, RTR-REGGD-01.100, RTR-REGGD-1.100, TASK-A-40, TASK-OR NUDOCS 8802220032 | |
| Download: ML20149H639 (2) | |
Text
p/* "*%,%
UNITED STATES
/
NUCLEAR REGULATORY COMMISSION j
,j WASHINGTON, D. C. 20555 e
- e/
February 16, 1988 HEMORANDUM FOR:
Robart M. Bernero, NHSS Thomas T. Martin, RI Denwood F. Ross, RES Joseph Scinto, OGC James H. Sniezek, NRR FR0li:
Edward L. Jordan, Chairman Committee to Review Generic Requirements
SUBJECT:
CRGR MEETING NO. 129 The Committee to Review Generic Requirements (CRGR) will meet in the afternoon on Tuesday, February 23, 1988, in Room 6507 MNBB.
The agenda is as follows:
4 1-2 p.m.
G. Arlotto will present for CRGR review proposed final Regulatory Guide 1.100, Revision 2, "Seismic Qualification of Electric and Mechanical Equipment for Nuclear Power Plants." (Review package previously distributed.
Clean copy of Reg. Guide enclosed.)
2-3 p.m.
C.E. Rossi will present for CRGR review a proposed NRC Bulletin on "Inadequate Latch Engagement in GE HFA Type Latching Relays."
(Review package is enclosed.)
3-4 p.m.
L. Shao will present for CRGR review a proposed Generic Letter on "Boric Acid Corrosion of Carbon Steel Reactor Vessel Compon-ents in PWR Plants." (Review package is enclosed.)
NOTE:
CRGR review of the proposed resolution for USI A-40, "Seismic Design,"
previously scheduled for review at this meeting, has been postponed at the request of the sponsoring office.
That item has now been tentatively rescheduled to Meeting 130; CRGR members should retain the review packages already distributed for that item.
If a CRGR member cannot attend the meeting, it is his responsibility to assure that an alternate, who is approved by the CRGR Chairman, attends the meeting.
Persons making presentations to the CRGR are responsible for (1) assuring that the information required for CRGR review is provided to the Committee (CRGR Charter - IV.B), (2) coordinating and presenting views of other offices, (3) as appropriate, assuring that other offices are represented during the presenta-tion, and (4) assuring that, agenda modifications are coordinated with the CRGR contact (J. Conran X29855) and others involved with the presentation.
Division Directors or higher management should attend meetings addressing agenda items under their purview.
8802220032 800216 PDR REVQP NRCCRGR MEETING-129 PDR
h
.g.
In accordance with the ED0's March 29, 1984 memorandum to the Commission con-cerning "Forwarding of CRGR Documents to the Public Document Room (PDR)," the enclosure, which contains predecisional information, will not be released to the PDR until the NRC has considered (in a public forum) or decided the matter addressed by the information.
Original Signed 4 LC:)wdem Edward L. Jordan, Chairman Committee to Review Generic Requirements
Enclosures:
As stated cc w/ enclosures:
SECY V. Stello, Jr.
I cc w/o enclosures:
Commission (5)
J. Lieberman S. Ebneter W. Mcdonald Regional Administrators W. Parler G. Arlotto Distribution:
E. Jordan J. Heltemes J. Conran i
C. Sakenas R. Fraley
- 8. Doolittle (w/o enc.)
CRGR SF S. Treby (w/o enc.)
T. Rahm (w/o ent.)
J. Johnson, OEDO (POR (NRC/CRGR);(w/o enc.).
Central File (w/o enc.)
1 1
i
)
0FC sr-NAME$Conran(:cg. %....:.. AE00:k....:. C/C R A 00 :
i I
- CJH mes :
t3 r an DATE $
2/s2/88 2/i%f88 2//3hB8
.