ML20149F284

From kanterella
Jump to navigation Jump to search
Notification of CRGR Meeting 129 on 880223 in Bethesda,Md to Review Proposed Final Reg Guide 1.100,Rev 2, Seismic Qualification of Electric & Mechanical Equipment for Nuclear Power Plants & Proposed Resolution of USI A-40
ML20149F284
Person / Time
Issue date: 02/09/1988
From: Jordan E
Committee To Review Generic Requirements
To: Bernero R, Martin T, Ross D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I), NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS), NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES)
References
REF-GTECI-A-40, REF-GTECI-SC, RTR-REGGD-01.100, RTR-REGGD-1.100, TASK-A-40, TASK-OR NUDOCS 8802160159
Download: ML20149F284 (2)


Text

f *tc

-[(

[0,,

UNITED STATES

.W g

NUCLEAR REGULATORY COMMISSION t w;e f j

j

/

WASHINGTON,0, C. 20$55

'%,',',[, /

February 9, 1988 MEMORANDUM FOR:

Robert M. Bernero, NMSS Thomas T. Martin, RI Denwood F. Ross, RES Joseph Scinto, OGC James H. Sniezek, NRR FROM:

Edward L. Jordan, Chairman Committee to Review Generic Requirements

SUBJECT:

CRGR MEETING NO. 129 The Committee to Review Generic Requirements (CRGR) will meet in the afternoon on Tuesday, February 23, 1988, in Room 6507 MN88.

The agenda.is as follows:

1-2 p.m.

G. Arlotto will present for CRGR review proposed final Regulatory Guide 1.100, Revision 2, "Seismic Qualification of Electric and Mechanical Equipment for Nuclear Power Plants."

(Review package is enclosed.)

2-3 p.m.

G. Arlotto will present for CRGR review the proposed resolution for USI A-40, "Seismic Design."

(Review package is enclosed.)

If a CRGR member cannot attend the meeting, it is his responsibility to assure that an alternate, who is approved by the CRGR Chairman, attends the meeting.

Persons making presentations to the CRGR are responsible for (1) assuring that the information required for CRGR review is provided to the Committee (CRGR Charter - IV.8), (2) coordinating and presenting views of other offices, (3) as appropriate, assuring that other offices are represented during the presenta-tion, and (4) assuring that agenda modifications are coordinated with the CRGR contact (J. Conran X29855) and others involved with the presentation.

Division Directors or higher management should attend meetings addressing agenda items under their purview.

In accordance with the ED0's March 29, 1984 memorandum to the Commission con-cerning "Forwarding of CRGR Documents to the Public Document Room (PDR)," the enclosure, which contains predecisional information, will not be released to the PDR until the NRC has considered (in a public forum) or decided the matter

{

addressed by the information.

1 8802160159 880209 PDR REVGP NRCCRCR L Jordan, Chairsan MEETING 129 PDR ar Committ e to Review Generic Requirements

/

\\

i

/

Enclosure:

As stated cc:

See next page

Y cc w/ enclosure:

i SECY V. Stello, Jr.

cc w/o enclosure:

Commission (5)

J. Lieberman S. Ebneter W. Mcdonald Regional Administrators W. Parler G.~Arlotto Distribution:

E. Jordan J. Heltemes J. Conran C. Sakenas R. Fraley B. Doolittle (w/o enc.)

CRGR CF (w/o enc.)

CRGR SF S. Treby (w/o enc.)

T. Rehm (w/o enc.)

J. Johnson, OEDO PDR (NRC/CRGR) (w/o enc.)

tCentral = File:(w/o' enc; )

l

)

0FC :

CR A

AE0[

D

C/CRGR: AE00 :

,P NAME :

onran:cg : CJ emes : ELJordan DATE :

2/4/'/88

2/A,/88 2/ /88

_ _ _