P.O. Box B40 Denv er. CO 80001, 0840 R.O. WILLI AMS, JR.
February 11 1983 VICE PRESIDENT WCLEAR OPERATIONS Fort St. Vrain l
Unit No. 1 P-88070 f
U. S. Nuclear Regulatory Commission ATTN: Document Control Desk l
Washington, DC 20555 l
Occket No. 50-267
SUBJECT:
I&E Inspection Report 87-25
REFERENCE:
NRC Letter, Callan i
to Williams, dated J3nuary 15, 1958 (G-88006)
Gentlemen:
This letter is in resporise to the Notice of Violation received as a result of the inspection conducted by Messrs.
R. E. Farrell and P. W. Michaud during the period October 18 through November 21, 1987.
i The following response to the item contained in the Notice of I
Violation is hereby submitted:
Failure to Make Management Notifications Recuired by Section 2.1 ard Attachment 2 of the "Fort St. Vrain Medical Emercency Plan,"
Tssue 20.
The licensee's Technical Specification AC 7.4.a.5 requires written procecures be established and implemented covering emergency plan implementation.
l The "Fort St.
Vrain Medical Emergency Plan (MEP)," Issue 20, including Procedural Deviation Reports 87-2039 and 87-2042 prescribes those actions taken in the event of onsite injury to personnel.
Contrary to the above, on October 26, 1987, the shift supervisor failed to make the management notifications reavired by Section 2.1 and Attachment 2 of MEP, Issue 20 when a contractor electrician nad injured himself in a fall while onsite and had been transferre(i by ambulance to an off site medical facility.
This is a
Severity L1 vel IV violation.
(Supplement IV)
(267/8721-01)
(
8802170052 880211 PDR ADOCK 05000267 L
0 DCD
e s
l
-t l
P-88070 February 11, 1988 t
]
(1) The reason-for the violation if admitted:
l The violation of the procedural steps is admitted.
The violation i
is due to a procedural inadequacy in the "Fort St. Vrain Medical Emergency Plan (MEP)." The procedure w.s not clear with regards to implementation based on an injury which was not related to plant operational or equipment emergency conditions.
-Shift e
personnel did not believe that the procedure applied to this
~
event.
Subsequent evaluation by plant management has confirmed l
1 that the procedure was not intendrd to. address this type of i
situation.
It should be noted that the victim's needs were.
attended in a timely manner, and that transport via ambulance to the medical facility is determined on a case-by-case basis.
l (2) The corrective steps which have been taken and the results i
achieved:
l 1
The Superintendent of Operations reviewed the incident with each l
1 Shift Supervisor. The requirements and applicability of the "Fort St.
Vrain Medical Emergency Plan (MEP)" were reviewcd and i
j j
clarified immediately following the incident.
The issue was again reviewed at the weekly Shift Supervisor's Staff Meeting i
held on February 10, 1988, and a proposed revision to the MEP was j
discussed.
t The actions prescribed in the "Fort St. Vrain Medical Emergency i
Plan (MEP)," Issue 20 have been taken in every injury which has i
occurred since the October 26, 1987 incident.
i (3) Corrective steps which will be taken to avoid further violations:
i The "Fort St.
Vrain Medical Emergency Plan (MEP)" will be rewritten, The procedure will be revised to simplify and clarify j
the required actions to be taken in the case of injury to on-site
'i i
perscnnel. The applicability of the procedure for contractor i
I personnel will be well-defined.
The new procedure will be better defined as to its applicability for the type of situations that 4
may be encountered.
l (4) The date when full compliance will be achieved:
2 1
Full compliance will be achieved with the issuance of a revision to the "Fort St.
Vrain Medical Emergency Plan (MEP)."
The revisions will be issued by April 15, 1983.
3 a
i i
i
~, -
l 4
i P-88070 February 11, 1988' Should
.you have any further-questions, please contact Mr. M. H. Holmes at (303) 480-6960.
Sincerely, R. O. Williams, Jr.
Vice President, Nuclea n arations ROW:0LW/skd cc: Region.O Aaministrator, Region IV.
ATTN: Mr. T. F. Westerman, Chief Projects Section B T
Mr. Robert Farrell.
Senior Ris Ment 'InspN. tor Fort St. Vrpin-L w
g 4
h e
1-y a
'yk'N 4
- . p P
7 8
.Y v
e++e
+,
.' 4
. -,. ;.,f,p i, ' '
,d,,,
-