Mod 6,extending Period of Performance & Adding Revised Schedule for Submittal of Deliverables,To Piedmont Seismic Reflection Study
ML20149F788
Person / Time
Issue date: 02/16/1988
From: Steiss A, Wiggins E
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM), VIRGINIA POLYTECHNIC INSTITUTE & STATE UNIV., BLACKSB
To:
Shared Package
ML20149F775 List:
References
CON-FIN-D-1552, CON-NRC-04-85-106, CON-NRC-4-85-106 NUDOCS 8802170364
Download: ML20149F788 (2)


Text

i

1. CON T RACT. t O CODE.

PAG E.. OF PAGES J.,/ h..M,ENDMENT.QF.SdLICITATION/M OlF.iCATlQNEF. CONTRACT-

..) i._., ;.

.e /, O.

.1

[

2-

2. AMENOMENT/MOOlF# CATION NO, i, 3.

ET ED TE.

e. REQU154 TlON/PuftC WE R EQ.,NO.'

5., PRChJ ECT NO. (1/ epplice68e)

  • Six (6)

~

N RFPA RES-8f-106 I

issvEO av CODE

.cooE Ue..s Nucl. ear Regulatory Connission Division 6f Contracts.

Washington, D.C.

20555

4. NAME AND ADOR ESS OF CONT RACTOR (No., agreet, county,80ste and Elf Code) y}

9A. AMENOMENT OF SOLICITATION NO.

Virginia Polytechnic Institute and State University Office of Sponsored Programs

98. OATEO (SEE ITEM J J) 301 Burruss Hall B1acksburg,.VA 24061 ICA. MOOtFICATION OF CONT RACT/ ORDER No.

X NRC-04-85-l'06 lob. DATED (SEE ITEM J3)

CODE l FACILITY CODE 10/1/85

11. THIS ITEM ONLY APPLIESTO AMENDMENTS OF SOLICITATIONS The above numbered solicitation is amended as set forth in item 14. The hour and date specified for reaript of Offer:

is exterCTed, is not ex.

tended.

Offers rnust acknowledge receipt of this muwit prior to the hour and date specified in the solicitation or as amended,by one of the following rnethods:

(a) By completing items 8 and 15.and returning copies on the amendment: (b) By acknovviedging receipt of this amendment on each copy of the of fer submitted; or (c) By separate letter or telegram whidi includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG, MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE sPECIFIED MA IN FtEJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted,such change may be made by telegram or letter,provHed each telegram or letter makes reference to the solicitation and this arnendrnent, and is received prior to the opening hour and date specified.

12. ACCOUN T ING AND APPROPRI A 610N DATA (1/ required)

B&R No.* 601910 FIN No.: D1552 Obli ca tod-

$ 13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTR ACTS / ORDERS, IT MODIFIES THE CONTR ACT/ ORDER NO. AS DESCRIBED IN ITEM 14.

'5"'*"*""""^""'55

"'"'""'"2'^"'"^

vi ^%5s"t##!R N!.'iO lH'Jnf."""5"^""

3. THE AttOVE NUMBEREO CONTR ACT/ ORDER 15 MOOlFIED TO REFLECT THE ADMINISTR ATlVE CHA.NGES (such as changes in paying offge, appropriation dele, etc.) $ET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF F AR a3.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENT ERED INTO PURSUANT SO AUTHORITY OF X

Clause 52.243-2 "Change--Cost Reimbursement" of contract and rnutual agrenment nr tho_ par-ties

0. 01HER iSpacery aype at modulacetson and authorstyJ E. IMPORTANT: Contractor is not, X is rcquired to sign this document and return 2

Copies to the issuing of f ke.

TI~OESC RIPT lON OF AMENOMEN T/MoolFICAT lON (Organised by UCF section headrags, sneluding solscitetson/ contract autveet metter where feessble.1 This modification adds a deliverable schedule to Section F and extends the period of per formance. Therefore:

1.

Under Section F.1, Report, Documentation and Other Deliverable End Iteas, Subsection F.1.4, Final Report / Microfiche Copies, is revised tO incorporate the following schedule:

"a.

The Contractor shall complete processing all seismic reflection profiles on or before March 31, 1988.

l EBCMt as provided bef ten, all terrns and Condit6ong of the document referenced 6n item 9A or 10A, as heretofore changed, remains unchang*6 arid in f uit force i

and GIfect.

16A. N AME AND T ITLE OF CON T RAC TING OF FICER (Type or pnnt)

IS A. N AME AND TIT LE OF StGNER (Type or prent)

Alan Walter S eiss, Di tor of Elois J. Wiggins Spo s d ro ra.s i

lu cO in u ;e i; I SC. O AT E 5sGN t o l6 0. UNI E O S T Af r,5 0F AM niCA 16C. D A T E 5'GN EO h

.m v...;,.l.. a..,,ew - -

t $;

  • ,,1
.., - -- NN f

~~

o....,,

W 8802170364 080216 o

a mm u o e

PDR CONTR

...,,,..m o,,, o n NRC-04-OS-106 PDR

,AngsC,n3a m b

. f...

a

(.. y
b..

S

.-
.w.:

2

, (;...;

J NRC-04-85-106 Modification No. 6 Page 2 of 2 b.

The Contractor shall submit one copy of a draft report on data processing to the NRC Project Officer on or before April 29, 1988.

.c.

The Contractor shall complete the geophysical line drawings on or before August 31, 1988.

d.

The Contractor shall submit one copy of a draft final report for the effort under this contract, to the NRC Project Officer on or before October 31, 1988.

+

e.

The Contractor shall submit a Final Report in thirteen copies to the NRC Project Officer and one copy to the NRC Contracting Officer on or before, but no later than, December 30, 1988."

The remainder of Section F.1.4 in the basic contract regarding submittal of one master microfiche copy of the Final Report remains unchanged."

2.

The Contractor shall continue to submit monthly business letters in accordance with Section F.1.1, and quarterly reports in accordance with Section F.1.2 of the basic contract, during the extended period of perfonnance.

3.

Section F.3, Duration of Contract period is deleted in its entirety and the following is substituted in lieu thereof:

"The contract shall become effective on October 1,1985 and shall continue to completion which shall occur no later than December 30, 1988."

All other terms and conditions of this contract remain the same.