ML20149G104
| ML20149G104 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 09/23/1994 |
| From: | Shell R TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20149G107 | List: |
| References | |
| NUDOCS 9409300036 | |
| Download: ML20149G104 (4) | |
Text
V I
.A Temeswe Valey Autho'd y Post Offia Box ?>00 SodceDa sy Tennessee 37379 September 23, 1994 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:
In the Matter of
)
Docket No. 50-327 Tennessee Valley Authority
)
SEQUOYAH NUCLEAR PLANT (SON) - UNIT 1 CORE OPERATING LIMITS REPORT (COLR), REVISION 3 In accordance with SON's Unit 1 Technical Specification 6.9.1.14.c, enclosed is the Unit 1 Cycle 7 COLR, Revision 3. This revision is being provided to add revised W(z) functions and corresponding reduced axial flux difference limits.
Additionally, Figure 1 was revised to require the control rod fully withdrawn position to be greater than 226 steps for a cycle burn-up to 9,000 megawatt days / metric ton uranium.
There are no commitments contained in this submittal. Please direct questions concerning this issue to W. C. Ludwig at (615) 843-7460.
Sincerely, R. H. Shell Manager SON Site Licensing Enclosure cc: See page 2
}$1@,,
NO S$obk gj7
^
U.S. Nuclear Regulatory Commission i
Page 2 September 23, 1994 i
i cc (Enclosure)
Mr. D. E. LaBarge, Project Manager l
Nuclear Regulatory Commission j
One White Flint, North 11555 Rockville Pike l
Rockville, Maryland 20852-2739 NRC Resident inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission j
Region 11 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711 l
i I
i l
f f
1
[
l
.aw..
a2.
_e
.,_ma m
a a--
3_
d 4
ENCLOSURE SEQUOYAH NUCLEAR PLANT UNIT 1 CYCLE 7 CORE OPERATING LIMITS REPORT REVISION 3 i
r (L36 940919 802) i
)
i i
- i
. t h
I t
I i
I l
I I
l 3
. I I
5 w~
4
-ENCLOSURE SEQUOYAH NUCLEAR PLANT UNIT 1 CYCLE 7 CORE OPERATING LIMITS REPORT REVISION 3 (L36 940919 802)
~
i
-.