ML20149F720
| ML20149F720 | |
| Person / Time | |
|---|---|
| Site: | Quad Cities |
| Issue date: | 12/23/1987 |
| From: | Muller D Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20149F723 | List: |
| References | |
| NUDOCS 8801140315 | |
| Download: ML20149F720 (6) | |
Text
,;r--
-~
- pa at%q'o,,
UNITED STATES
[
g NUCLEAR REGULATORY COMMISSION g
a WASHING TON, D. C. 20555 7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION COMMONWEALTH EDISON COMPANY DOCKET NO. 50-254 NOTICE OF CONSIDERATION OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE OPPORTUNITY FOR PRIOR HEARING The U. S. Nuclear Regulatory Comission (the Comission) is considering issuance of an amendrrent to Facility Operating License No. DPR-29 issued to Comonwealth Edison Company, (the licensee), for operation of Quad Cities, Unit 1, located in Rock Island County, Illinois.
Pursuant to 10 CFR 50.90, Comonwealth Edison Company (CECO, the licensee) has proposed an amendment of Facility Operating License DPR-29 which would revise Technical Specifications (TS) in order to compensate for continued operation of Quad Cities Nuclear Power Station (QCNPS), Unit 1, with a failed jet pump flow instrument line.
Proposed TS 3.6.G. Limiting Conditions of Operation (LCO) would change the total number of jet pump flow indication from "20" to "19" for: 1) verification of recirculation flow prior to reactor startup from cold conditions, 2) input to the indicated core flow, and 3) applicable technical bases.
Prior to issuance of the proposed license amendment, the Comission will have made findings required by the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations.
1 8901140315 890104 DR ADOCK 05 4
I 7590-01 By February 1,1988, the licensee may file a request for a hearing with respect to issuance of the amendment to the subject facility operating license and any person whose interest may be affected by this proceeding and who wishes to participate as a party in the proceeding must file a written petition for leave to intervene.
Request for a hearing and petitions for leave to intervene shall be filed in accordance with the Commission's "Rules of Practice for Domestic Licensing Proceedings" in 10 CFR Part 2.
If a request for a hearing or petition for leave to intervene is filed by the above date, the Commission or an Atomic Safety and Licensing Board, designated by the Commission or by the Chairman of the Atomic Safety and Licensing Board Panel, will rule on the request and/or petition and the Secretary or the designated Atomic Safety and Licensing Board will issue a notice of hearing or an appropriate order.
As required by 10 CFR 2.714, a petition for leave to intervene shall set forth with particularity the interest of the petitioner in the proceeding, and how that interest may be affected by the results of the proceeding. The petition should specifically explain the reasons why intervention should be permitted with particular reference to the following factors:
(1) the nature of the petitioner's right under the Act to be made a party to the proceeding; (2) the nature and extent of the petitioner's property, financial, or other interest in the proceeding; and (3) the possible effect of any order which may be entered in the proceeding on the petitioner's interest. The petition should also identify the specific aspects (s) of the subject matter of the proceeding as to which petitioner wishes to intervene. Any person who has filed a petition for leave to intervene or who has been admitted as a party may
}
s.?
I 7590-01 amend the petition without requesting leave of the' Board up to fifteen (15) days prior to the first prehearing conference scheduled in the proceeding, but such an amended petition must satisfy the specificity requirements described above.
Not later than fifteen (15) days prior to the first prehearing conference scheduled in the proceeding, a petitioner shall file a supplement to the petition to intervene which must include a list of the contentions which are sought to be litigated in the matter, and the bases for each contention set forth with reasonable specificity.
Contentions shall be limited to matters within the scope of the amendment under consideration. A petitioner who fails to file such a supplement which satisfies these requirements with respect to at least one contention will not be pemitted to participate as a party.
Those permitted to intervene become parties to the proceeding, subject to any limitations in the order granting leave to intervene, and have the opportunity to participate fully in the conduct of the hearing, including the opportunity to present evidence and cross-examine witnesses.
A request for a hearing or a petition for leave to intervene shall be filed with the Secretary of the Commission, United States Nuclear Regulatory Commission. Washington, D.C.
