ML20149F668

From kanterella
Jump to navigation Jump to search
Informs That Safety Aspects of Industrial Radiography Course (H-305) Will Be Held in Niantic,Ct on 970811-15.List of Attendees,General Info & Course Schedule Encl
ML20149F668
Person / Time
Issue date: 06/29/1997
From: Raglin K
NRC OFFICE FOR ANALYSIS & EVALUATION OF OPERATIONAL DATA (AEOD)
To: Cornell S, Dawn Jonsson, Myers J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III), NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS), NRC OFFICE OF STATE PROGRAMS (OSP)
Shared Package
ML20149F642 List:
References
NUDOCS 9707220264
Download: ML20149F668 (15)


Text

- -. . . - . . . . - . - . . . -- . .. - - .

  • o UNITED STATES  ;

p , NUCLEAR REGULATORY COMMISSION 5  ! ossIo$$$$c'[ck"N CR U 200  ;

{ k . . . . . g# CHA Noo T 74 -4017

June 29, 1997 MEMORANDUM T0
Dawn Jonsson, Training Coordinator, RIII I Sally Cornell, Training Coordinator, NMSS Brenda Hill-Usilton, Training Coordinator, OSP '

Jim Myers, State Programs Kenneth A. Raglin, Director, TTD, AE D 4

FROM: /

SUBJECT:

SAFETY ASPECTS OF INDUSTRIAL RADIOGRAPHY COURSE (H-30 AUGUST 11 - 15, 1997 4

' The subject course is to be held in Niantic, CT from August 11 - 15, 1997.

Attached is a list of attendees, general information as well as a tentative i course schedule. The course will be presented by Hellier Associates.

3 Students who are normally on the Compressed Work Schedule should be removed from the Compressed Work Schedule during training. Classes will run from 8:00am to 5:00pm daily starting Monday, August 11. The course will conclude at approximately noon on Friday, August 15 after a final exam.

Please provide your attendees with the above and inform them as to their

, responsibilities in preparing for this course.

If you have any questions concerning this course, please call either Paul l Knapp or Russ Anderson on 615/855-6500, i

Attachments: 1. List of Attendees

2. General Information
3. Course Outline cc w/atts: R. Anderson, TTD P. Knapp, TTD J. Patterson, TTD 9707220264 970717 PDR STPRG ESGGEN PDR

1 1-  !

4

! LIST OF ATTENDEES COURSE TITLE: Safety Aspects Lf Industrial Radiography Course (H-305)

COURSE DATES: August 11 - 15, 1997 SHIFT: 8:00AM - 5:00PM

)

INSTRUCTORS: Hellier Associates Y  !

J

&lli George Parker Roy P. Hays  !

Andrea L. Kock 4

i l

2 NRR

James E. Spets i

!- DSE 4

Lance J. Rakovan I

i STATE PROGRAME 3

IF THERE ARE ANY CANCELLATIONS, PLEASE NOTIFY US IMMEDIATELY!

a r-e-- g. e m - w- T

6-27-1997 19 : OGRi FROM HELLIER ASSOCIATES 8607393732 P. I 2

IB H E L L I E R i

i FAX NO: (423) 855-6546 TO: . Paul Knapp DATE: June 27,1997

. FROM: William J. Norton, Jr. Total Pages: 3 l I

We have blocked 20 rooms at the following:

EAST LYME INN 239 Flanders Road Niantic, CT 06357 Telephone: (860) 739-3951 Make sure each individual mentions this room block when making his/her reservations. The block number is 30397.

All hotels rooms, not guaranteed for late arrival, will p_91 he held after 6:00 P.M.

Major credit cards may be used to guarantee the rooms.

The rooms will be released on Monday, July 28th if reservations have not been made by that time.

We have the arrival date as Sunday, August 10th and Depanure on Saturday, August 16th.

The rate will be $48.16 per day including tax.

Facilities: Cable TV, smoking or non-smoking rooms, laundry facilities or valet laundry, ice, soda and snack machines with microwave, outdoor swimming pool, rooms with refrigerators available.

Continental breakfast in lobby from 6:00 a.m. to 10:00 a.m.

