>R Moo UNITED STATES NUCLEAR REGULATORY COMMISSION q
rj j
REGloN IV o
611 RYAN PLAZA DRIVE, SUITE 400 f
AR LINGTON, TEXAS 76011-8064 November 8, 1994 Dockets:
50-445 50-446 Licenses:
NPF-87 NPF-89 TU Electric ATTN:
C. L. Terry, Group Vice President Nuclear Production Skyway Tower 400 North Olive Street, L.B. 81 Dallas, Texas 75201
SUBJECT:
CLOSURE OF INVESTIGATION CASE NO. 4-93-035R This is in reference to an investigation conducted by the NRC's Office of Investigations (01) of the circumstances surrounding a May 15, 1993, event at
.the Comanche Peak Steam Electric Station (CPSES).
The event involved exceeding an administrative limit for increasing power during a power ascension on that date.
TV Electric promptly informed the NRC of the event, conducted its own review and took disciplinary action against the involved licensed operating personnel.
The investigation was conducted to determine whether licensed operators on shift at the time of the event knew that they had exceeded the administrative limit for increasing power and whether they had attempted to conceal that fact from TU Electric personnel.
The investigation did not develop evidence to support these suspicions.
The investigation is closed and no further action is planned with respect to the investigative conclusions.
However, as stated in NRC inspection report 50-445/93-19; 50-446/93-19, issued on June 14, 1993, the issues surrounding this event were left as an unresolved item. The event was also discussed during a management meeting between URC and TV Electric on July 7, 1993. The NRC will now complete its review of the event to determine whether any violations of NRC requirements occurred and will inform TU Electric of the results of that review in a future inspection report.
Please contact us should you have any questions about this matter.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter will be placed in the NRC's Public Document Room.
Sincerely, h) W 1 W A. B. Beach, Director Division of Reactor Projects 94112201g1 941108 gDR ADOCK 05000445
}
[
TU Electric cc:
l TV Electric ATTN:
Rcger D. Walke~r, Manager of Regulatory Affairs for Nuclear Engineering Organization Skyway Tower 400 North Olive Street, L.B. 81 Dallas, Texas 75201 Juanita Ellis President - CASE 1426 South Polk Street Dallas, Texas 75224 GDS Associates, Inc.
Suite 720 1850 Parkway Place Marietta, Georgia 30067-8237 TU Electric Bethesda Licensing 3 Metro Center, Suite 610 Bethesda, Maryland 20814 Jorden, Schulte, and Burchette i
ATTN: William A. Burchette, Esq.
Counsel for Tex-La Electric Cooperative of Texas 1025 Thomas Jefferson St., N.W.
Washington, D.C.
20007 Newman & Holtzinger, P.C.
ATTN: Jack R. Newman, Esq.
1615 L. Street, N.W.
Suite 1000 Washington, D.C.
20036 Texas Department of Licensing & Regulation ATTN:
G. R. Bynog, Program Manager /
Chief Inspector Boiler Division P.O. Box 12157, Capitol Station Austin, Texas 78711 Honorable Dale McPherson i
County Judge P.O. Box 851 Glen Rose, Texas 76043 4
i i
d TV Electric Texas Radiation Control Program Director 1100 West 49th Street Austin, Texas 78756 Office of the Governor ATTN:
Susan Rieff, Director
]
Environmental Policy i
P.O. Box 12428 Austin, Texas 78711
TU Electric E-Mail report to D. Sullivan (DJS) bcc distrib. by RIV:
L. J. Callan Resident Inspector (2)
Branch Chief (DRP/B)
Leah Tremper, OC/LFDCB, MS: MNBB 4503 MIS System DRSS-FIPB RIV File Project Engineer (DRP/B)
Branch Chief (DRP/TSS)
RWise DMB-IE01 GSanborn LWilliamson, 01 JLieberman OE TPGwynn i
., s /
3I EO 5/k D:DRS[.\\
C:DRP/B l
D:DRP GS ntiorI TPGwvprN DChamberl a i n hBBeachIf j
10/h/94 lIf///94 10/5/94 0/
,94 G:\\EA\\0I493035.GF5
- -