20555, Attention: Docketing and Service Branch, or may be delivered to the Comission's Public Document Room,1717 H Street, N.W., Washington, D.C. by the above date. Where petitions are filed during thelastten(10)daysofthenoticepericd,itisrequestedthatthe petitioner or representative for the petitioner promptly so infom the
11' 7590 01 Comission by a toll-free telephone call to Wester Union at (800) 325-6000 (in Missouri (800)342-6700). The Western Union operator should be given Datagram Identification Number 3737 and the following message addressed to Daniel R.
Muller: petitioner's name and telephone number; date petition was mailed; plant name; and publication date and page number of this FEDERAL REGISTER notice. A copy of the petition should also be sent to the Office of the General Counsel -
Bethesda, U.S. Nuclear Regulatory Commission, Washington, D.C.
20555; and to Michael Miller of Isham, Lincoln, and Beale, Three First National Plaza, Suite 5200, Chicago, Illinois 60602, attorney for the licensee, hontimely Filings of petitions for leave to intervene, amended petitions, supplemental petitions and/or requests for hearing will not be entertiined absent a determination by the Commission, the presiding officer or the presiding Atomic Safety and Licensing Board, that the petition and/or request should be grantedbaseduponabalancingofthefactorsspecifiedin10CFR2.714(a)(1)(1)-(v) and2.714(d).
For further details with respect to the action see the application for amendment dated November 16, 1987, which is available for public inspection at
- the Commission's Public Document Room, 1717 H Street, N. W., Washington, D.C.;
and at the Dixon Public Library, 221 Hennepin Ave., Dixon, Illinois 61021.
Dated at Bethesda, Maryland this 23rd day of December 1987.
-FOR THE NUCLEAR REGULATORY COMMISSION lh Daniel R. Muller, Director Project Directorate III-2 Division of Reactor Projects - III, IV, Y and Special Projects i
9 cc:
See next page DISTRIBUTION Docket File DHagan NRC & Local PDRs ACRS (10)
PDI11-2 Reading File GPA/PA GHolahan Plant File LLuther TRoss OGC-Bethesda
- i f
- PD LLuther ;A%
TRoss:bj7A DMile
/7/ /k/87 a /j6/87
- n. /n /87 1
4 4
4
e e 01STRIBUTION Docket
- File r DHagan NRC & PORs ACRS (10)
Decor 23,1987 P03-2 Rdg. File GPA/PA GHolahan Plant File nocxET No.
50-254 Lluther
' Rules and Procedures Branch TRoss
' MEMORANDUM FOR:
Division of Rules and Records OGC-Bethesda Of fice of Administration FROM:
Office of Nuclear Re' actor Regulation suexct:
MOTICE OF CONSIDERATION OF !$SUANCE OF AMEN 0 MENT.70 FACILITY OPERATING LICENSE OPPORTUNITY FOR PRIOR HEARING One signed original of the Federal Register Notice identified below is enclosed for your transmittal to the Office of the Federal Register for publication. Additional conformed copies ( 6
)of the Notice are enclosed for your use.
Notice of Receipt of Application for Construction Permit (s)and Operating License (s).
Notice of Receipt of Partial Application for Construction Permit (s)and Facility License (s): Time for Submission of Views on Antitrust Matters.
Notice of Consideration of Issuance of Amendment to Facility Operating License.
Notice of Rece!pt of Application for Facility License (s); Notice of Availability of Applicant's Enotonmental Report; and Notice of Consideration of Issuance of Facility License (s)and Notice of Opportunity for Hearing.
NoUce of Availability of NRC Draft / Final Environmental Statement.
Notice of Limited Work Authorization.
Notice of Avaltability of Safety Evaluation Report.
Notice of Issuance of Construction Permit (s).
Notice of lasuance of Facility Operating License (s) of Amendment (s).
b Orcer.
Exemption.
Notice of Granting Exemption.
Environmental Assessment.
Notice of Preparation of Environmental Assessment.
INDIVIDUAL NOTICE otner:
I i
Of fice of Nuclear Reactor Regulation
[
1'
Enclosure:
As stated
Contact:
lluther Phone: x27880 1
i l
orrics>
OUCNAMs>
OA
( wze comu sie no.so, weew ea4o OFFICIAL RECORD COPY
%-