Forwards Insp Repts 50-317/94-31 & 50-318/94-30 on 941003-07.No Violations Noted
ML20149H378
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 11/14/1994
From: Ruland W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Denton R
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML20149H382 List:
References
NUDOCS 9411220154
Download: ML20149H378 (3)


See also: IR 05000317/1994031

Text

. . - .

-

- ._

.

. _ .

_.

-

-

-

--

](

,1

s.

'

November 14, 1994

.

Mr. Robert E. Denton

Vice President - Nuclear Energy

Baltimore Gas and Electric Company

Calvert Cliffs Nuclear Power Plant

1650 Calvert Cliffs Parkway

Lusby, Maryland 20657 - 4702

SUBJECT: COMBINED INSPECTION REPORT NOS. 50-317/94-31 AND 50-318/94-30

Dear Mr. Denton:

This letter transmits the report of the announced inspection conducted by

Mr. L. Scholl of this office from October 3-7, 1994, at the Calvert Cliffs

Nuclear Power Plant, Units 1 and 2, in Lusby, Maryland.

The inspection

included a review of activities authorized for your Calvert Cliffs facility.

The inspector discussed the results of the inspection with Mr. P. Chabot and

other members of your staff at the conclusion of the inspection on

October 7, 1994.

This inspection was directed toward assessment of areas important to the

public health and safety. Areas examined during this inspection were

activities related to the engineering and technical support provided for the

operation of the Calvert Cliffs plants. Within these areas, the inspection

consisted of selected examinations of procedures and representative records,

interviews with personnel, and observations by the inspector.

The inspector found that plant modifications and safety evaluations were

generally of good quality. The engineering work backlog is closely monitored

and efforts to reduce the backlog have been effective. Management support of

initiatives to improve the engineering processes and products was evident in

several areas. Overall, the inspector concluded that the plant engineering

and nuclear engineering departments were providing good engineering and

technical support for the operation of the facility.

Details on the areas examined during the inspection are described in the

enclosed NRC Region I inspection report.

9411220154 941114

PDR

ADOCK 05000317

0

PDR

I

-

n.

November 14, 1994

.

Mr. Robert E. Denton

2

No reply to this letter is required.

Your cooperation in this matter is

appreciated.

If you have any questions, please call me at (610) 337-5376.

Sincerely,

William H. Ruland, Chief

Electrical Section

Division of Reactor Safety

Docket Nos. 50-317

50-318

Enclosure: Combined Inspection Report Nos. 50-317/94-31

and 50-318/94-30 w/ Attachment

cc w/ encl:

G. Detter, Director, Nuclear Regulatory Matters (CCNPP)

R. McLean, Administrator, Nuclear Evaluations

J. Walter, Engineering Divie, ion, Public Service Commission of Maryland

K. Burger, Esquire, MarylanJ People's Counsel

R. Ochs, Maryland Safe Energy Coalition

State of Maryland (2)

Distribution w/ encl:

J. Wiggins, DRS

.

'

K. Abraham, PA0 (23) SALP Reports and (2) All Inspection Reports

PUBLIC

'

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Region I Docket Room (with concurrences)

DRS Files (2)

-

- -

- - -

- -

'

..

November 14, 1994

.

Mr. Robert E. Denton

3

Distribution w/ enc 1:

(VIA E-MAIL)

W. Dean, OED0 (WMD)

P. Wilson - Calvert Cliffs

T. Marsh, NRR

D. Mcdonald, NRR

l

,

l

!

DOCUMENT NAME: A: CC943130. INS

To receive a copy of this docurnent, indicate in the box: 'C" = Copy virhout attachment / enclosure

"E' = Copy with attachment / enclosure T = No copy

/ 6 / lE RI/

l

RI/

l

RI/

l

f

0FFICE

RI/DRS

lG

RI/DRS,

NAME

Scholl " "" h

RulandV@f'

DATE

11/14/94

11////94

11/

/94

11/

/94

11/

/94

0FFICIAL RECORD COPY

,

i

l

l

)

\\

-