Text
__
i J
=d Log # Txx-88235 File $ 10110 r
=
910.4
- # U' 1UELECTRIC wim m c.couma February 16, 1988 uaa,a..< n a ere,+,r U. 5. Nuclear Regulatory Coninission Attn: Document Control Desk Washington, D.C.
20555 5UBJECT: COMANCHE PEAK STEAM ELECTRIC STATION DOCKET 50-445 AND 50-446 TURBINE ORIVEN AUxlLIARY FEE 0 WATER PUMP BEARING TEMPERATURE SDAR: CP-87-50 (SUPPLEMENTAL REPORT)
Gentlemen:
On July 27, 1987, we verbally notified your Mr. H. 5. Phillips of a deficiency involving abnormal thrust bearing temperatures on the Turbine Driven Auxiliary feednater Pump.
Our last. report, logged Txx-88042 dated January 19. 1988, provided a schedule for the completion of corrective actions to resolve this deficiency.
Due to continuing delays in supply of material and repair instructions by the vendor, the schedule provided in Txx-88042 will not be met.
The nen schedule date for completion, based upon projected availability of spare parts and finalized repair instructions f rcm the vendor, is April 15, 1988, for all Unit 1 AFW Pumps.
The completion schedule for Unit 2 will be prior to Unit 2 fuel load.
Very truly yours,
- b. b (.6 % d W. G. Counsil i
By:
D. Woodlan
~
l Supervisor, Docket Licensing MCP/grr c Mr. R. D. Martin, Region VI Resident Inspet.turs, CPSES (3) 1