GENuclear Energy l
$C 781 SanJose, CA 95125-1014
. Adva Lt s
5
.te 408 9254948(phone) 4089251193(bcsmile)
November 7,1994 MFN No.144-94 Docket STN 524)04 Document Control Desk U. S. Nuclear Regulatory Commission i
Washington DC 20555 Attention:
Richard W. Ilorchardt, Director f
Standardization Project Directorate-
Subject:
Transmittal of copy ofJAEG'4101-1990, Guide for Quality Assurance of Nuclear Power Plants
References:
1.
Letter, M. Malloy (NRC) to P. W. Marriott (GE), IU? QUESTS K)R ADDITIONAL INFORh1ATION REGARDING ' THE TEST PROGRAh! FOR THE GE NUCLEAR ENERGY (GE) SinfP11FIED BOILING WATER REACTOR (SBWR) (Q900.82-Q900.95), dated September 16,1994.
2.
Letter, T. R. McIntyre (GE) to R. W. Borchardt (NRC), Same Subject, dated September 26,1994.
The enclosure to this letter contains a copy ofJAEG 4101-1990 which was referenced l
in the response to Requests for Additional Information. (RAls) 900.67 which "as transmitted earlier by Reference 2. This standard will be applied to the GIRAFFE helium tests as a part of the SBWR certification program.
Sincerely, l
{
) P. W. Marriott, Manager
/
Advanced Plant Technologies j
Enclosure:
JAEG 4101-1990, Guide for Quality Assurance of Nuclear Power Plants cc:
P. A. Ilochnert (ACRS) (w/1 copy of Enclosure) l R. W. IIasselberg (NRC) (w/l copy of Enclosure) f M. Malloy (NRC) (w/2 copics of Enclosure)
J. Peralta (NRC) (w/l copy of Enclosure) 150075 9411170278 941107 PDR ADOCK 05200004
[)