'o,,

UNITED STATES 8

NUCLEAR REGULATORY COMMISSION c.

h u$

WASHINGTON. D. C. 20S55

%4.....$

LOUISIANA POWER AND LIGHT COMPANY DOCKET N0. 50-382 WATERFORD STEAM ELECTRIC STATION, UNIT 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 28 License No. NPF-38 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Louisiana Power and Light Company (the licensee) dated August 28, 1987, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; 0.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

p ADOCK 05000302 PDR

. 2.

Accordingly, the license is amended by. changes to the Technical Specifications as inoicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No.

NPF-38 is hereby amended to read as follows:

(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 28, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION C,' laIW Jose A. Calvo, Director e

Project Directorate - IV Division of Reactor Projects - III, IV, V and Special Projects Office nf Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance: February 9,1988

28 ATTACHMENT TO LICENSE AMENDMENT NO.

TO FACILIlY OPERATING LICENSE NO. NPF-38 DOCKET N0. 50-382 Replace the following pages of the Appendix A Technical Specifications with the attached pages.

The revised pages are identified by Amendment number and contain vertical lines indicating the areas of change.

The corresponding overleaf pages are also provided to maintain document completeness.

Remove Insert 3/4 7-32 3/4 7-32 3/4 7-33 3/4 7-33

)

l I

PLANT SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) 4.7.10.1.3 Each fire pump diesel starting 12-volt battery bank and charger shall be demonstrated OPERABLE:

a.

At least once per 7 days by verifying that:

1.

The electrolyte level of each battery is above the plates, and 2.

The overall battery voltage is greater than or equal to 12 volts.

b.

At least once per 92 days by verifying that the specific gravity is appropriate for continued service of the battery.

c.

At least once per 18 months by verifying that:

1.

The batteries and battery racks show no visual indication of physical damage or abnormal deterioration, and 2.

The battery-to-battery and termint.1 connections are clean, tight, free of corrosion, and coated with anticorrosion material.

l l

1 WATERFORD - UNIT 3 3/4 7-31 AMENOMENT NO. 8

PLANT SYSTEMS SPRAY AND/0R SPRINKLER SYSTEMS LIMITING CONDITION FOR OPERATION 3.7.10.2 The following spray and/or sprinkler systems shall be OPERABLE:

53rinkler No.

Bldg./Elev.

Location F )M-1 RCB Reactor Coolant Pumps 1A, 1B FPM-2 RCB Reactor Coolant Pump 2A, 28 FPM-3A RAB +21, +46 Diesel Generator Area A, Feed Tank Room A FPM-4B RAB +21, +46 Diesel Generator Area B, Feed Tank Room B FPM-11A RAB -35 Emergency D/G Fuel Oil Tank A FPM-12B RAB -35 Emergency D/G Fuel Oil Tank B FPM-16 FWPH +15 Fire Water Pump House FPM-17 RAB +35 Cable Vault Area FPM-18 RAB +35 Electrical Penetration Area 1 FPM-19 RAB +35 Electrical Penetration Area 2 FPM-22 RAB -4 Corridor and Blowdown Tank Rooms FPM-23 RAB -35 Corridor, Shutdown Heat Exchanger Rooms, EFW Pump Room FPM-24 RAB +21 Corridors, CCW Area FPM-25B RAB +21 North High Voltage Switchgear Room FPM-26 RAB +46 Ventilation Equipment Rooms FPM-27 RAB +7 HVAC Rooms FPM-28 RAB -35 Auxiliary Component Cooling Water Pump Rooms FPM-29 RAB +35 Relay Room, Corridor FPM-30A RAB +21 South High Voltage Switchgear Room FPM-33 RAB +46 E-17(3A-SA) Shield Building Ventilation System Filter, Train A Charcoal Adsorber FPM-34 RAB +46 E-17(3B-SB) Shield Building Ventilation System Filter, Train B Charcoal Adsorber FPM-36 RAB +46 E-23(3A-SA) Controlled Ventilation Area System Filter, Train A Charcoal Adsorber FPM-37 RAB +46 E-23(3B-SB) Controlled Ventilation Area System Filter, Train B Charcoal Adsorber APPLICABILITY:

Whenever equipment protected by the spray / sprinkler system is required to be OPERABLE.

ACTION:

a.

With one or more of the above required spray and/or sprinkler systems inoperable, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> establish a continuous fire watch with backup fire suppression equipment for those areas in which redundant systems or components could be damaged unless the spray and/or sprinkler system (s) is located inside the containment, then inspect that containment area at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or monitor air temperature at least once per hour at the locations listed in Specifi-cation 4.6.1.5; for other areas, establish an hourly fire watch patrol.

b.

The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.

WATERFORD - UNIT 3 3/4 7-32 Amendment No. 28

PLANT SYSTEMS SURVEILLANCE REQUIREMENTS 4.7.10.2 Each of the above required spray and/or sprinkler systems shall be demonstrated OPERABLE:

a.

At least once per 31 days by verifying that each valve (manual, power-operated, or automatic) in the flow path that is not locked, sealed, or otherwise secured in position is in its correct position.

b.

At least once per 12 months by cycling each testable valve in the flow path through at least one complete cycle of full travel.

c.

At least once per 18 months:

1.

By performing a syste:a functional test which includes simulated automatic actuation of the system, and:

a)

Verifying that the automatic valves in the flow path actuate to their correct positions on a thermal /preaction test signal, and b)

Cycling each valve in the flow rath that is not testable during plant operation through at least one complete cycle of full travel.

2.

By a visual inspection of the dry pipe spray and sprinkler headers to verify their integrity, and 3.

By a visual inspection of each nozzle's spray area to verify the spray pattern is not obstructed.

d.

At least once per 3 years by performing an air flow test through each open head spray and sprinkler header

  • system listed in Section 3.7.10.2 and verifying the spray nozzles are unobstructed.

l

  • In lieu of an air flow test, the charcoal filter system spray nozzles need only be visually inspected and verified to be unobstructed each time the charcoal is changed.

WATERFORD - UNIT 3 3/4 7-33 Amendment No. 28 i

PLANT SYSTEMS HALON SYSTEMS l

i LIMITING CONDITION FOR OPERATION l

3.7.10.3 The computer room Halon system shall be OPERABLE.

APPLICABILITY: Whenever equipment protected by the Halon system is required to be OPERABLE.

ACTION:

a.

With the above required Halon system inoperable, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> establish an hourly fire watch patrol.

b.

The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.

SURVEILLANCE REQUIREMENTS 4.7.10.3 The above required Halon system shall be demonstrated OPERABLE:

a.

At least once per 31 days by verifying that each valve (minual, power-operated, or automatic) in the flow path is in its correct position.

b.

At least once per 6 months by verifying Halon storage tank weight to be at least 95% of full charge weight (level) and pressure to be at least 90% of full charge pressure, c.

At least once per 18 months by verifying:

1.

The system, including associated ventilation dampers and fire door release mechanisms, actuates manually and automatically, upon receipt of a simulated test signal, and 2.

Performance of a flow test through headers and nozzles to assure no blockage.

l WATERFORD - UNIT 3 3/4 7-34

-