Informs That NRC Completed Licensing Action for GL 96-01, Testing of Safety-Related Logic Circuits, . Submittals & 970417 Provided Info Requested
ML20149H256
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 07/11/1997
From: Le N
NRC (Affiliation Not Assigned)
To: Summer H
SOUTHERN NUCLEAR OPERATING CO.
References
GL-96-01, GL-96-1, TAC-M94684, TAC-M94685, NUDOCS 9707240298
Download: ML20149H256 (4)


Text

_.. _ _ _ -. -. _ _. _.. -

. ~ ~

    • O

'.s.

AMEi s

j-NUCLEAR REGULATORY COMMISSION ((/d2] fffyd

.p t

UNITED STATES 2

WASHINGTON, D.C. *amaa aang

' July 11, 1997 Mr. H. L. Sumner,'Jr.

Vice President Southern Nuclear Operating Company, Inc.

4 Post Offic.e Box 1295 Birmingham, Alabama 35201-1295'-

SUBJECT:

COMPLETION OF LICENSING ACTION FOR GENERIC LETTER 96-01, " TESTING 0F SAFETY-RELATED LOGIC CIRCUITS," DATED JANUARY 10, 1996 -

EDWIN I. HATCH NUCLEAR _ POWER PLANT, UNITS 1.AND 2 (TAC NOS. M94684-AND M94685)

~

Dear'Mr. Sumner:

.0n January 10, 1996, the U.S. Nuclear Regulatory Commission (NRC) issued Generic Letter (GL) 96-01, " Testing of Safety-Related Logic Circuits," to all

. holders of operating licenses or construction permits. The NRC issued GL 96-01 for three principal reasons:

1.

Notify addressees about problems with testing of safety-related logic circuits; 2.

Request that all addressees implement the actions described within the generic letter; and 3.

Require that all addressees submit to the NRC a written response regarding

' implementation of the requested actions.

In GL;96-01, the NRC' staff specifically requested that licensees take t'he

~

following actions:

1.

Compare electrical. schematics and logic diagrams for the reactor protection system,' emergency diesel generator load-shedding and g

sequencing, and actuation logic for. the engineered safety feature systems s)4\\

0 against plant surveillance test )rocedures.to ensure that all portions of

\\

the logic circuitry, including tie parallel logic, interlocks, bypasses, and inhibit. circuits, are adequately covered in the surveillance

. procedures to fulfill the technical specification requirements. This.

g review should also include relay contacts, control switches, and other relevant electrical components within these systems, utilized in the logic g

circuits performing a safety function; and 2.

Modify the' surveillance procedures as necessary for complete testing to comply with the technical specifications. Additionally, the licensee may request an amendment to the technical specifications if relief from certain testing requirements can be justified.

g oo11 x

97072 7h b 5"

^

NRC FB.E CENTER COPY

a.s s Mr. H. L. Sumner, Jr. July 11, 1997 1.

A written response indicating whether or not the licensee would implement the actions requested above or. propose an alternative action; 2.

~A schedule for completing'the requested actions or proposed alternative; j.

and I

-3.

A response ~ confirming completion of the requested actions.

In response to GL 96-01, you provided letters dated April 12, 1996. and April.17, 1997, for the Edwin I. Hatch Nuclear Plant, Units 1 and 2.

These-submittals provided both the information requested and the responses required by GL 96-01; therefore, TAC Nos. M94684 and M94685 are closed.

If you have any~ questions regarding-this matter, please contact me at 301-415-1458.

Sincerely, ORIGINAL SIGNED BY:

Ngoc B. (Tommy) Le, Project Manager Project Directorate II-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket Nos. 50-321 and 50-366 cc w/ encl:

See next page DISTRIBUTION:

Docket File H. Garg, NRR PUBLIC ACRS PD 11-2 Rdg.

PSkinner, RII BBoger HBerkow NLe LBerry JJohnson, RII OGC DOCUMENT NAME: G:\\ HATCH \\ HAT 9601.CLS I

' To tceive a copy of thle document. Indicate in the box: "C" = Copy without enclosures "E" = Copy with enclosures "N* = No copy 0FFICE' PDII-2:PM r l PDII-2:LA \\1u p HICB:NRR.,.

PDII-2:PD,, _,

NAME NLE:cn 4db LBERRY NA/

HGARG //W

  • HBERK0W (Ti l A i DATE 4 / q /97

/\\/ % /97 '

\\

7 / ///97 "7 /() /97 ll 0FFICIAL RECORD COPY

!=

l l-Mr. H. L. Sumner, Jr. July 11, 1997

. Furthermore, the NRC staff required that addressees prepare and submit the l

following:-

1.

A' written response indicating whether or not the licensee would implement the actions requested above or propose an alternative action; 2.

A schedule for completing the requested actions or proposed alternative; l

and-

3..A response confirming completion of the requested actions, j

In response to GL 96-01, you provided letters dated April 12, 1996, and l

April 17, 1997, for the Edwin I. Hatch Nuclear Plant, Units 1 and 2.

These submittals provided both the information requested and the responses required l

by GL 96-01; therefore, TAC Nos. M94684 and M94685 are closed.

If you.have any questions regarding this matter, please contact me at 301-415-1458.

l Sincerely, Lt Ngoc B. (Tommy) Le, Project Manager-Project Directorate II-2 l

Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation l

Docket Nos. 50-321 and 50-366

[.

cc w/ encl: See next page i

1 aw-

l

~~

l L

Edwin I. Hatch Nuclear Plant Units 1.and 2 cc:

Mr. Ernest L. Blake, Jr.

Charles A. Patrizia, Esquire l

Shaw, Pittman, Potts and Trowbridge Paul,'Hastings, Janofsky & Walker 2300 N Street, NW.

10th Floor Washington, DC 20037 1299 Pennsylvania Avenue Washington, DC 20004-9500 Mr. D. M. Crowe Manager, Licensing Chairman Southern Nuclear Operating Appling County Commissioners Company, Inc.

County Courthouse P. O. Box 1295 Baxley, Georgia 31513 j

Birmingham,' Alabama 35201-1295 Mr. W. G. Harriston, III t

l Resident Inspector President and Chief Executive

.U.S. Nuclear Regulatory Commission Officer 11030 Hatch Parkway North Southern Nuclear Operating 1

Baxley, Georgia 31513 Company, Inc.

P. O. Box 1295 l

Regional Administrator, Region II Birmingham, Alabama 35201-1295 U.S. Nuclear Regulatory Commission Atlanta Federal Center Mr. J. D. Woodard l

61 Forsyth Street, S.W., Suite 23T85 Executive Vice President Atlanta, Georgia 30303 Southern Nuclear Operating i

Company, Inc.

Mr. Charles H. Badger P. O. Box 1295 Office of Planning and Budget Birmingham, Alabama 35201-1295 Room 610.

270 Washington Street, SW.

Mr. P. W. Wells Atlanta, Georgia 30334

' General Manager, Edwin I. Hatch Nuclear Plant Harold Reheis, Director Southern Nuclear Operating l

Department of Natural Resources Company, Inc.

l 205 Butler. Street, SE., Suite 1252 P. O. Box 439 Atlanta, Georgia 30334 Baxley, Georgia 31513 Steven M. Jackson Senior Engineer - Power Supply Municipal Electric Authority i

l of Georgia 1470 Riveredge Parkway, NW t

' Atlanta, Georgia 30328-4684 l

)

9 L

i

!-