AUG - a D N
Docket / License No. 50-277/DPR-44
50-278/DPR-56
Mr. D. M. Smith
Senior Vice President-Nuclear
PECO Energy Company
Correspondence Control Desk
P. O. Box 195
Wayne, PA 19087-0195
Dear Mr. Smith:
SUBJECT:
COMBINED INSPECTION 50-277/94-010 AND 50-278/94-010
This letter transmits the findings of the resident safety inspection conducted by Messrs. W. L.
Schmidt, F. P. Bonnett, and R. K. Ierson, from June 5,1994, through July 16,1994, at the
Peach Bottom Atomic Power Station, Delta, Pennsylvania. The inspectors based these findings
on observations of activities, interviews, and document reviews, and discussed them with Mr.
G. Edwards of your staff.
The plant staff operated both units safely threnhout the period. Your operators performed
well during entry into the Unit 2 end of cycle wastdown operation and in response to alarm
conditions on both units. Two low safety significance events occurred due to a weakness in
self-checking indicating the need for continued management focus in this area.
Generally, your plant engineering staff provided good resolution of equipment operational
issues. However, the disposition of a non-conformance report involving the vibration of a
steam drain line on the Unit 3 high pressure coolant injection system failed to resolve the
problem and did not address fatigue failure concerns. Additionally, we opened an unresolved
item due to our concern regarding the number of safety-related solenoid valve failures.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and
its enclosures will be placed in the NRC Public Document Room.
We appreciate your cooperation.
Sincerely,
ORIGINA1. SIGNED BY
EDWARD C. WENZiNGER
-
Edward C. Wenzinger, Chief
( L. -
Projects Branch 2
-
Division of Reactor Pmjects
9408100024 940B04
ADOCK 05000277
l8
G
T'.
__
._
_ _ _ _ _ _ -
_
- f3 - 4 1994
.
Mr. D. M. Smith
2
Enclosure:
1. NRC Region I Combined Inspection Report 50-277/94-010 and 50-278/94-010
cc w/ encl:
J. Doering, Chairman, Nuclear Review Board
G. Rainey, Vice President, Peach Bottom Atomic Power Station
W. H. Smith, III, Vice President, Nuclear Station Support
D. B. Fetters, Dinctor, Nuclear Engineering
C. Schaefer, External Operations - Nuclear, Delmarva Power & Light Co.
G. Edwards, Plant Manager, Peach Bottom Atomic Power Station
A. J. Wasong, Manager Experience Assessment, Peach Bottom Atomic Power Station
G. A. Hunger, Jr., Director, Licensing
J. W. Durham, Sr., Senior Vice President and General Counsel
J. A. Isabella, Director, Generation Projects Department, Atlantic Electric
j
B. Gorman, Manager, External Affairs
l
R. Mclean, Power Plant Siting, Nuclear Evaluations
(
D. Poulson, Secretary of Harford County Council
R. Ochs, Maryland Safe Energy Coalition
J. H. Walter, Chief Engineer, Public Service Commission of Maryland
Public Document Poom (PDR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
K. Abraham, PAO (2)
NRC Resident Inspector
Commonwealth of Pennsylvania
TMI - Alert (TMIA)
1
(
e
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . _
'
,
.
1
AUG - 4 199d
.
Mr.1). M. Smith
3
bec w/ encl:
Region I Docket Room (with concurrences)
K. Gallagher, DRP
bec w/ encl: (Via E-Mail)
i
W. Dean, OEDO
S. Dembek, NRR
C. Miller, PDI-2, NRR
M. Shannon, ILPB
.
i
/?
RI:
D
DR
'
Schmidt
In erson
. enzinger
7/29/94
7/29/94
/94
l
a:94-010.rev
OFFICIAL RECORD COPY
- f f h
>