277 West Main Street

  • Niantic, CT 06357 1018 - (860) 739-8950 Fax (860) 739-6732

G-27-1997 12 OEPM FROli HELLIER ASSOCIATES BG0739S732 P. 2 l

1 HE LLIE R DIRECTIONS FROM BR ADLEY INT'L AIRPORT (H ARTFORD. CT) TO East Lyme Inn Niantic, CT l-91 South to Exit 22S (Rt. 9 South), follow Rt. 9 South to the end (I 95 North),I 95 North to Exit 74 (Rt.161), tum right at the end of the ramp . East Lyme Inn will be on the left at the rext stop light.

DIRECTIONS FROM T.F. CREEN AIRPORT (PROVIDENCE RD TO i

East Lyme Inn Niantic, CT 1-95 South to Exit 74 (Rt.161), turn right at the end of the ramp - East Lyrne Inn will be on the left at the 2nd stop light.

i Trnvel time from the airport to hotel is approximately 11/4 11/2 hours j TO HELLIER ASSOCIATES East Lyme Inn Niantic, CT Rt.161 North to I-95. I-95 South to Exit 72 (Rocky Neck State Park Connector). Follow connector to end and turn right on W. Main St. (Rt.156). Hellier

, Associates is located approximately 4/10 of a mile from intersection on the right side of road (first driveway past restaurant but before residential area). Hellier Associates is located through the center door of the brown brick building.

I I

I I

277 West Main Street

  • Niantic, CT 06357-1018 -(860) 739-8950. Fax (860) 739 6732

_, . _. . _. _ _~___ _ -

. G-27-1997 12:07PM FROH HELLIER ASSOCIATES 86073SS732 P. 3 l l

H E L LIE R  ;

i I

DIRECTIONS TO IIELLIER ASSOCIATES From New York City area Follow I.95 North to Exit 72 (Rocky Neck State Park  ;

Connector). Follow connector to end and turn right on W. Main St. (Rt.156). Hellier Associates i

is located approximately 4/jo of a mile fmm intersection on the right side of road (first driveway  !

past restaurant but before residential area). Hellier Associates is located through the center door of '

the brown brick building.

From New London /Groton alrport When you come out of the airport, take left on to l Tower Avenue which changes to High Rock Road. At end of High Rock Road, turn left on to l Poquonnock Road. At 1st traffic light, turn left on to Rainville Avenue. At the next light, turn right I J

on Clarence B. Sharp Highway (Rt. 349) and continue straight and you will see signs for 1-95.

Exit for1-95 South will be on the left side of the road. Follow 1-95 South to Exit 72 (Rocky Neck State Park Connector). Follow connector to end and turn right on W. Main St. (Rt.156). Hellier Associhtes is located appmximately 4/jo of a mile from intersection on the right side of road (first ,

driveway past restaurant but before residential area). IIellier Associates is located through the I center door of the brown brick building.

From Providence, RI area Follow I-95 South to Exit 72 (Rocky Neck State Park l Cormector). Follow connector to end and turn right on W. Main St. (Rt.156). Hellier Associates

{

is located approximately d/io of a mile from intersection on the right side of road (first driveway '

pcst restaurant but before residential area). Hellier Associates is located through the center door of the brown brick building.

- From Worcester, MA area Follow 1-395 South to the end (I-95 South). I 95 South to Exit i 72 (Rocky Neck State Park Connector). Follow connector to end and turn right on W. Main St. l (Rt.156). Hellier Associates is located approximately 4/10 of a mile from intersection on the right  !

side of road (first driveway past restaurant but before residential area). Hellier Associates is located through the center door of the brown brick building.

l l

1 I

277 West Main Street . Niantic, CT 06357-1018 . (860) 739-8950. Fax (860) 739-6732

SAFETY ASPECTS OF INDUSTRIAL RADIOGRAPHY (H-305)

COURSE OUTLINE Day 1 -

Fundamental Properties of Matter (1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />) i Types of Radiation (1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />) l Radioactive Materials (2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />)

Interaction of Radiation with Matter (2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />)

Exposure Devices and Radiation Sources (2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />) l

)

Day 2 -

l Biological Effects of Radiation (2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />)

