Supplemental Deficiency Rept CP-87-50 Re Turbine Auxiliary Feedwater Pump Bearing Temp.Initially Reported on 870727. New Schedule Dates for Completion of Unit 1 Projected to 880415 & Unit 2 Will Be Prior to Fuel Reload
ML20149G921
Person / Time
Site: Comanche Peak  
Issue date: 02/16/1988
From: Counsil W, Woodlan D
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CP-87-50, TXX-88235, NUDOCS 8802190018
Download: ML20149G921 (1)


Text

__

i J

=d Log # Txx-88235 File $ 10110 r

=

910.4

  1. # U' 1UELECTRIC wim m c.couma February 16, 1988 uaa,a..< n a ere,+,r U. 5. Nuclear Regulatory Coninission Attn: Document Control Desk Washington, D.C.

20555 5UBJECT: COMANCHE PEAK STEAM ELECTRIC STATION DOCKET 50-445 AND 50-446 TURBINE ORIVEN AUxlLIARY FEE 0 WATER PUMP BEARING TEMPERATURE SDAR: CP-87-50 (SUPPLEMENTAL REPORT)

Gentlemen:

On July 27, 1987, we verbally notified your Mr. H. 5. Phillips of a deficiency involving abnormal thrust bearing temperatures on the Turbine Driven Auxiliary feednater Pump.

Our last. report, logged Txx-88042 dated January 19. 1988, provided a schedule for the completion of corrective actions to resolve this deficiency.

Due to continuing delays in supply of material and repair instructions by the vendor, the schedule provided in Txx-88042 will not be met.

The nen schedule date for completion, based upon projected availability of spare parts and finalized repair instructions f rcm the vendor, is April 15, 1988, for all Unit 1 AFW Pumps.

The completion schedule for Unit 2 will be prior to Unit 2 fuel load.

Very truly yours,

b. b (.6 % d W. G. Counsil i

By:

D. Woodlan

~

l Supervisor, Docket Licensing MCP/grr c Mr. R. D. Martin, Region VI Resident Inspet.turs, CPSES (3) 1