ML20149G630

From kanterella
Jump to navigation Jump to search
Advises That 880101 Rev 3 to Fundamental Nuclear Matl Control Plan Consistent W/Provisions of 10CFR70.32(c) & Acceptable.Changes to Chapter 9.0 Should Not Be Implemented. Justification Encl.Encl Withheld (Ref 10CFR2.790)
ML20149G630
Person / Time
Site: Westinghouse
Issue date: 02/12/1988
From: Cline W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Loch E
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
Shared Package
ML19341D944 List:
References
NUDOCS 8802180340
Download: ML20149G630 (2)


Text

-

s

+, ,

$$s?7 t>

VEB 12 W L- .

Eu f

Westinghouse Electric Corporation ATTN: Mr. E. P. Loch, Manager Columbia Plant

^

' Commercial Nuclear Fuel Division Drwer R

-Columbia, SL 29250 Gentlemen:

SUBJECT:

DOCKET N0. 70-1151 This ackno'wledges the receipt of your letter of January 1,1988, which trans-mitted Revision 3.0 to the Nuclear Fuel Fabrication Facility Fundamental Nuclear Material Control Plan.

Our review of the changes submitted for Chapter 1, 2, 3 and 6 has found them'to be consistent with the provisions of 10 CFR 70.32(c). Accordingly, the changes submitted for these Chapters are acceptable for inclusion into the plan.

Our m yiew of t h changes submitted for Chapter 9.0 - Recordkeeping System has found them to be sufficiently broad as to require NRC review under the provision  ?' '?

of 10 CFR 70.34. Accordingly, we have transmitted your submitted changes to Chapter 9.0 to the Office of Nuclear Materials Safety and Safeguards for their review and approval. To preclude a violation of regulatory requirements you must not implement the submitted Chapter 9.0 changes and revert to the commit-ment in your previously approvea FNMC plan. The reasons for submitting the changes to Chapter 9.0 to NMSS, Headquarters for review and approval are delineated in the enclosure to this letter.

It has been determined that your submittal contains information of a type specified in 10 CFR 2.790(d). It is therefore deemed to be commercial or financial information within the meaning of 10 CFR 9.5(a)(4) and shall be subject to public disclosure only in accordance with the provisions of 10 CFR l 9.12 Should pu have nay questions concerning this letter, we will be glad to discuss them with you.

Sincerely, ORIGINAL SIGNED BY WILLIAM E. CLINE William E. Cline, Chief 8802180340 880212 Nuclear Materials Safety and PDR ADOCK 07001151 Safeguards Branch C PDR' Division of Radiation Safety and Safeguards

Enclosure:

(Seepage 2)

[

kATERtu TRANSWTitD mm i I I

CoNTAINS 2.79o INFoRMAfto4

FEB 151588 l

+ MATE 1AL TRANSMITTEo HEREWITH CONY AINS g,790 INFoRWATroN Westinghouse Electric Corporation 2

Enclosure:

Changes to the FNMC Plan Deemed to Require NMSS Headquarters Review cc w/ enc 1:

A. J. Nardi, Manager ES License Administrator P. O. Box 355 Pittsburgh, PA 15230 bec w/ encl:

NMSS Docket Room, 70-1151, 396-SS v0ccunent Control Desk P-137 Chief, Licensing Branch, DST /NMSS Region II Licensing File, (VM27),

(70-1151) TAB-B bec w/o encl:

State of South Carolina G. Troup, Project Inspector l'

l i

l r e a 02/ft/88 02/11/88 02/tl /88

$!$'Y$$8ErS$"f$[*lTH