ML20149H418

From kanterella
Jump to navigation Jump to search
Informs That Written & Operating Exams Scheduled for Wk of 950320 & That Util Should Submit Ref Matls Identified in Encl Attachment of ES-201 by 951219.W/o Encl
ML20149H418
Person / Time
Site: Quad Cities  
Issue date: 11/16/1994
From: Ring M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kraft E
COMMONWEALTH EDISON CO.
References
NUDOCS 9411220177
Download: ML20149H418 (3)


Text

_

t<

November 16, 1994 Commonwealth Edison Company ATTN: Mr. E. Kraft Site Vice President Quad Cities Nuclear Power Station 22712 206th Avenue North Cordova, IL 61242

Dear Mr. Kraft:

In a telephone conversation between Mr. Ken Morland, ILT Coordinator, and Mr. Roger Doornbos, Principal Examiner, arrangements were made for the administration of licensing examinations at the Quad Cities Nuclear Power Station.

The written and operating examinations are scheduled for the week of March 20, 1995.

Your staff will be given an opportunity to review the licensing examinations in accordance with the guidelines in Revision 7 of NUREG-1021, " Operator Licensing Examiner Standards," (ES-201, Attachment 4) during the week of March 6, 1995.

To prepare the examinations and meet the above schedule, it will be necessary for your staff to furnish the reference materials identified in Attachment 2 of ES-201 by December 19, 1995. Any delay in receiving approved and indexed reference material or the submittal of inadequate or incomplete reference material may result in the examinations being rescheduled.

The NRC will prepare and administer the written examinations in accordance with ES-401 and ES-402 of NUREG-1021.

In order to conduct the requested examinations, it will be necessary for your staff to provide adequate space and accommodations on the date noted above.

The NRC's guidelines for administering the written examinations are described in ES-402, Attachmelt 1.

The NRC will prepare and administer the operating tests in accordance with ES-301 and ES-302 of NUREG-1021.

In order to conduct the requested operating tests, it will be necessary for your staff to make the simulation facility available on the dates noted above.

Your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

ES-402, Attachment 2, and ES-302 Attachment 1, contain a number of NRC policies and guidelines that will be in effect while the written examination and operating tests are being administered.

O 9411220177 941116 PDR ADOCK 05000254 L/3bl& WbY}

1 E. Kraft 2

November 16, 1994 Your staff should submit preliminary reactor operator and senior reactor operator license applications and waiver requests at least 30 days before the first examination date so that the NRC will be able to review the applications I

and the medical certifications and evaluate any requested waivers.

If the applications are not received at least 30 days before the examination date, a postponement may be necessary.

Final, signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This request is covered by Office of Management and Budget (0MB) Clearance Number 3150-0101, which expires October 31, 1995. The estimated average l

burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response, including gathering, copying and mailing the required material.

Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Information and Records Management Branch, Mail Stop T-6 F33, Office of Information Resources Management, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555; and to the Paperwork Reduction Project (3150-0101), Office of Information and Regulatory Affairs, NE0B-10202, Office of Management and Budget, Washington, D.C.

20503.

Thank you for your cooperation in this matter.

Mr. Morland has been advised of the policies and guidelines referenced in this letter.

If yoe have any questions regarding the NRC's examination procedures and guidelines, please contact Roger L. Doornbos at (708) 829-9716.

Sincerely,

/s/ Mark A. Ring i

Mark A. Ring, Chief Operations Branch Docket No. 50-254 1

Docket No. 50-265 Distribution:

See Attached list

{"<"I.S.MO ";,$_

4.

.. c - c.,,........<,,f.. i 1. c.,,

....,. t i.,% f..c i

-n 0FFICE RIII:DRS N

RIII:DRS N

RIII:DRS M

Doornbos:c k Jordan??~NIU3 Ring T rI NAME DATE 11//6/94 11/b/94 11/4/94 0FFICIAL RECORD COPY

s Distribution:

Letter to E. Kraft. Dated: November 16, 1994 cc:

J. C. Brons, Vice President Nuclear Support J. S. Perry, Vice President BWR Operations G. Campbell, Station Manager N. Chrissotimos, Regulatory Assurance Supervisor D. Farrar, Nuclear Regulatory Services Manager Richard Hubbard Nathan Schloss, Economist Office of the Attorney General State liaison Officer Chairman, Illinois Commerce Commission S. Shelton, Vice President Electric Operation, IA-IL Gas and Electric A. J. Chernick, Plant Training Manager Distribution:

Docket File RI, Quad Cities, PUBLIC IE-01 Dresden, LaSalle OC/LFDCB T. O. Martin, RIII DRP RIII PRR C. P. Patel, Project Manager, NRR S. A. Richards, Branch Chief, OLB P. L. Hiland, Section Chief, DRP