Forwards Rev 3 to Sequoyah Nuclear Plant,Unit 1,Cycle 7 Colr
ML20149G104
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 09/23/1994
From: Shell R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20149G107 List:
References
NUDOCS 9409300036
Download: ML20149G104 (4)


Text

V I

.A Temeswe Valey Autho'd y Post Offia Box ?>00 SodceDa sy Tennessee 37379 September 23, 1994 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of ) Docket No. 50-327 Tennessee Valley Authority )

SEQUOYAH NUCLEAR PLANT (SON) - UNIT 1 CORE OPERATING LIMITS REPORT (COLR), REVISION 3 In accordance with SON's Unit 1 Technical Specification 6.9.1.14.c, enclosed is the Unit 1 Cycle 7 COLR, Revision 3. This revision is being provided to add revised W(z) functions and corresponding reduced axial flux difference limits.

Additionally, Figure 1 was revised to require the control rod fully withdrawn position to be greater than 226 steps for a cycle burn-up to 9,000 megawatt days / metric ton uranium.

There are no commitments contained in this submittal . Please direct questions concerning this issue to W. C. Ludwig at (615) 843-7460.

Sincerely, R. H. Shell Manager SON Site Licensing Enclosure cc: See page 2 NO S$obk gj7

" }$1@,,

^

l

. l U.S. Nuclear Regulatory Commission i Page 2 l September 23, 1994

'I i

i cc (Enclosure)

Mr. D. E. LaBarge, Project Manager l Nuclear Regulatory Commission j One White Flint, North  :

11555 Rockville Pike l Rockville, Maryland 20852-2739  !

NRC Resident inspector  !

Sequoyah Nuclear Plant ,

2600 Igou Ferry Road  !

Soddy-Daisy, Tennessee 37379-3624 Regional Administrator l U.S. Nuclear Regulatory Commission j Region 11 101 Marietta Street, NW, Suite 2900  !

Atlanta, Georgia 30323-2711 l i

I i

l f

f 1

[

l

.aw.. - a2. _e .,_ma - m a -- a-- . 3_ .. d &_,,, ,,,, _ _

4 l

ENCLOSURE SEQUOYAH NUCLEAR PLANT UNIT 1 CYCLE 7  !

CORE OPERATING LIMITS REPORT REVISION 3 i

r (L36 940919 802)  !

i

)

i i

i

.t h

I t

I i

I l

I I

l 3

.I I

5

, - , w~ . . , . , ,,.- ..,., , . - - - - - . .,.

4

-ENCLOSURE SEQUOYAH NUCLEAR PLANT UNIT 1 CYCLE 7 CORE OPERATING LIMITS REPORT REVISION 3 (L36 940919 802)

~

l i

_. - . _ . _ _ . . . , _ ._ - - - - . . - . - - , _ , - . - . -. -.