Radiation Detection and Measurement Equipment (2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />) l Radiation Surveys (2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />) '

Laboratory Exercises - Exposure Devices and Source Changers (2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />)

Day 3-Emergency Procedures (2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />)

Laboratory Exercises - Source f- ieval (2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />)

Case Histories of Radiography .idents (1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />)

Storago of Exposure Devices t e Sources (1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />)

Packaging and Transportation of Exposure Devices and Sources (1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />)

Laboratory Exercises - Packaging and Labeling for Shipment (1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />)

Day 4 -

Laboratory Exercises - Packaging and Labeling for Shipment continued (1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />)

Federal and State Regulations (4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />)

Radiographic Techniques (3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />)

Day 5 -

Laboratory Exercises - Taking a Radiograph (4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />)

Course Review (2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />)

Examination (2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />)

l t

TIME SENSmVE INFORMATION i

t l~ U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF STATE PROGRAMS )

i OFFICE OF STATE PROGRAMS FAX: (301) 415-3502 i NUMBER OF PAGES: 12 including this page E

i p

! DATE: JULY 17,1997 i

s e

i TO: RADIATION CONTROL PROGRAM DIRECTORS IN '

l AGREEMENT STATES, OHIO, OKLAHOMA, PENNSYLVANIA

f l NRC REGIONAL STATE AGREEMENTS OFFICERS NRC REGIONAL STATE LIAISON OFFICERS '

l FROM: PAUL H. LOHAUS, DEPUTY DIRECTOR OFFICE OF STATE PROGRAMS l

SUBJECT:

SP-97-052 ACCEPTANCE TO THE SAFETY ASPECTS OF INDUSTRIAL RADIOGRAPHY COURSE (H-305) t l .

VERIFICATION - 301-415-3340 f

1

i

< TRANSACTION REPORT > 07-17-1997(THU) 20:31 t

\

I C ESROAOCAST 3 i

NO. DATE TIME DESTINATION STATION PO. DURATION MODE- -RESULT f

j 33229 7-17 18'15 610 337 5324 12 0*04'27' NORM.E OK 33230 18:19 404 562 4955 12 0*04'31' NORM.E OK l 33231- 18:24 7085151096 12 0'08'46" NORM.E OK l 33232 18:33 817 860 8122 12 O*04'27" NORM.E OK 33233 5109750381 18:38 12 0*04'42' NORM.E OK

- 33234 18
43 334 613 5387 12 O*08'06" NORM.E OK l 33235 18:52 602 437 0705 12 0'04*33" NORM.E OK 33236 18:56 5016612468 12 0*04'59" NORM.E OK 33237 19:02 0111916 3243610 12 O*04'26" NORM.E OK 33238 19:07 303 343 3697 12 0*04'57" NORM.E OK 1 33239 19:12 904 487 0435 [14) fl~C@. 1 0'01'27" NORM.E UO10 33240 19:14 404 362 2653 12 0*04'29" NORM.E OK 33241 19:18 217 524 4724 12 0*04'30" NORM.E OK 33242 19:23 515 242 6284 12 0*04'29" NORM.E OK i 33243 19:28 913 296 0984 12 0*05'00" NORM.E OK -)

l 33244 19:33 502 564 6533 12 0*04'24" NORM.E OK 1 33245 iS:38 LOU!S!ANA 12 0*05*53* NORM.E OK l 33246 19:44 MAINE 12 O*06'48" NORMAL OK 33247 19:51 410 631 3198 12 0*05'09" NORMAL OK 33248 19:57 601+354+6167 12 0*06'59" NORMAL OK 33249 20:04 402 471 9449 12 0'04'25' NORM.E OK 33250 20:09 7026875751 12 0*07'01* NORMAL OK 33251 20:16 603 225 2325 12 0*04'35" NORM.E OK 33252 20:21 5058271544 s 12 0*06'48" NORMAL OK 33253 20:28 518 458 6434.[q))p)V 4--OR 4 0'02'25* NORM.E UO10 281 2*08'16*

l

_ -~ y j" < TRANSACTION REPORT > 07-17-1997(THU) 22:18 5

I l

\

C BROADCAST 3 NO. DATE TIME- DESTINATION STATION PG. OURATION MODE RESULT A 33254 7-17 20:32 919 571 4148 12 O*04'28" NORM.E OK

