, U. w,
l g G4
.[
t UNITED STATES
- g j
NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20665-0001
[
o f, #
July 22, 1997 he-N N
Mr. Nicholas J. Liparulo, Manager Equipment Design and Regulatory Engineering Wastinghouse Electric Corporation P.O. Box 355 Pittsburgh, PA 15230-0355
SUBJECT:
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE JOSEFH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2
Dear Mr. Liparulo:
By ktter dated June 20, 1997, Southern Nuclear Operating Company submitted Westinghouse Owners Group technical reports WCAP-12271, Revision 1,
"Wastinghouse Revised Thermal Design Procedure Instrument Uncertainty Methodology for Alabama Power Farley Nuclear Plant Units 1 and 2 (Uprating to 2785 MWT NSSS Power)," for NRC review and approval.
By your application dated June 16, 1997 (CAW-97-1119), and affidavit dated June 16, 1997, executed by Henry A. Sepp, Westinghouse Electric Corporation, you requested that the technical reports be withheld from public disclosure pursuant to 10 CFR 2.790.
A copy of Westinghouse's nonproprietary version was also submitted (WCAP-12272, Revision 1, Non-Proprietary Class 3) for placement in the NRC's Public Document Room.
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
1.
The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by eny of Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies.
2.
The information used by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similcr product.
i We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.790 and, on the basis of Westinghouse's statements, have determined that the submitted information sought to be withheld contains proprietary commercial information.
0 o
l 9707240352 970722 PDR ADOCK 05000348 NRC FILE CENTER COPY
~C.~
a
?Mr. Nicholas J. "Liparulo July 22, 1997-L
. Therefore, the versions offthe submitted:information marked 'as proprietary i.
- will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, 'as amended.
1 Withholding from public inspection shall-not affect the right, if any,.of
.i persons properly and directly concerned to inspect t'.e documents.
If the need i
arises, we may send copies of this information to our consultants workin9 in 1
this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should
.i change in the. future such that the information could then be made available 1
for public inspection,' you should promptly notify the NRC.
You also should understand that the NRC may have cause to review this determination in the future, for example,-.if the scope of a Freedom of. Information Act request includes your information.
In all review situations, if the NRC makes a determination adverse to the above, you will be' notified in advance of any public' disclosure.
Sincerely, ORIGINAL SIGNED BY:
Jacob I. Zimmerman, Project Manager i
Project Directorate 11-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket Nos. 50-348 and 50-364 cc: See next page DISTRIBUTION Docket Fi!c PUBLIC.
PDII-2 Resding BBoger HBerkow JZimmerman LBerry-MPSiemien, 0GC.
JJohnson, RII PSkinner, RII nA 0FFICE PDII-2/PMe, PDII-2/Lh bN PDII-2k OGC
)
NAME J.
N:cn L. BERRY N M.P.SIEMIEN H.BERkOW!
DATE f/ Y /97
/ 9 /97 D/ lO 97' 9/Al /97
/
DOCUMENT NAME: G:\\FARLEY\\M98120. WIT OFFICIAL RECORD COPY
ti.
l T
Mr. Nicholas J. Liparulo Therefore, the versions of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of i
persons properly and directly concerned to inspect the documents.
If the need arises, we may send copies of this information to our cons'iltants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC.
You also should understand that the NRC may have cause to review this determination in the 1
future, for example, if the scope of a Freedom of Information Act request includes your information.
In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
4 Sincerely, j
=
JfcobI.
erman, Project Manager Project Directorate II-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket Nos. 50-348 and 50-364 cc:
See next page i
I
~
. = _..
Southern Nuclear Operating Joseph M. Farley Nuclear Plant Company, Inc.
cc:
Mr. R. D. Hill, Jr.
General Manager -
Southern Nuclear Operating Company Post Office Box 470 Ashford, Alabama 36312 Mr. Mark Ajiuni, Licensing Manager Southern Nuclear Operating Company Post Office Box 1295 Birmingham, Alabama 35201-1295 Mr. M. Stanford Blanton Balch and Bingham Law Firm Post Office Box 306 1710 Sixth Avenue North-Birmingham, Alabama 35201 Mr. J. D. Woodard Executive Vice President i
Southern Nuclear Operating Company Post Office Box 1295 Birmingham, Alabama 35201 State Health Officer Alabama Department of Public Health 434 Monroe Street Montgomery, Alabama 36130-1701 Chairman Houston County Commission Post Office Box 6406 Dothan, Alabama 36302 Regional Administrator, Region II U.S. Nuclear Regulatory Commission Atlanta Federal Center 61 Forsyth Street, S.',.,
Suite 23T85 Atlanta, Georgia 30303 Resident Inspector U.S. Nuclear Regulatory Commission 7388 N. State Highway 95 Columbia, Alabama 36319 Mr. D. N. Morey Vice President - Farley Project Southern Nuclear Operating Company Post Office Box 1295 Birmingham, Alabama 35201-1295