Confirms Verbal Authorization Provided on 970701 Re Start of Independent Corrective Action Verification Program at Plant, Unit 2
ML20149G512
Person / Time
Site: Millstone 
Issue date: 07/16/1997
From: Imbro E
NRC (Affiliation Not Assigned)
To: Curry D
AFFILIATION NOT ASSIGNED
References
NUDOCS 9707230307
Download: ML20149G512 (5)


Text

Y fo_y(o

-eg\\

7 p

UNITED STATES g

]

NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 30seHOM k*****

July 16,1997 Daniel Curry, Project Director Parsons Power Group Inc.

2675 Morgantown Road Reading, PA 19607

Dear Mr. Curry:

On June 30,1997, Northeast Utilities notified the U.S. Nu'elear Regulatory Commission that one half of the Maintenance Rule Group 1 (15 of 30) system reviews for Millstone Unit 2 had been completed. The review included the completion of the problem identification phase of the Configuration Management Program (CMP) for these systems, and the activities of the Quality Assurance organization as required by the Confirmatory Order of August 14,1996. Therefore, we are authorizing the start of the Independent Correctivs M!on Verification Program (ICAVP) at Millstone Unit 2. This written authorizatiori confirms the verbal authorization provided to you on July 1,1997.

On July 3,1997, you were informed that the High Pressure Safety injection System (System ID 2308) and the Reactor Water Storage Tank (System ID 2350) were to be reviewed by Parsons Power Group inc. In accordance with the audit plan for the ICAVP. On July 7,1997, we informed you that the Auxiliary Feedwater System (System ID 2322), including the Condensate Storage Tank, was also to be included in your review.

For the purposes of the ICAVP, the staff considers the High Pressure Safety :njection System j

(HPSI) and the Reactor Water Storage Tank (RWST) as a single system since the RWST provides the source of water necessary for the HPSI to fulfill its design basis safety-related function. Also, for the ICAVP, the staff considers the Auxiliary Feedwater System (AFW) to include the Condensate Storage Tank (CST) as a single system since the CST provides the j

source of water necessary for the AFW to fulfill its design basis safety-related function.

]

Additional systems to be reviewed will be provided following the completion of the problem identification phase of the CMP at Unit 2. The staff has completed its review of your revised l

audit plan and finds it acceptable. A letter documenting the bases for our approval will be provided in the near future.

Following your initial review of the system documentation, we request that you develop your j

recommendations for the system boundaries definitions. We also request that you be prepared j

j to present these system boundaries at a public meeting on July 30,1997, at the Millstone site.

)

i i

i 9707230307 970716 PDR ADOCK 05000336 P

PDR giptwpt!i h

4 1

t Daniel Curiy 2

If there are further questions on the systems' selection or the propoeed meeting, please contact me at (301) 415-1490.

Sincerely, k=

Eugene Imbro, Deputy Director.

lCAVP Oversight Special Projects Office Office of Nuclear Reactor Regulation l

cc: See next page i

l l

t I

I l

P Daniel Cum 2

July 16,1997 if there are further questions on the systems' selection or the proposed meeting, please contact

)

me at (301) 415-1490.

1 S' 'cerely, j

Original signed by:

Eugene Imbro, Deputy Director ICAVP Oversight Special Projects Office Office of Nuclear Reactor Regulation ec: See next page DISTRIBUTION:

  • Docket Files (Docket 50-336)7

~

PUBLIC WTravers DMcDonald SPO R/F PMcKee

  • See previous concurrence page To receive a copy of this document, Indicate in the box "C" a Copy without attachtenci"E" a Copy with attachtenci "N" s No copy

/

]

/i OFFICE ICAVP/SPO C

LA k h ICAVP/SPO b-ICAVP/SPO SPQ:D NAME JANakoski*

LBerry SReynolds' b EVimbro O rhverd DATE 7 /10 /97

/ lI/97 7/

/97 7 / /97

/I OFFICIAL RECORD COPY l

(

1 i

1

)

I Northeast Nuclear Energy Company Millstone Nuclear Power Station Unit 2 cc:

Lillian M. Cuoce, Esquire Citizens Regulatory Commission l

Senior Nuclear Counsel ATTN: Ms. Susan Perry Luxton 1

Northeast Utilities Servic. Company 180 Great Neck Road i

P. O. Box 270 Waterford, Connecticut 06385 j

Haitford, CT 06141-0210 i

Mr. F. C. Rothen Mr. Kevin T. A. McCarthy, Director Vice President - Nuclear Work Services j

Monitoring and Radiation Division Northeast Nuclear Energy Company Department of Environmental P.O. Box 128 Protection Waterford, CT 06385 l

79 Elm Street Hartford, CT 06106-5127 Charles Brinkman, Manager Washington Nuclear Operations 1

Mr, Allan Johanson, Assistant Director ABB Combustion Engineering Office of Policy and Management 12300 Twinbrook Pkwy, Suite 330 l

Policy Development and Planning Rockville, MD 20852 i

Division 450 Capitol Avenue - MS 52ERN Mr. D. M. Goebel P. O. Box 341441 Vice President - Nuclear Oversight Hartford, CT 06134-1441 Northeast Nuclear Energy Company 4

J i

P. O. Box 128 i

Regional Administrator, Region i Waterford, CT 06385 i

U.S. Nuclear Regulatory Commission j

475 Allendale Road Mr. M. L. Bowling, Jr.

j King of Prussia, PA 19406 Millstone Unit No. 2 Nuclear Recovery Officer 4

First Selectmen Northeast Nuclear Energy Company i

Town of Waterford P. O. Box 128 i

Hall of Records Waterford, CT 06385 j

200 Boston Post Road j

Waterford, CT 06385 Senior Resident inspector i

Millstone Nuclear Power Station l

Deborah Katz, President c/o U.S. Nuclear Regulatory Commission Citizens Awareness Network P. O. Box 513 P. O. Box 83 Niantic, CT 06357 Shelburne Falls, MA 03170 Mr. J. K. Thayer Mr. Wayne D. Lanning Recovery Officer-Nuclear Deputy Director ofInspections Engineering and Support Special Projects Office Northeast Nuclear Energy Company 475 Allendale Road P. O. Box 128 King of Prussia, PA 19406-1415 Waterford, CT 06385 Mr. M. R. Scully, Executive Director Burlington Electric Department Connecticut Municipal Electric c/o Robert E. Fletcher, Esq.

Energy Cooperative 271 South Union Street 30 Stott Avenue Burlington, VT 05402 Norwich, CT 06360

..lT-L N:rthe st Nucle:r Energy Company Millstone Nuclear Power Station 8

Unit 2 cc:

Mr. William D. Meinert Mr. John Buckingham Nuclear Engineer Department of Public Utility Control Massachusetts Municipal Wholesale Electric Unit Electric Company 10 Liberty Square P. O. Box 426 New Britain, CT 06051 l

Ludlow, MA 01056 4

Mr. James S. Robinson Ernest C. Hadley, Esq.

Manager, Nuclear investments and i

1040 B Main Street Administration

)

P. O. Box 549

. New England Power Company West Wareham, MA 02576 25 Research Drive i

Westborough, MA 01582 i

Joseph R. Egan, Esq.

4 Egan & Associates, P.C.

Mr. B. D. Kenyon 2300 N Street, NW President and Chief Executive Officer Washington, D.C. 20037 Northeast Nuclear Energy Company P. O. Box 128

}

The Honorable Terry Concannon Waterford, CT 06385 i

Co-Chair Nuclear Energy Advisory Council Mr. John C. Markowicz Room 4035 Nuclear Energy Advisory Council Legislative Office Building 9 Susan Terrace Capitol Avenue Waterford, CT 06385-3515 Hartford, Connecticut 06106 Mr. Evan Woolacott Co-Chair Nuclear Energy Advisory Council 128 Terrys Plain Road Simsbury, CT 06070 Ms. P. Loftus Director-Regulatory Affairs for Millstone Station Northeast Nuclear Energy Company P. O. Box 128 Waterford, CT 06385 Mr. N. S. Cams Senior Vice President and Chief Nuclear Officer Northeast Nuclear Energy Company P. O. Box 128 Waterford, CT 06385