, 33255 20:36 701 328 5200 12 O*04'22" NORM.E OK . 4 33256 20:41 503 731 4081 12 O*04'23" NORM.E OK j i 33257 20:46 401 277 2456 12. O*07'55" NORM.E OK '

33258 '20:54 '8037377412 12 O'04'31* NORM.E OK 33259 20:59 ~ 615 532 7938 12 O'04*28* NORM.E OK 33260 21:04 5128346708 12 O*04*31* NORM.E OK 33261 21:08 801 533 4097hN) //f "Cid 10 O*05'51" NORM.E UO10 33262 21:15 360 '/53 1496 12 O*04*23* NORM.E OK 33263 21:19 518 457 2225 12 O'04'29" NORM.E- OK 33264 21:24 518 457 5545 12 O*05'07" NORM.E OK 33265 21:30 NEW YORK C1TV 12 O'04*32* NORM.E OK 33266 21:34 502 227 7862 12 O'05'17" NORMAL OK ,

33267 21:40 AECB (613) 995-5086 12 O*05'05" NORMAL OK 33268 21:46 WASHINGTON OC 12 O*04'23" NORM.E OK 33269 21:50 7996726 12 O'04*26* NORM.E OK 33270 21:55 217 782 1328 12 O*05'45' NORM.E OK' 33271 22:01 512 239 6362 12 O*04'32' NORM.E OK 33272 22:06 4024714840 12 O'06'44* NORMAL OK 33273 22:13 912 262 3143 12 O'05'13' NORMAL. OK 238 1'40'25"

< TRANSACTION REPORT > 07-18-1997(FRI) 09:54 C TFR ANSM I T 2 NO. DATE TIME DESTINATION STATION PG. DURATION MODE RESULT 33200 7-18 09:49 904 487 0435 12 O*05'03* NORM.E OK dh[M 12 O'05*03" i

l l

l l

i

< TRANSACTION REPORT > 07-18-1997(FRI) 07:46 E TRANSMIT 3 NO. DATE TIME DESTINATION STATION PG. DURATION MODE RESULT l 33277 7-18 07:40 801 533 4097 12 0 06*01* NORM.E OK

/D 12 0 Oe 01-l l

l

l.

l < TRANSACTION REPORT > 07-18-1997(FR!) 07:29 E TFR ANSM I T 3 l

! NO. DATE TIME DESTINATION STATION PO. DURATION MODE RESULT 33276 7-18 07:24 518 458 6434 12 O*04'52' NORM.E OK 11iA fl/?bl !Yb/ lhhhh 12 O'OA'52" V

I i l

I 1

l l

l l

e  !

1

< TRANSACTION REPORT > 07-17-1997(THU) 16:26 l l

I C TRANSMIT 3 I i

I

. NO. DATE tit 1E DESTINATION STATION PO. DURATION MODE RESULT l 37227 7-17 16:20 NYSERDA 12 O'05'36" NORt1AL OK hg[j 12 O*05'36" i i I

l l

l 4

l l

l W -

< TRANSACTION REPORT > 07-17-1997(THU) 15:30

[

C TRANSMIT 3 NO. DATE TIME DESTINATION STATION PG, DURATION MODE RESULT 3322P 7-17 15:25 917026875197 12 O'04'52' NORM.E OK hh 12 O*04'52" I

i t

i 1

l l

t l

l

' < TRANSACTION REPORT > 07-17-1997(THU) 15:55 i <

l C BROAOCAST 3 i

NO. DATE TIME DESTINATION STATION PG. DURATION MODE RESULT j 33223 7-17 15:35 OHIO 12 O'04'36" NORM.E OK 33224 15:40 PENNSYLVANIA 12 O'04'28" NORM.E OK 33225 15:45 405 271 8425 12 O'04'27" NORM.E OK j 33226 15:50 6177272098 12 0"04'56* NORM.E OK l 1

48 O'18'27" l

I I

l I

i l

l l

l l

I