Forwards Rev 0 to Toledo Edison Co Davis-Besse Unit 1 Cycle 10 COLR & Rev 1 to BAW-2223, Davis-Besse Nuclear Power Station Unit 1,Cycle 10 - Reload Rept
ML20149H135
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 11/11/1994
From: Stetz J
CENTERIOR ENERGY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20149H138 List:
References
2260, NUDOCS 9411180060
Download: ML20149H135 (1)


Text

__

i

- GNTERf0R b

ENENCY 300 Madison Avenue N'"

Toledo, OH 43652-0001 Vice President. Nuclear l

419-249-2300 Davis-Besse Docket Number 50-346 License Number NPF-3

~

Serial Number 2260 November 11, 1994 i

t i

United States Nuclear Regulatory Commission Document Control Desk t

Vashington, D.C. 20555 Subj ect:

Core Operating Limits Report and Reload Report for Cycle 10 i

Gentlemen:

j Enclosed is a copy of the Davis-T> esse Nuclear Power Station, Unit 1 (DBNPS) Core Operating Limits Report (COLR) for Cycle 10 operation (Enclosure I).

The COLR is being submitted in accordance with DBNPS Technical Specification 6.9.1.7.

In addition, an information only copy of the DBNPS Cycle 10 Reload Report is provided as Enclosure II.

If you have any questions, please contact Mr. V. T. O'Connor, Manager -

l Regulatory Affairs, at (419) 249-2366.

Very truly yours, k'

MKL/laj Enclosures cc:

L. L. Gundrum, DB-1 NRC/NRR Project Manager J. B. Martin, Regional Administrator, NRC Region III S. Stasek, DB-1 NRC Senior Resident Inspector Utility Radiological Safety Board 73

- i U b.,:

Operating Companies Cleveiond Electne muminating

g i

Toledo Edison 9411180060 941111 g

PDR ADOCK 05000346 P