Forwards Insp Repts 50-277/94-10 & 50-278/94-10.No Violations Noted
ML20149F183
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 08/04/1994
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Danni Smith
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20149F188 List:
References
NUDOCS 9408100024
Download: ML20149F183 (3)


See also: IR 05000277/1994010

Text

. . . . . ,

.,

,(

.

AUG - a D N

Docket / License No. 50-277/DPR-44

50-278/DPR-56

Mr. D. M. Smith

Senior Vice President-Nuclear

PECO Energy Company

Correspondence Control Desk

P. O. Box 195

Wayne, PA 19087-0195

Dear Mr. Smith:

SUBJECT: COMBINED INSPECTION 50-277/94-010 AND 50-278/94-010

This letter transmits the findings of the resident safety inspection conducted by Messrs. W. L.

Schmidt, F. P. Bonnett, and R. K. Ierson, from June 5,1994, through July 16,1994, at the

Peach Bottom Atomic Power Station, Delta, Pennsylvania. The inspectors based these findings

on observations of activities, interviews, and document reviews, and discussed them with Mr.

G. Edwards of your staff.

The plant staff operated both units safely threnhout the period. Your operators performed

well during entry into the Unit 2 end of cycle wastdown operation and in response to alarm

conditions on both units. Two low safety significance events occurred due to a weakness in

self-checking indicating the need for continued management focus in this area.

Generally, your plant engineering staff provided good resolution of equipment operational

issues. However, the disposition of a non-conformance report involving the vibration of a

steam drain line on the Unit 3 high pressure coolant injection system failed to resolve the

problem and did not address fatigue failure concerns. Additionally, we opened an unresolved

item due to our concern regarding the number of safety-related solenoid valve failures.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and

its enclosures will be placed in the NRC Public Document Room.

We appreciate your cooperation.

Sincerely,

ORIGINA1. SIGNED BY

EDWARD C. WENZiNGER l

!

- Edward C. Wenzinger, Chief I

I

( L. - - Projects Branch 2

Division of Reactor Pmjects

1

9408100024 940B04

PDR ADOCK 05000277 l8 I

G PDR #

__ ._ _ _ _ _ _ _ - _

.

  1. f3 - 4 1994

T'.

Mr. D. M. Smith 2

Enclosure:

1. NRC Region I Combined Inspection Report 50-277/94-010 and 50-278/94-010

cc w/ encl:

J. Doering, Chairman, Nuclear Review Board

G. Rainey, Vice President, Peach Bottom Atomic Power Station

W. H. Smith, III, Vice President, Nuclear Station Support

D. B. Fetters, Dinctor, Nuclear Engineering

C. Schaefer, External Operations - Nuclear, Delmarva Power & Light Co.

G. Edwards, Plant Manager, Peach Bottom Atomic Power Station

A. J. Wasong, Manager Experience Assessment, Peach Bottom Atomic Power Station

G. A. Hunger, Jr., Director, Licensing

J. W. Durham, Sr., Senior Vice President and General Counsel

J. A. Isabella, Director, Generation Projects Department, Atlantic Electric

j B. Gorman, Manager, External Affairs

l R. Mclean, Power Plant Siting, Nuclear Evaluations

( D. Poulson, Secretary of Harford County Council

R. Ochs, Maryland Safe Energy Coalition

J. H. Walter, Chief Engineer, Public Service Commission of Maryland

Public Document Poom (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

K. Abraham, PAO (2)

NRC Resident Inspector

Commonwealth of Pennsylvania

TMI - Alert (TMIA)

1

(

e

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . _

,

'

.

1

1

AUG - 4 199d

.

Mr.1). M. Smith 3

bec w/ encl:

Region I Docket Room (with concurrences)

K. Gallagher, DRP l

l

bec w/ encl: (Via E-Mail) i

W. Dean, OEDO l

S. Dembek, NRR

C. Miller, PDI-2, NRR

M. Shannon, ILPB

l

I

.

i

/?

RI: DRP D DR '

Schmidt In erson . enzinger

7/29/94 7/29/94 /94 l

a:94-010.rev

OFFICIAL RECORD COPY